Customer : IWS Triveni Turbine Limited.

A/C : M/S LARSEN AND TOUBRO LIMITED, C-4253


SBEE Cables (NDIA) Limited
GENERAL OUALITY ASSURANCE PLAN Doc. No. : QAP/I0/03
As per IS 694, 1554 - Part I, 7098 - Part I & 14255 Rev. No. : 00
FIANL INSPECTION Date i 02.05.2013
No.:lof2
sl Component & Class Type of Reference / Format of Testing
Description of Test Sampling Plan Acceptance Agency Remarks
No. Operation ## Check norns Records P
., FINAL INSEPCTION Test Reports will be
a) Routire Test Conductor Resistance (C R) & c Electrical
1000/0
rs r30
8 lntemal Test
2 I
fumished at the
High Voltagc (H V) Tcst @room temp C Electrical Mfe. Spec./ADS Reports time of Inspection
b) Acceptrtrce Test Cu Conductor - Elongation * c Physical As per Sampling Mfg. Spec. / Inspection Test To be witnesed by
AI Conductor - Wrapping * C Physical
Customer Inspection AI Conductor - Tensile Strength * C Physical
Conductor Resistance (C R) C Electrical
plan specified in
H V Test @ room temperature c Elect.ical
or No. of Conductors, Dimensions, c Physical
Third Party Inspection Area, Laying up, Construction c Visual
& Armouring c Visual the above Approved data 2 I the Inspection
Thickness of Insulation, lnner sheath, C Phvsical
Outer Sheath and Overall Diameter C Physical
Before Ageing of Insulation and Sheath C Physical
specifications /
Tensile Sbength Test c Phvsical
Elongation at Break Test C Physical
Volume Resistivity Test, c Electrical
Flammability Test C Physical Standards sheet (ADS) Reports person

Note I : * Before stranding Note 2 P - Agency which performs the test I - Purchaser - Third Party lnspection Agency
Class ## W - Witness of test 2 - SBEE Cables (INIDA) Limited
A: Minor, B: Major, C: Critical V- Verification of records

,)
.A EBEE
"+ (lNDlAf LlIlllD

or.lltv Conuol [dtJ,


SBEE Cables (INDIA) Limited
GENERAL OUALITY ASSURANCE PLAN Doc. No. : QAP/I0/03
AsperIS 694,1554 - Part 1,7098 -Partl & 14255 Rev. No. : 00
Date :02.05.2013
P No.:2of2
sl. Component & Class Type of Reference / Format of Testing
Description of Test Sampling Plan Acceptance Agency Remarks
No Operation ## Check NOITNS Records P
3 FTNAL INSEPCTTON FR Cable = Orygen lndex Test (OIT), C Physical As per Sampling Mfg. Spec. / Inspection Test To be witnesed by
b) Acceptance Test Temperaturc Index Test & c Physical
Customer Inspection Flame Retardance test on single cable c Phvsical plan specified in
FR LSH cable = OIT, c Physical
the above Approved data 2 I the Inspection
Temperature Index Test, C Physical
or Flame Retardance test on single cable C Physical specifications /
Third Party Inspection Smoke densitv and C Physical
Halogen acid gas evolution test. C Chemical Standards sheet (ADS) Reports person
FINAL INSEPCTION After Ageing oflnsulation and Sheath B Physical As per Sampling Intemal Test To be done as per
c) Othcr Tests Tensile Strength Test and B Physical
Elongation at Break Test B Physical plan specified in
H V (Water Immersion ) Test (PVC) C Electrical
Insulation and Sheath - Shrinkage Test C Physical the aboYe Mfg. Spec. 2 I
PVC Insulation and PVC Sheath -
Hot Deformation Test C Physical specifications /
Heat Shock Test B Physical
Loss of Mass Test B Thermal Standards Reports Sampling

Class ,# Note 2 : P - Agency which performs the test I - Purchaser - Third Party Inspection Agency
A: Minor, B: Major, C: Critical W - Witness of test 2 - SBEE Cables (NIDA) Limited
V- Verification of records

.a BSEE