UNIT SN : ALAMAT : PT.

GAWI BAHAND
ENINE NUMBER : NAMA OPERATOR : SURUTO
Periode Bulan &Tahun : SEPTEMBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N MOUNDING
PARIT/HM

1 1-Sep-2021 0
2 2-Sep-2021 0
3 3-Sep-2021 0
4 4-Sep-2021 0
5 5-Sep-2021 907 910 3 G.REDING
6 6-Sep-2021 0
7 7-Sep-2021 910 918 8 G.REDING
8 8-Sep-2021 918 925 7 G.REDING
9 9-Sep-2021 925 934 9 G.REDING
10 10-Sep-2021 934 945 11 G.REDING
11 11-Sep-2021 0
12 12-Sep-2021 0
13 13-Sep-2021 0
14 14-Sep-2021 0
15 15-Sep-2021 0
16 16-Sep-2021 945 953 8 G.REDING
17 17-Sep-2021 953 963 10 G.REDING
18 18-Sep-2021 963 973 10 G.REDING
19 19-Sep-2021 973 982 9 G.REDING
20 20-Sep-2021 982 990 8 G.REDING
21 21-Sep-2021
22 22-Sep-2021 990 996 6 G.REDING
23 23-Sep-2021 0
24 24-Sep-2021 996 1004 8 G.REDING
25 25-Sep-2021 1004 1013 9 G.REDING
26 26-Sep-2021 0
27 27-Sep-2021 1013 1016 3 G.REDING
28 28-Sep-2021 0
29 29-Sep-2021 0
30 30-Sep-2021 0
TOTAL 109 - -

UNIT SN : ALAMAT : PT. GAWI BAHAND


ENINE NUMBER : NAMA OPERATOR : SURUTO
Periode Bulan &Tahun : OKTOBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N MOUNDING
PARIT/HM

1 1-Oct-2021 0
2 2-Oct-2021 0
3 3-Oct-2021 0
4 4-Oct-2021 0
5 5-Oct-2021 0
6 6-Oct-2021 0
7 7-Oct-2021 0
8 8-Oct-2021 0
9 9-Oct-2021 0
10 10-Oct-2021 0
11 11-Oct-2021 1019 1021 2 GREDING
12 12-Oct-2021 1021 1030 9 GREDING
13 13-Oct-2021 1030 1035 5 GREDING
14 14-Oct-2021 0
15 15-Oct-2021 0
16 16-Oct-2021 1035 1040 5 GREDING
17 17-Oct-2021 0
18 18-Oct-2021 1040 1049 9 GREDING
19 19-Oct-2021 1049 1051 2 SEROK LATRIT
20 20-Oct-2021 0
21 21-Oct-2021 1051 1059 8 GREDING
22 22-Oct-2021 1059 1065 6 GREDING
23 23-Oct-2021 0
24 24-Oct-2021 0
25 25-Oct-2021 0
26 26-Oct-2021 0
27 27-Oct-2021 0
28 28-Oct-2021 0
29 29-Oct-2021
30 30-Oct-2021 0
31 31-Oct-2021 0
TOTAL 46 - -

UNIT SN : ALAMAT : PT. GAWI BAHAND


ENINE NUMBER : NAMA OPERATOR : SURUTO
Periode Bulan &Tahun : NOVEMBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N MOUNDING
PARIT/HM

1 1-Nov-2021 0
2 2-Nov-2021 0
3 3-Nov-2021 0
4 4-Nov-2021 0
5 5-Nov-2021 0
6 6-Nov-2021 0
7 7-Nov-2021 0
8 8-Nov-2021 0
9 9-Nov-2021 0
10 10-Nov-2021 0
11 11-Nov-2021 0
12 12-Nov-2021 0
13 13-Nov-2021 0
14 14-Nov-2021 0
15 15-Nov-2021 0
16 16-Nov-2021 0
17 17-Nov-2021 1065 1071 6 GREDING
18 18-Nov-2021 1071 1080 9 GREDING
19 19-Nov-2021 1080 1091 11 GREDING
20 20-Nov-2021 0
21 21-Nov-2021 8
22 22-Nov-2021 1091 1099 8 GREDING
23 23-Nov-2021 1099 1105 6 GREDING
24 24-Nov-2021 0
25 25-Nov-2021 1105 1116 11 GREDING
26 26-Nov-2021 0
27 27-Nov-2021 0
28 28-Nov-2021 0
29 29-Nov-2021
30 30-Nov-2021 0
TOTAL 59 - -
: PT. GAWI BAHANDEP
ERATOR : SURUTO
:
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI

