You are on page 1of 24

Description of

SL No Date the work Nos L B D Qty File No


1 6/11/2021 186 19
6/11/2021 160
6/25/2021 140
7/9/2021 185
7/23/2021 17
7/23/2021 92
7/23/2021 133
7/23/2021 60
7/23/2021 39
8/6/2021 12.5
8/6/2021 8
8/6/2021 71
8/6/2021 84
8/6/2021 180.5
8/20/2021 165.7
8/20/2021 70
9/3/2021 70
9/17/2021 56
9/17/2021 56
9/17/2021 25.5
9/17/2021 25.5
9/17/2021 236
9/17/2021 33
9/17/2021 106
9/17/2021 170.5
10/2/2021 236
10/2/2021 32.5
10/2/2021 14.8
10/2/2021 17.7
10/14/2021 269
10/14/2021 18
11/2/2021 251
wall-6' (0.9*1m- Vent Size)
Slab w-1.2m, t-100mm
Slab w-1m, t-100mm
Slab w-1.2m, t-100mm
Deck Slab
3" -t
2"-t
3" -t
Slab w-1.2m, t-100mm

Slab
Slab
Slab w-1.2m, t-100mm
wall h-3", t-0.15
Slab w-1.2m, t-100mm
Slab w-1.2m, t-100mm
wall h-3", t-0.15
Slab (3*4)-vent size
wall
wall
wall 2*2 -vent size
Slab
Slab
Slab w-1.2m, t-100mm
wall -3*4' vent
Slab
Slab t-300mm
Wall -6'
Deck slab-300mm
Slab (3*2')-size of vent 908-wall
Median Work

Median /Divider Construction- From


CH:1.550 to 2.00 (From NH-4 to MLA
5/29/2021 home) - Two side wall M 776 Mubarak MD

Two Sides wall

PWD- Median / Divider Construction


6/11/2021 From CH: 0.530 to 0.750 - Two Side wall m 432
Two Sides wall (From HDFC Bank to
Reliance petrol Pump)

Median /Divider Construction from


CH:0.200 to 0.530 from KSRTC Bus stand
6/25/2021 to HDFC Bank)-Two side wall M 644.6
Median/Divider Construction from (CH:
7/9/2021 0.750 to 1.00km near Azad Mill) M 385
10/2/2021 SHDP Road median Work M 194
11/12/2021 SHDP Road median Work M 343
11/26/2021 SHDP Road median Work M 222

SHDP Road median Work CH: 269.785 to


269.285 including barbending,
12/10/2021 Shuttering, PCC & Raft M 329

SHDP Road median Work CH: 269.285 to


268.945 including barbending,
12/11/2021 Shuttering, PCC & Raft M 324

SHDP Road median Work CH: 269.785 to


269.285 including barbending,
Shuttering, PCC & Raft at Post office and
1/6/2022 kanaka circle M 155
1/21/2022 170

PCC 2 2758 0.45 0.15 372.33


M20 for triangle portion 2 2758 0.075 413.7
M20 for Rectangular portion 2 2758 0.2 1.5 1654.8
Total 2440.83
Manhole
Description of the
SL No Date work Qty Name of the contractor

1 6/11/2021 Manhole Raising NO.S Ravikumar


SHDP Road 13
PWD Road 2

2 6/25/2021 Manhole Raising Ravi Kumar


SHDP Road 2
PWD Road 1

3 10/2/2021 Man Hole raising 7 Ramachandranna


4 10/13/2021 Manhole Raising 8 Ramachandranna
5 11/12/2021 Manhole Raising 22 Ramachandranna
11/26/2021 Manhole Raising 9 Ramachandranna
64

NO.S L B D Cum
M20
64 4.7 0.6 0.2 36.096
Culvert
3/31/2021 Kotesh B Box Culvert Quantity
Concrete

