AC1-209/251021

PROGRESS OF PRE-ARRANGED SHUT DOWNS FOR THE MONTH OF 10-2021__in respect of P&I Bannu________

Shut Down availing


CM&O Approval Detail of works carried out by
Name of Equipment / Date / Time
Sr; # Name of Grid Station
Transmission Line
No. Date Date From To Maint; Staff Line Staff
P/T2 &3-120/26MVA &
1 2891-2901 9/29/2021 132KV GSS KARAK 10/4/2021 08;00 18;00
KRK81
P/T2 &3-120/26MVA &
2 2891-2901 9/29/2021 132KV GSS KARAK 10/5/2021 08;00 22;00
KRK81

3 3101-12 10/5/2021 132KV GSS PEZU P/T1-10/13MVA & PZU81 9/9/2021 09;00 12;00

4 3101-12 10/5/2021 132KV GSS DRABEN P/T2 -20/26MVA & DRB82 10/11/2021 09;00 16;00

5 3101-12 10/5/2021 132KV GSS BANU P/T6 -20/26MVA & BNU86 10/12/2021 09;00 13;00

6 3101-12 10/5/2021 132KV GSS DI KHAN P/T1-31.5/40MVA & DIK81 10/14/2021 08;00 15;00

7 3101-12 10/5/2021 132KV GSS DI KHAN P/T2-31.5/40MVA & DIK82 10/18/2021 08;00 15;00

8 3101-12 10/5/2021 132KV GSS TAJA ZAI P/T4-20/26MVA & TAJ 10/19/2021 09;00 13;00

132KV GSS SARAE


9 3101-12 10/5/2021 P/T2-20/26MVA & SNG82 10/21/2021 09;00 13;00
NAURAG
LINE BREAKER
10 3101-12 10/5/2021 132KV GSS TANK 10/25/2021 09;00 13;00
TNK5,TNK9

11 3101-12 10/5/2021 132KV GSS TANK LINE BREAKER TNK10 10/25/2021 13;00 15;00

12 3101-12 10/5/2021 132KV GSS GURGURI P/T1-10/13MVA & GRI81 10/26/2021 10;00 15;00

13 3101-12 10/5/2021 132KV GSS SABIRABAD P/T1-10/13MVA & SBR81 10/11/2021 09;00 13;00

Page 1 of 4
AC1-209/251021

PROGRESS OF PRE-ARRANGED SHUT DOWNS FOR THE MONTH OF 10-2021__in respect of P&I Bannu________

Shut Down availing


CM&O Approval Detail of works carried out by
Name of Equipment / Date / Time
Sr; # Name of Grid Station
Transmission Line
No. Date Date From To Maint; Staff Line Staff

Page 2 of 4
AC1-209/251021

UT DOWNS FOR THE MONTH OF 10-2021__in respect of P&I Bannu________

Detail of works carried out by

P&I Staff
coupling of capacitor bank panel for trx 2 and trx 3 and
its supply conection i.e AC ,DC and PT supply.
coupling of capacitor bank panel for trx 2 and trx 3 and
its supply conection i.e AC ,DC and PT supply.
the test and acitivites carried out during shutdown.
1,C&DF , IR TEST. 2. Integrity test of
earthing system, 3.differential and O/C and E/F testing
and tripping through 2ndry injetion test set. 4
transformer auxillay protection alam and tripping
through main bucholz, tap changer bucholz. OTI, WTI
and
the PRV.
test and acitivites carried 5 trx
outdc fauilur
during supervison
shutdown.
scheme
1,C&DF tripping.6
, IR TEST.concern incomming and alltest
2. Integrity 11kv
of
earthing O/G tripping
system, and closing.
3.differential andduring
O/C and E/F testing
the test and acitivites carried out shutdown.
and tripping
1,C&DF through 2ndry injetion2.test
, IR TEST. set. test of
Integrity 4
transformer
earthing system, auxillay protection
3.differential and alam
O/C and E/F
and tripping
testing
the test and
through mainacitivites
bucholz, carried out during
tap changer shutdown.
bucholz.
and tripping
1,C&DF through 2ndry
, IR TEST. injetion2.
test set.OTI,
Integrity
WTI
4
test of
and PRV.
transformer auxillay 5 trx
protection dc fauilur
alam andsupervison
tripping
earthing
scheme
the system,
test and 3.differential
tripping.6
acitivitesconcern
carried andduring
O/C and
incomming
out andE/Fall testing
shutdown. 11kv
through main
and tripping bucholz,
through tap changer
2ndry bucholz.
injetion2.
test set.OTI, WTI
4
1,C&DF
and O/G
PRV. , tripping
IR TEST. and closing.
5 trx dcalam Integrity
fauilur test
supervison of
transformer
earthing system, auxillay protection
3.differential and O/C and
and tripping
E/F testing
scheme
the
through tripping.6
test and
mainacitivitesconcern
bucholz, carried incomming
out during
tap changer and OTI,
all 11kv
shutdown.
bucholz.
and tripping
1,C&DF O/G through
tripping
, IR TEST. and2ndry injetion2.
closing. test set. testWTI
Integrity 4
of
and PRV.
transformer auxillay 5 trx
protection dc fauilur
alam supervison
and E/F
tripping
earthing
scheme
the system,
test and 3.differential
tripping.6
acitivitesconcern
carried and O/C
incomming
out during and
and OTI, testing
all 11kv
shutdown.
through main
and tripping bucholz,
through tap changer bucholz.
set. testWTI
1,C&DF
and O/G
PRV. tripping
, IR TEST. and2ndry 5
injetion2.
closing.
trx dc
test
Integrity
fauilur supervison
4
of
transformer
earthing system, auxillay protection
3.differential alam
and O/C andand tripping
schememain
through tripping.6 concern
bucholz, incomming
tap changer andE/Fall testing
11kv
and tripping through
O/G tripping and2ndry injetionbucholz.
closing. test set.OTI, WTI 4
and PRV.
transformer 5
auxillay protectiontrx dc fauilur
alam andsupervison
tripping
the test
schememain and acitivites
tripping.6 carried
concern out during
incomming shutdown.
and OTI,
all 11kv
through
O/C andO/G bucholz,
E/Ftripping
testing andtap changer
trippiing bucholz.
confirmed, zone WTI
wise
and PRV. and closing.
5 trx dc fauilur supervison
boundry determination,timing
the test and acitivites carried and zone wise
out during tripping
shutdown.
scheme
confirmed tripping.6
through concern
distance incomming
relay on and all
particuarzone 11kv
setting
O/C andO/G E/F testing
tripping and closing.
and trippiing confirmed, wise
boundry determination,timing and zone wise
the test and acitivites carried out during shutdown. tripping
confirmed
O/C and E/F through
testingdistance relay on
and trippiing particuarzone
confirmed, setting
wise
boundry determination,timing and zone wise
the test and acitivites carried out during shutdown. tripping
confirmed
O/C and E/F through
testingdistance relay on
and trippiing particuarzone
confirmed, setting
wise
boundry determination,timing and zone wise tripping
confirmed through distance relay on particuar setting

Page 3 of 4
AC1-209/251021

UT DOWNS FOR THE MONTH OF 10-2021__in respect of P&I Bannu________

Detail of works carried out by

P&I Staff

Page 4 of 4