GM
Bay Sgred
07/07/2021 6:18 PM
SUSHIL KUMAR YADAVA
(CE/RSW/ENGG/HQ/NCR)
Please process for sending to RIy Board so that these may be examined by AM
Committee w.r.t their essentiality.
08/07/2021 11:02 AM
SANJAY KUMAR SRIVASTAVA
(CE/P&D/ENGG/HQ/NCR)
12/07/2021 10:29 AM
P. K. PALIWAL
(DY.CE/P&D/ENGG/HQ/NCR)
CE/RSW has processed 10 works for sanction under main "Umbrella Works
2019-20" (Note No.#163) under Plan Head-30 (Road Safety-ROB/RUB works)
for approval of GM as
follow
284492 NA
2 MKP-NYN: Elimination of 04 nos. manned Level
crossing No 405, 411, 412 8& 414 by providing RUB
in NYN-MKP section.
MKP-NYN section
5 on
lieu of 406618 NA
6 Idgah Bayana
Construction of subway in
26, 27, 31, 69
14, 17, 19, 23, 25,
level crossing No 100000
having TVU upto (09Nos.)
453756 NA
Construction of subway in lieu of level
7 Idgah-Bandikui-
91, 93, 94, 95, 96,
crossings LC no. 49, 78, 79, 88, Nos
having TVU up to 100000 (10
98
Fle N
NCR-HGQ0ENGG(BRID)/19/2020-0/o CBE/HQ/NCR (Computer No. 4151)
Total 2487813|
L
Justification of above proposed works are downloaded from IRPSM and
placed at P-91 to P-100 respectively. All proposals are related with safety of
train operatiot and road user hence essential & inescapable.
As per item No. (ii) of Railway Board's letter No. 2020/F(X)II/PN/3 dated
04.05.2021 (P-101), "Umbrella Works of 2019-20 and 2020-21: For unutilised
portion of Umbrella works under the Plan Heads 17, 33, 36, 41, 42, 51, 53 and
64, the proposals will be examined by the Additional Members committee w.r.to
the essentiality of the proposed works before obtaining sanction of the
competent authority as per delegation of powers. The works under other Plan
Head may be prOcessed in the usual manner".
Dgaly Signed
12/07/2021 12:58 PM
P.K. PALIWAL
(DY.CE/P&D/ENGG/HQ/NCR)
GM may kindly approve the proposals costing Rs.248.80 Cr. so that these may
be forwarded to Railway Board through IRPSM for approval after concurrence or
HQ finance.
haly Sgned
12/07/2021 1:28 PM
SANJAY KUMAR SRIVASTAVA
(CE/P&D/ENGG/HQ/NCR)
The proposal for itemised works for ROB and RUB in Non GQ/GD routes under
sanctioned Umbrella work of 2019-20 in PH 30( PB Item No 240/2021-22) has
been put up vide Note#163 above.
Proposals for ROB at LC No 22C in Mathura-Alwar section (item no 4)
RUB
represented by local leaders during Annual GM Inspection as well as for the
for LC No 428 at Iradatganj for providing Long Loop in MKP-NYN section as
decided during meeting by GM in June'21 have been incorporated in above
Umbrella work.
Put up for kind approval of Note#163 above so as to send the proposal to Rly
Board for sanction after obtaining concurrence from PFA/NCR.
ialy Signod
12/07/2021 5:10 PM
SANJAY KUMAR MISHRA
(PCE/HQ/NCR)
ghaly Signed
13/07/2021 5:05 PM
VINAY KUMAR TRIPATHI
(GM/NCR)
13/07/2021 5:56 PM
SANJAY KUMAR MISHRA
(PCE/HQ/NCR)