WELDING INSPECTION REPORT

Project : IKAN,RDMP RU V BALIKPAPAN Subcon : DA6 Date : 2024-03-16


Report No : VT-DA6-240316-03 Location : 321R03 (ABOVE GROUND)
Result Shop/ Welder No
No ISO DWG Rev Field Spool No. Type Joint Size Sch./Thick. Mat. Class WPS Date Base Mat'l Heat No Remark
ACC REJ Welder1 Welder2
W-3038 DH-CCC20-M DH-CCC20-M
1 321R03-CWR-003-01 001 F Attach S3 0.00 - 12CB2S02 JO-WPS-ASME-007 2024-03-13
90 DEG ELL LR BW978
W-3321 DAP-C32 DAP-C32
2 321R03-CWS-001-03 001 F Attach S6 0.00 - 12CB2S02 JO-WPS-ASME-008 2024-03-13
PIPE R71968
W-3038 DG-C32 DG-C32
3 321R03-CWS-001-05 001-A F Attach S4 0.00 - 12CB2S02 JO-WPS-ASME-008 2024-03-13
PIPE R71968
W-3363 DH-CCC20-M DH-CCC20-M
4 321R03-CWS-023-01 002 F Attach S3 0.00 - 12CB2S02 JO-WPS-ASME-001 2024-03-13
90 DEG ELL LR BW978

Inspection by Subcontractor IPMT


Name
Signature
Date
Form No. : ITR-PI-002
1/1