You are on page 1of 3

The Construction Manager: The Contractor:

King Abdul-Aziz International Airport


Development Project (Phase I) Jeddah, KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.

A Load Center C / SEC Cable Tunnel / C130 / Basemen LPDB-C130-ES-15-B2-05


C13O t2
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

METER TEST KAIA-INMA- 1 1 0


LV LPDB 003-LVDB
AMMETER,VOLTMETER TESTING NOT APPLICABLE FOR THIS PANEL
Ammeter Test :

1.1. Ammeter General Data:

1.1 Technical data

Manufacturer: Designation:

Range: Accuracy Class:

Type Reference: Rated Ratio(CT)

1.2 Visual Inspection


Sr. No. Description Checks
1 Inspect for physical damage/ defects
2 Checking of wires for any damage and that they are connected properly
3 Inspect for physical connection as per approved drawing
4 Inspect isolating terminals and earthing connections
5 Inspect for correct tightness of the connection
6 Checking ferrules as per drawing

1.3 Electrical Test


1.3.1 Functional test
 Functional check of selector switch - N/A

1.4.1 Secondary Injection


Reviewed By Reviewed By Approved By
Test Information
(S/C) (Cx Team) (CM)
Readings by: Name / Ahmed Joudah / BSC Mustafa
Name:
Company / Signature Qanbar
Dates: Started/
Completed 11/01/2018 Signature:

Attached at the end of this Full Test


Instruments Used: Date:
Pack
The Construction Manager: The Contractor:
King Abdul-Aziz International Airport
Development Project (Phase I) Jeddah, KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.

A Load Center C / SEC Cable Tunnel / C130 / Basemen LPDB-C130-ES-15-B2-05


C13O t2
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

METER TEST KAIA-INMA- 2 1 0


LV LPDB 003-LVDB
Meter FS = 1200

Test Values
Injected Expected Actual % Error Test
S/N Test Results
Secondary Meter Meter Act. - Exp.
Percentage (/)
Current Display Display Exp.
(%)
(A) (A) (A) (%)
1
2
3
4

comments:

VOLTMETER:

1. Technical data
Manufacturer: Designation:
Range: Accuracy Class:
Sr.No

2. Mechanical Checks and Visual Inspection


Sr. No. Description Checks
1 Inspect for physical damage/ defects
2 Checking of wires for any damage and that they are connected properly
3 Inspect for physical connection as per approved drawing
4 Inspect isolating terminals and earthing connections
5 Inspect for correct tightness of the connection
6 Checking ferrules as per drawing

3. Electrical Test

Reviewed By Reviewed By Approved By


Test Information
(S/C) (Cx Team) (CM)
Readings by: Name / Ahmed Joudah / BSC Mustafa
Name:
Company / Signature Qanbar
Dates: Started/
Completed 11/01/2018 Signature:

Attached at the end of this Full Test


Instruments Used: Date:
Pack
The Construction Manager: The Contractor:
King Abdul-Aziz International Airport
Development Project (Phase I) Jeddah, KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.

A Load Center C / SEC Cable Tunnel / C130 / Basemen LPDB-C130-ES-15-B2-05


C13O t2
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

METER TEST KAIA-INMA- 3 1 0


LV LPDB 003-LVDB
3.1 Functional test
 Functional check of selector switch
3.2 Secondary Injection
Meter FS= 500

Test Values
Injected Expected Actual % Error Test
S/N Test Results
Secondary Meter Meter Act. - Exp.
Percentage (/)
Voltage Display Display Exp.
(%)
(V) (V) (V) (%)
1
2
3
4

comments:

Reviewed By Reviewed By Approved By


Test Information
(S/C) (Cx Team) (CM)
Readings by: Name / Ahmed Joudah / BSC Mustafa
Name:
Company / Signature Qanbar
Dates: Started/
Completed 11/01/2018 Signature:

Attached at the end of this Full Test


Instruments Used: Date:
Pack