1X1 BBM SHI TERPAKAI BBM KERJA


TERPAKAI

36 F54/55,TR6,F.54

96 TR.7,52,53,G.52/53,F54/55
84 TR.6,G.51/52,G.50/51
108 G.49/50,G.48/49,G.47/48,G.43/44
132 TR.6 50-40,G.46/47,G.45/46

96 I49/50,I48/49,I47/48,I46/47
121 TR.9,H48/49,H47/48,H46/47,H45/46
123 TR.43/42,H43/44,G44/43
108 F.39/40,F40/41,F.41/42,F42/43
96 F.43/44,F.44/45,F.45/46,F46/47

75 TR.7.40-48,E.40/41

97 E.41/42,E.42/43,E.43/44,
108 TR.5.39-46,E.45/46,E.47/48

36 E.46/47,E.48/49

0 1316 0 0

: PT. GAWI BAHANDEP


ERATOR : SURUTO
:
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI
1X1 BBM SHI TERPAKAI BBM KERJA
TERPAKAI

E.51/52
132 E.49/50, E.52/53, F.47/48, F.48/49, F.49/50
60 TR.7-47-52, F.50/51

55 TR.6 42-52, F.51/52

108 F.52/53, E.50/51, E.53/54, E.54/55


TR.3

121 F.55/56, F.57/58, G.55/56, G.56/57, G.57/58


74 TR.5.58-67

0 550 0 0

: PT. GAWI BAHANDEP


ERATOR : SURUTO
:
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI

BBM
1X1 SHI TERPAKAI BBM KERJA
TERPAKAI
75 D.50/51, D.56/57, D.57/58
110 TR.4.50-46, TR.5.58-50, TR.5.49
135 TR.6.55-63, E.56/57, E.51/58, E.58/59

96 F.56/57, F.58/59, E.56/57, E.57/58


75 F.59/60, F.60/61, F.61/62

132 TR.7.55-60, TR.8.54-56, G.58/59, G.59/60, G.54/55

0 623 0 0
UNIT SN : ALAMAT : PT. GAW
ENINE NUMBER : NAMA OPERATOR : DEDI
Periode Bulan &Tahun : SEPTEMBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N
PARIT/HM

1 1-Sep-2021 0
2 2-Sep-2021 0
3 3-Sep-2021 0
4 4-Sep-2021 0
5 5-Sep-2021 0
6 6-Sep-2021 0
7 7-Sep-2021 0
8 8-Sep-2021 0
9 9-Sep-2021 30 33 3 KOMPEK
10 10-Sep-2021 0
11 11-Sep-2021 0
12 12-Sep-2021 0
13 13-Sep-2021 0
14 14-Sep-2021 0
15 15-Sep-2021 0
16 16-Sep-2021 0
17 17-Sep-2021 0
18 18-Sep-2021 0
19 19-Sep-2021 0
20 20-Sep-2021 0
21 21-Sep-2021
22 22-Sep-2021 0
23 23-Sep-2021 0
24 24-Sep-2021 0
25 25-Sep-2021 0
26 26-Sep-2021 0
27 27-Sep-2021 33 36 3 KOMPEK
28 28-Sep-2021 0
29 29-Sep-2021 36 42 6 KOMPEK
30 30-Sep-2021 0
TOTAL 12 -