1 Concrete for PCC Cum 1 15 3.3 0.15 7.425

2 Concrete for Raft Cum 1 15 2.7 0.35 14.175

3 Concrete for Walls Cum 2 15 0.35 2 21

4 Concrete for Slab Cum 1 15 2.7 0.35 14.175

Shuttering

Shuttering for PCC Sqm 2 15 0.15 4.5

Shuttering for Raft Sqm 2 15 0.35 10.5

Shuttering for Sides Sqm 2 2.7 0.35 1.89

Shuttering for Wall Sqm 4 15 2 120

Shuttering for Slab Sqm 1 15 2 30

Shuttering for Sides Sqm 2 15 0.35 10.5

Shuttering for Sides Sqm 2 2.7 0.35 1.89

Total 179.28

Steel

Barbending MT

Raft- Main Bar 30 15 0.711

Raft- Distribution Bar 154 3.1 0.424886

Wall- Main Bar 344 2.6 1.413152

Wall-Distribution Bar 52 15 0.6942

Slab- Main Bar 30 15 0.711

Slab-Distribution Bar 154 3.1 0.424886

Chairs 0.2

Total 4.579124
PiPe Culvert Both side
6/25/2021 Abhishek (90mm wall Thick) NO.s 2
Pipe Culvert Head wall
6/9/2021 Abhishek Concreting NO.S 2

PWD

Pipe Culvert Head wall


at JMIT Circle CH: 2.00
11/26/2021 Manjunath RHS
PCC Cum 1 12 1 0.15 1.8
1 12 0.6 2.1 15.12
M20 Cum 1 12 0.45 1.2 6.48
Shuttering Sqft 2 12 0.15 38.736
2 12 2.1 542.304
2 12 1.2 309.888
Steel MT 0.45
Decorative Poles

Decorative Electrical
7/9/2021 Mohamed Riyaz Pole Foundation Cum
PCC 18 1.2 1.2 0.15 3.888
Concrete-M20 18 1.2 1.2 2.4 62.208
8/20/2021 Mohamed Riyaz Decorative Electrical Pole Foundation
PCC Cum 32 1.2 1.2 0.15 6.912
M20 Cum 32 1.2 1.2 2.4 110.592

Shuttering
7/9/2021 Mohamed Riyaz Shuttering Sqft
PCC 2 1.2 0.15 3.8736
Concrete-M20 2 1.2 2.4 61.9776
8/20/2021 Mohamed Riyaz Shuttering
PCC Sqft 2 1.2 0.15 3.8736
M20 Sqft 2 1.2 2.4 61.9776

Steel
7/9/2021 Mohamed Riyaz Barbending MT
Steel-16mm dia @
200mmc/c 16 24 2.4 0.091008
Steel-8mm dia @
200mmc/c 8 48 1.2 0.022464
8/20/2021 Mohamed Riyaz Barbending
Main bar -16mm dia @MT 16 24 2.4 0.091008
Dist. Bar-8mm dia @ MT 8 48 1.2 0.022464

One Decorative Pole


Mohamed Riyaz Lumpsum NO.s 18 18
One Decorative Pole Lumpsum 32 32
Description
SL No of the work members Nos L B D Qty
1 Tree 2 100 1.1 0.15 0.2 6.6
2 100 0.75 0.15 0.2 4.5
Drain work - Belagatta

SL No Description of the work Nos L B D Qty


3 Left Side-3*2 (3' wall) 2 92 0.15 0.91 25.24
4 Right Side-2*2 (2' wall) 2 133 0.15 0.61 24.72
5 Right Side-3*2 (3' wall) 2 60 0.15 0.91 16.73
6 Left Side Drain Wall (2'*2') 2 71 0.610 0.610 52.796

Size of Vent =2*2 feet (raft


wall Concreting) in Belagatta
7 Village 1 33 0.610 0.610 12.269
8 Cover Slab Over Drain
9 Left Side 1 84 1.2 0.1 10.080

