Development of road from Bannerghatta on SH-87 to Besthamanahalli on SH-35 (Including Anekal Bypass, Grade Separator across Chandapura Road

and ROB across railway line) jigani, Haragadde


and Indalwadi (Km 0+000 to 22+980) in Bengaluru (Package – 3B).
RFI / PROGRAMME FOR 09/06/2021
Highway
BOQ Submission Inspection
Sl no. RFI no. Description From To Length Side Time Remarks
item no Date date
1 KRDCL/KMV/HWY/484 0 6/8/2021 6/9/2021
2 KRDCL/KMV/HWY/485 0 6/8/2021 6/9/2021
3 KRDCL/KMV/HWY/486 0 6/8/2021 6/9/2021

Structure
BOQ Submission Inspection
Sl no. RFI no. Description From To Length Side Time Remarks
item no Date date
Shuttering and Reinforcement Checking for Drain
1 28.8.2 KRDCL/KMV/STR/6076 03+575 03+585 10 RHS 6/8/2021 6/9/2021 10.00 AM
Walls
2 27.27 KRDCL/KMV/STR/6077 RCC M-20 Concrete Pouring for Drain Walls 03+575 03+585 10 RHS 6/8/2021 6/9/2021 10.15 AM
3 28.1 KRDCL/KMV/STR/6078 Drain Weep Holes 03+575 03+585 10 RHS 6/8/2021 6/9/2021 10.00 AM
Shuttering and Reinforcement Checking for Drain
4 28.8.2 KRDCL/KMV/STR/6079 03+601 03+606 5 RHS 6/8/2021 6/9/2021 10.45 AM
Walls
5 27.27 KRDCL/KMV/STR/6080 RCC M-20 Concrete Pouring for Drain Walls 03+601 03+606 5 RHS 6/8/2021 6/9/2021 11.00 AM
6 28.1 KRDCL/KMV/STR/6081 Drain Weep Holes 03+601 03+606 5 RHS 6/8/2021 6/9/2021 10.45 AM
Shuttering and Reinforcement Checking for Drain
7 28.8.2 KRDCL/KMV/STR/6082 02+225 02+230 5 LHS 6/8/2021 6/9/2021 11.15 AM
Slab
8 27.27 KRDCL/KMV/STR/6083 RCC M-20 Concrete Pouring for Drain Slab 02+225 02+230 5 LHS 6/8/2021 6/9/2021 11.30 AM
LAB
1 KRDCL/KMV/LAB/38 0 6/8/2021 6/9/2021
2 0

SURVEY
1 KRDCL/KMV/SUR/22 0 6/8/2021 6/9/2021
2
3

Contractors Representative Project Management Consultants Rep's