UNIT SN : ALAMAT : PT. GAW


ENINE NUMBER : NAMA OPERATOR : DEDI
Periode Bulan &Tahun : OKTOBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N
PARIT/HM

1 1-Oct-2021 0
2 2-Oct-2021 0
3 3-Oct-2021 0
4 4-Oct-2021 0
5 5-Oct-2021 42 50 8 KOMPEK
6 6-Oct-2021 0
7 7-Oct-2021 0
8 8-Oct-2021 0
9 9-Oct-2021 0
10 10-Oct-2021 0
11 11-Oct-2021 0
12 12-Oct-2021 0
13 13-Oct-2021 0
14 14-Oct-2021 0
15 15-Oct-2021 0
16 16-Oct-2021 0
17 17-Oct-2021 0
18 18-Oct-2021 53 60 7 KOMPEK
19 19-Oct-2021 0
20 20-Oct-2021 0
21 21-Oct-2021 60 63 3 KOMPEK
22 22-Oct-2021 63 65 2 KOMPEK
23 23-Oct-2021 0
24 24-Oct-2021 0
25 25-Oct-2021 0
26 26-Oct-2021 0
27 27-Oct-2021 0
28 28-Oct-2021 0
29 29-Oct-2021 0
30 30-Oct-2021
31 31-Oct-2021 0
TOTAL 20 -

UNIT SN : ALAMAT : PT. GAW


ENINE NUMBER : NAMA OPERATOR : DEDI
Periode Bulan &Tahun : NOVEMBER 2021 HELPER :
PEMAKAIAN UNIT (HM/KM) HASIL KERJA
NO TANGGAL KETERANGAN KERJA PERAWATA
HM AWAL HM AKHIR TTL N
PARIT/HM

1 1-Nov-2021 0
2 2-Nov-2021 0
3 3-Nov-2021 0
4 4-Nov-2021 0
5 5-Nov-2021 0
6 6-Nov-2021 69 74 5 KOMPEK
7 7-Nov-2021 74 76 2 KOMPEK
8 8-Nov-2021 76 81 5 KOMPEK
9 9-Nov-2021 81 85 4 KOMPEK
10 10-Nov-2021 85 90 5 KOMPEK
11 11-Nov-2021 0
12 12-Nov-2021 0
13 13-Nov-2021 0
14 14-Nov-2021 0
15 15-Nov-2021 0
16 16-Nov-2021 0
17 17-Nov-2021 90 98 8 KOMPEK
18 18-Nov-2021 0
19 19-Nov-2021 98 105 7 KOMPEK
20 20-Nov-2021 0
21 21-Nov-2021 0
22 22-Nov-2021 0
23 23-Nov-2021 0
24 24-Nov-2021 0
25 25-Nov-2021 0
26 26-Nov-2021 0
27 27-Nov-2021 0
28 28-Nov-2021 0
29 29-Nov-2021 0
30 30-Nov-2021
TOTAL 36 -
ALAMAT : PT. GAWI BAHANDEP
NAMA OPERATOR : DEDI
HELPER :
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI

MOUNDING 1X1 BBM SHI TERPAKAI BBM KERJA


TERPAKAI

24 J.17/18

24 TR.12

48 TR.12

- 0 96 0 0

ALAMAT : PT. GAWI BAHANDEP


NAMA OPERATOR : DEDI
HELPER :
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI
MOUNDING 1X1 BBM SHI TERPAKAI BBM KERJA
TERPAKAI

60 L.20-25

60 JLN. NEGARA

25 I.14/15

- 0 145 0 0

ALAMAT : PT. GAWI BAHANDEP


NAMA OPERATOR : DEDI
HELPER :
HASIL KERJA PEMAKAIAN MATERIAL SISA LOKASI

BBM
MOUNDING 1X1 SHI TERPAKAI BBM KERJA
TERPAKAI
38 TR.7

55 TR.5
30 JLN. NEGARA
35 PKS. DELTA

45 TR.11, I.13/14

42 D.5

- 0 245 0 0