10 Right Side 1 180.5 1.2 0.1 21.660


11 Belagatta Village 1 106 1.2 0.1 12.720
12 Belagatta Deck Slab (3'*1')
13 Right Side 1 12.5 0.91 0.30 3.486
14 Left Side 1 8 0.91 0.30 2.231
15 Drain - Raft 1 269 1.10 0.1 29.59
16 Drain - wall 2 269 0.15 0.9 73.81

18 Deck slab 1 18 0.91 0.30 5.02


19 Drain Slab 1 251 1.2 0.1 30.12
20 Raft 1 180 1.10 0.1 19.80
21 Wall 2 180 0.15 0.91 24.70
22 Drain Cover Slab 1 180 1.2 0.1 21.60
320.48
Drain work - Haikal Village

SL No Description of the work Nos L B D Qty

2 Raft 1 186 0.9 0.15 25.110


3 Wall 1 186 0.15 0.9 25.110
4 Haikal Village 1 170.5 1.2 0.1 20.460
5 Haikal Village -Deck Slab 1 17 0.91 0.1 1.55
72.235
Drain work -PWD

SL No Description of the work Nos L B D Qty


3 Wall 2 70 0.15 0.9 18.9
4 2 56 0.15 0.9 15.12
5 2 25.5 0.15 0.9 6.885
6 2 32.5 0.15 0.9 8.775
7 Slab 185 1.2 0.1 22.2
8 39 1.2 0.1 4.68
9 165.7 1.2 0.1 19.884
10 70 1.2 0.1 8.4
11 56 1.2 0.1 6.72
12 25.5 1.2 0.1 3.06
13 14.8 1.2 0.1 1.776
14 140 1.2 0.1 16.8
15 Deck slab 17.7 1.2 0.1 2.124
16 Slab 160 1.2 0.1 19.2
17 Raft 1 35 0.15 0.91 4.7775
18 Wall 2 35 0.15 0.9 4.80
19 Raft 1 71 0.15 0.9 9.59
20 Wall 2 71 0.15 0.9 9.74
183.4292
Drain work -362A

SL No Description of the work Nos L B D Qty

2 Raft 1 236 0.9 0.1 21.24


3 Wall 2 236 0.9 0.1 42.48
4 Slab 1 236 0.9 0.1 21.24
Interlocking paver Block Laying
Infront of MLA Home (CH: 1.550 to
8/20/2021 Sachin Shankar 2.000) Sqft
60mm for Footpath
RHS 1 68.5
Deduction for trees -15 No.s
(1.15m *1.15m) -15 1.15
1 19.3
Deduction for trees -3 No.s (1.15m
*1.15m) -3 1.15
1 19.5
Deduction for trees -3 No.s (1.15m
*1.15m) -3 1.15

Interlock Paver Block Laying infront


9/3/2021 Sachin Shankar of MLA Home (CH: 1.550 to 2.00) Sqft
60mm for Footpath
RHS 1 60
1 9
Deduction for Trees (0.95*0.95) -7 0.95
LHS 1 32.7
1 85
1 42.1
Deduction for Trees (0.95*0.95) -18 0.95
60mm for footpath
1 69.7
1 3.8
1 5.4
Deduction for Trees (1.05*1.05) -10 1.05
RHS - 60mm for Footpath 1 30
1 40
Deduction for Trees (1.05*1.05) -5 1.05
11/12/2021 Nagaraj H 60mm for Footpath 1 8.9
1 4.5
1 11.2
1 2.8
1 9
Deduction for Trees -4 1.15
11/26/2021 Nagaraj 60mm for walkpath
1 4.7
1 12.5
1 29.8
12/23/2021 Nagaraj 60mm for walkpath 1 43
80mm for Walkpath
LHS 1 45
80mm for walkpath
RHS 1 68.5
Deduction for Chamber -2 0.9
LHS 1 24.6
Interlock paver Block laying Infront
9/17/2021 Sachin Shankar K M of MLA Home (CH: 1.550 to 2.000) Sqft
RHS - 75mm for Walkpath 1 66.3
Deduction for Chambers - 2 Nos -2 0.9
LHS 1 10.5
1 14.8
Deduction for trees -1 0.95
1 13.2
1 4
Interlock paver Block Laying (ICBP)
infront of MlA Home (Ch: 1.550 to
10/2/2021 Sachin Shankar K M 2.000) Sqft

