You are on page 1of 1

AC1-209/251021

PROGRESS OF PRE-ARRANGED SHUT DOWNS FOR THE MONTH OF 09-2021__in respect of P&I Bannu________
the test and acitivites
Shut Down availing
CM&O Approval Detail of works carried out bycarried out during
Name of Equipment / Date / Time shutdown. 1,C&DF
Sr; # Name of Grid Station the test and acitivites
Transmission Line , IRcarried
TEST.out during
No. Date Date From To Maint; Staff Line Staff coupling P&I Staff
of capacitor
shutdown.2. Integrity test of
bank
the testpanel
earthing for1,C&DF
andsystem, trx 2
acitivites
1 2891-2901 9/29/2021 132KV GSS KARAK P/T1-20/26MVA & KRK81 9/7/2021 08;00 12;00 ,andIRcarried
TEST.
trx 3 and
out its supply
during
3.differential
coupling and
of capacitor
2. Integrity test O/C
of
conection
shutdown.
and
bank E/F
panel i.efor
AC
testing ,DC
1,C&DF
and
trx 2
the test
earthing and acitivites
system,
2 2891-2901 9/29/2021 132KV GSS TAJAZAI P/T3-20/26MVA ,TJZ83 9/9/2021 08;00 12;00 and and
,tripping
IRcarried
TEST. PT
trx 3through
and supply.2ndry
3.differential out its
and supply
duringO/C
injetion 2. Integrity
conection
shutdown. test set.
i.e test
AC of 4
,DC
1,C&DF
and
the E/F
test
earthing testing
and and
acitivites
system,
P/T4-31.5/40MVA & transformer
and
,tripping
IR TEST. PT auxillay
supply.
3 3101-12 10/5/2021 132KV GSS BANNU
BNU84
9/10/2021 08;00 12;00 carriedthrough
3.differential
protection out 2ndry
during
and
alam O/C
and
injetion 2. Integrity
test set.test of
shutdown.
and
tripping E/F
earthing testing
through
system, and 4
1,C&DF
main
P/T5-31.5/40MVA & transformer
,tripping
IR TEST. through auxillay
2ndry
4 3101-12 10/5/2021 132KV GSS BANNU 9/12/2021 08;00 12;00 bucholz,
3.differential tapalam
changer
and O/C
BNU85 protection
injetion 2. Integrity
test set.testand
of 4
bucholz.
and
tripping
the E/F
test OTI,
through
and WTI
testing and
and
main
acitivites
PRV. earthing
transformer system,
auxillay 5
5 3101-12 10/5/2021 132KV GSS S.NAURAG P/T1 -20/26MVA & SRN81 9/13/2021 09;00 13;00 tripping
carriedthrough
bucholz,
3.differential tap
out 2ndry
changer
during
and O/C
protection
injetion trxtest
dc alam
fauilur
set. and 4
bucholz.
shutdown.
the
and
tripping
the test
E/F OTI,
and WTI
testing
test through 1,C&DF
and scheme and
acitivites
and
main
acitivites
supervison
transformer
,PRV.
IR TEST. auxillay 5
6 3101-12 10/5/2021 132KV GSS GOMAL UNI P/T1-20/26MVA & GMU81 9/14/2021 08;00 12;00 carried
tripping
bucholz, out
carriedthrough
tap
out during
2ndry
changer
during
tripping.6
protection
2.trx dc
Integrity concern
alam
fauilur
testand
of 4
shutdown.
injetion
bucholz.
shutdown. testOTI, O/C
set.
WTI and
1,C&DFand
incomming
tripping
the test
supervison
earthing through
and and all
main
acitivites
scheme
system,
,PRV.
IR E/F
transformer
TEST. testing and
auxillay 5
7 3101-12 10/5/2021 132KV GSS GOMAL UNI P/T2-20/26MVA & GMU82 9/14/2021 12;00 16;00 11kv
bucholz, O/G
carried tap
tripping.6
3.differential tripping
out changer
during
concern
and and
O/C
trippiing
protection
2.trx dc confirmed,
Integrity alam
fauilur
testand
of
closing.
bucholz.
shutdown.
incomming
and E/F OTI, WTI
1,C&DF
andmain
testing and
all
and
zone
tripping
supervisonwise
earthing boundry
throughscheme
system,
8 3101-12 10/5/2021 132KV GSS GOMAL UNI GMU2 AND GMU1 9/14/2021 10;00 12;00 ,PRV.
IR
11kv
trippingTEST.
O/G tripping
through
determination,timing
bucholz, tap changerand5
2ndry
tripping.6
3.differential
2. trx dc
Integrity concern
and
fauilur
test O/C
of 4
closing.
injetion
and
bucholz.
and zonetest
E/FOTI,
incomming set.
wise tripping
WTI
and
testing and
all
and
supervison
earthing
transformer
PRV. confirmed scheme
system,
auxillay
through
9 3101-12 10/5/2021 132KV GSS KARAK P/T2-20/26MVA & KRK82 9/16/2021 08;00 12;00 11kv
tripping O/G
tripping.6
3.differential tripping
throughconcern and5
and2ndry
O/C
protection
distance
closing.
injetion trxtest alam
relay
dc fauilur
set. and
on
the
tripping
particuar test
incomming
and and
E/Fthrough
supervison testing
setting
scheme all 4
acitivites
andmain
and
transformer
11kv carried
tripping O/G out auxillay
during
tripping
through and
2ndry
10 3101-12 10/5/2021 132KV GSS PROVA P/T1-10/13MVA & PRV81 9/21/2021 08;00 12;00 bucholz,
tripping.6 tapalam
changer
concern
protection
shutdown.
closing.
injetion test O/C
set. and
and
bucholz.
the test
incomming
tripping OTI,
and
through WTI and4
acitivites
and all
main
E/F
transformer
PRV. testing and
auxillay
11 3101-12 10/5/2021 132KV GSS PROVA P/T3-20/26MVA & PRV83 9/21/2021 12;00 16;00 the
11kv
bucholz,test
O/Gand
carried out
tap during
tripping
changerand5
acitivites
trippiing
protection
trx dc
carried
shutdown. confirmed,
alam
fauilur
out and
during
O/C and
closing.
bucholz. OTI, WTI and
zone
tripping
supervison
shutdown.E/F wise
testing boundry
throughschememain
1,C&DF
and
12 3101-12 10/5/2021 132KV GSS PROVA BREAKER PRV1 9/21/2021 10;00 12;00 PRV.
determination,timing 5
, bucholz,
IR tripping.6
TEST.
trippiing
trx dc
tap changer
concern
confirmed,
fauilur
and
bucholz. zone
incomming wise
OTI,
2. Integrity
zone and
wise boundry tripping
WTI and
test all
of
supervison
PRV. confirmed scheme
through
13 3101-12 10/5/2021 132KV GSS PROVA BREAKER PRV2 9/21/2021 13;00 15;00 11kv
earthing O/Gsystem,
tripping
determination,timing
tripping.6 concern and5
distance
closing. trx dcwise
3 incomming
and transformer
zone relay
fauilur on
auxillay
tripping
particuar
supervison and
setting
scheme all
132KV GSS KHURAM protection
11kv confirmed
O/G indication
through
tripping and
14 3101-12 10/5/2021 P/T2-10/13MVA FUSE 9/29/2021 08;00 12;00 tripping.6 concern
GHRI confirmed
distance relay
closing. throughon
incomming
main bucholz,
particuar and
setting tap all
11kv O/Gbucholz.
changer tripping OTI,
and
closing.
WTI and PRV.
.4 concern
incomming and all
11kv O/G tripping and
closing.

Page 1 of 1

You might also like