This document is a work done certificate for the construction of a medical college, girls and boys hostels, teaching and non-teaching staff quarters, and other allied works at Tegeru Village, Kasaba Hobli, Chikkamagaluru Taluk in Chikkamagaluru District. It details the approved tender cost of Rs. 3027984313 and agreement period of 24 months. It provides a table listing 14 items of work completed in 2020-21 and 2021-22, including quantities of excavation, shuttering works, concrete, reinforcement, and piping installed.
This document is a work done certificate for the construction of a medical college, girls and boys hostels, teaching and non-teaching staff quarters, and other allied works at Tegeru Village, Kasaba Hobli, Chikkamagaluru Taluk in Chikkamagaluru District. It details the approved tender cost of Rs. 3027984313 and agreement period of 24 months. It provides a table listing 14 items of work completed in 2020-21 and 2021-22, including quantities of excavation, shuttering works, concrete, reinforcement, and piping installed.
This document is a work done certificate for the construction of a medical college, girls and boys hostels, teaching and non-teaching staff quarters, and other allied works at Tegeru Village, Kasaba Hobli, Chikkamagaluru Taluk in Chikkamagaluru District. It details the approved tender cost of Rs. 3027984313 and agreement period of 24 months. It provides a table listing 14 items of work completed in 2020-21 and 2021-22, including quantities of excavation, shuttering works, concrete, reinforcement, and piping installed.
CONSTRUCTION OF MEDICAL COLLEGE ,GIRLS AND BOYS HOSTEL, TEACHING & NON TEACHING STAFF QUARTERS AND OTHER Name of the Work: ALLIED WORKS AT TEGERU VILLAGE, KASABA HOBLI, CHIKKAMAGALURU TALUK IN CHIKKAMAGALURU DISTRICT Name of the Contractor: Sir V. SEKAR Agency: M/s Balajikrupa Projects Pvt Ltd, Bangalore Approved tender Cost: Rs:3027984313 Agrement Number: 57/2020-21 Dated 23/10/2020 Period of work: 24 months Sl No Particulars BOQ ITEM NO Unit 2020-21 2021-22 1 Earthwork Excavation by manual 2 Cum 2856.00 1198.00 2 Earthwork Excavation for foundation of structures 7 Cum 94573.86 6115.15 3 Earthwork in all soil deposits 6 Cum 4458.12 4 Earthwork for lowering and levelling 89 Cum 25881.40 463.19 5 Anti Termite Treatment 10 Sqm 17782.04 6 T.M.T Steel 343 MT 350 3266.96 7 22 24 25 27 28 30 356 400 401 402 403 404 411 412 413 414 415 422 Shuttering Works 76503.90 427 428 429 430 431 438 439 441 442 459 460 461 462 463 Sqm 250.55 8 M7.5-PCC-1:4:8 47 Cum 443.96 1760.30 9 M10-PCC-1:3:6 32 33 Cum 1575.96 10 RCC M25 EIRL Cum 6500.74 11 RCC M30 358 Cum 18574 12 ERW CASING PIPE 150 MM Rmt 37.2 13 PVC CONCEALED CONDUIT PIPE 20 MM DIA 932 Rmt 15281.36 14 PVC CONCEALED CONDUIT PIPE 25 MM DIA 933 Rmt 3052.57