LHS- 75mm for walkpath at VR


Café welcomw Board 1 6.2
1 7.5
1 7
1 7.65
1 168
Deduction for Chamber - 3 Nos -3 0.9
Interlock Paves from CH : 1+550 to
11/12/2021 Nagaraj H 2.00 1 128.6
75mm for walkpath 1 7
Approach Roads 1 5.1
11/26/2021 Nagaraj 75mm for walkpath
LHS 1 7.7
1 8.7
1 8
1 15
RHS 1 5.9
1 32.8
1 7.8
12/23/2021 Nagaraj 75mm for walkpath 1 43
1 7
3.35 2469.151

1.15 -213.4515
3.75 778.755

1.15 -42.6903
2.96 621.0672
1.15 -42.6903

3.4 2195.04
3.1 300.204
0.95 -67.9763
2.4 844.4448
2 1829.2
1.92 869.7523
0.95 -174.7962

1.7 1274.952
0.7 28.6216
1.45 84.2508
1.05 -118.629
2.35 758.58
3 1291.2
1.05 -59.3145
2.35 225.0454
1.4 67.788
1.7 204.8704
2.5 75.32
0.8 77.472
1.15 -56.9204

1.9 96.0868
3 403.5
1.9 609.2312
2 925.36
15253.42 1417.605
1.5 726.3

1.5 1105.59
0.9 -17.4312
1.5 397.044

1.5 1070.082
0.9 -17.4312
2.6 293.748
4 636.992
0.95 -9.7109
1.5 213.048
2.8 120.512

1.5 100.068
2.5 201.75
1.5 112.98
3.3 271.6362
1.5 2711.52
0.9 -26.1468

1.5 2075.604
2.3 173.236
3.7 203.0412
2618.147
1.8 149.1336
1.8 168.5016
1.8 154.944
1.5 242.1
3.5 222.194
1.5 529.392
3.6 302.1408
1.5 694.02
1.5 112.98
12917.84 1200.543
Kerbs Stone Fixing infront
17 4/3/2021 G Jayarama Gowda of MLA home RHS M 1

Kerbs Stone Fixing infront


21 4/17/2021 Jayaram of MLA home RHS m 1

Kerb Stone Fixing infront


of MLA Home from(CH:
57 7/23/2021 KM Sachin Shankar 1.550 to 2.00O LHS
(400*200)- LHS 1
RHS 1

Kerbstone Fixing in PWD


62 8/20/2021 Sachin Shankar Road (CH;1.550 to 2.000) M
LHS- at Welcome Board 1
RHS- at gas Bunk & Khan Tyres 1
6/26/2021 300
7/23/2021 386
8/6/2021 480
1166
524.7
12/10/2021 Nagaraj Kerbstone Fixingin PWD Road
CH: 1+550 to 2.00 RHS M 1
Ch:0.200 to 0.250LHS M 1

Guard Stone S Curve


Hariyabbe NO.s 250
75 75 PWD Road work

45 45

305.6 305.6
79 79

25.8 25.8
102.8 102.8
purchased 633.2
purchased
purchased 1407.111

55.8 55.8
46.6 46.6 735.6
1634.667

250
Drain - PWD
M20
Nos L B D Qty
Slab 185 1.2 0.1 22.2
39 1.2 0.1 4.68
165.7 1.2 0.1 19.884
70 1.2 0.1 8.4
56 1.2 0.1 6.72
25.5 1.2 0.1 3.06
14.8 1.2 0.1 1.776
17.7 1.2 0.3 6.372
73.092

M20
Nos L B D Qty
Wall 2 70 0.9 0.15 18.9
2 56 0.9 0.15 15.12
2 25.5 0.9 0.15 6.885 122.772
2 32.5 0.9 0.15 8.775
49.68

PCC
Nos L B D Qty
Wall 1 70 1.1 0.1 7.7
1 56 1.1 0.1 6.16
1 25.5 1.1 0.1 2.805
1 32.5 1.1 0.1 3.575
20.24
362B
7/23/2021 Abhishek Drain work - Belagatta
Belagatta Village-PCC
Belagatta Village-Raft
Left Side-3*2 (3' wall) 92
Right Side-2*2 (2' wall) 133
Right Side-3*2 (3' wall) 60
Slab
8/6/2021 Abhishek Belagatta Deck Slab (3'*1')
Right Side 12.5
Left Side 8

Left Side Drain Wall (2'*2') 71


Cover Slab Over Drain
Left Side 84
Right Side 180.5

Size of Vent =2*2 feet (raft


wall Concreting) in Belagatta
Village 33
9/17/2021 Abhisheq Drain Measurements M
Drain Cover slab
Belagatta Village 106
Haikal Village 170.5
Haikal Village -Deck Slab 17
Wall 186
10/15/2021 Abhisheq Drain - Raft 269
Drain - wall 269
PCC 269
Deck slab 18
11/12/2021 Abhisheq Drain Slab 251

950.5
M20
1 390 1.10 0.1 42.90 PCC
1 389 1.10 0.1 PCC
2 92 0.15 0.91 25.24 1 92
2 133 0.15 0.61 24.72 1 71
2 60 0.15 0.91 16.73 1 33

1 12.5 0.91 0.30 3.486


1 8 0.91 0.30 2.231

2 71 0.610 0.610 52.796

1 84 1.2 0.1 10.080


1 180.5 1.2 0.1 21.660

1 33 0.610 0.610 12.269 356

1 106 1.2 0.1 12.720


1 170.5 1.2 0.1 20.460
1 17 0.91 0.1 1.55

1 269 1.10 0.1 29.59


2 269 0.15 0.9 73.81
1 269 1.10 0.1 29.59
1 18 0.91 0.30 5.02
1 251 1.2 0.1 30.12

414.987
PCC
PCC
1.1 0.1 10.12
1.1 0.1 7.81
1.1 0.1 3.63

21.56
PCC
Description of the
SL No work Unit Nos Length(m) Width(m) Depth (m) Qty (m)

Decorative Electrical
1 Pole Foundation Cum 10.8
4 Culvert 15.165

5 Manhole PCC
7 Median 458.3
6 Drain - 209.66
693.925

M20
Description of the
SL No work Unit Nos Length(m) Width(m) Depth (m) Qty (m)
1 Median Cum 2241
Manhole Cum 36.09
Box Culvert Cum 110.43
Decorative poles Cum 172.8
Drain- Cum 661
tress 11
drain haunch 120
3352.32
Description of
SL No the work Unit Nos Length(m) Width(m) Depth (m) Qty (m)
1 Median Cum 1941
Manhole Cum 64 4.7 0.6 0.2 36.096
Box Culvert Cum 70.95
Decorative poles Cum 172.8
Drain- PWD Cum 183.48
Drain -362B Cum 392.71
Drain -362A Cum 84.96
2881.996
Unit PWD 362A 362B
M10-PCC Cum 309.18 31.46 144.22 484.86
M20 Cum 1102.21 102.96 755.29 1960.46
DLC Cum 3200 4108.17 839 8147.17
PQC Cum 5696.32 8015.92 1635.22 15347.46
GSB Cum 5773.69 2836 7210 15819.69
WMM Cum 261.83 3051 3312.83
Steel MT 62.43 5.74 18.66 86.83
75MM Pavers Sqm 2181 2181
60MM Pavers Sqm 3194 3194
Kerbstones Sqm 2779 2779
NP3 Pipes-600MM dia M 200 200
NP3 Pipes-900MM dia M 50 50