YOur proposal for Permission for PROVIDING UG 1200mm@ Ms CASING PIPE (16 MM THICK) FOR
CROSSING OF 600mm MS WATER CARRIER PIPE UNDER THE TRACK AT KM: O0/8-10
BETWEEN MIYAGAM-BHARTHALI STATIONS ON MYG-CRND SECTION FOR DEE, GWSSs8,
KARJAN, GUJARAT is here by approved and permission for execution of work at your end subject to
following conditions i.e.
Work should be executed as per approved Plan No. DRM/21785/27-WATER & PCE No. e-
30594-DRM/2-D (Copy enclosed) under the overall supervision of Railway officiais.
Payment of required Way leave facility charges and estimated charges of Rs. 1420638.00
(including GST) deposited through online payment portal of MERS on RBCS web site vide
WLO000000010808 dated 16.09.22, invoice no. WL00000000012064 dated
invoice no.
01.11.22 & invoice no. WLO0000000014500 dated 20.12.22.
3. As the section is closed, PCE sanction is not
4
required.
During executing of work, if any damage
to Railway property or Railway revenue loss if noticed
the damage/loss charges
for the same will be recovered from
5
party.
Way leave agreement is executed and available on RBCS portal with the above
6All safety measures should be taken while ID
Work should be done under
executing the work by Party.
supervision of Railway Supervisors i.e. Sr. Section Engineer (P
WAY) MYG. Prior intimation to Railway supervisors shall be
After completion of work, to be advised to given before commence of wci
ADEN/N/BH & this office and to be updated in the
RBCS portal
6-3.3
Sr. DivissonBisOiSeEKSAIUBF ith)
Western Ralway, NARANAKAaton
C ADEN/N/BH, SSE/Pway/MYG:
DFM/BRC, Sr. DSTE/BRC,
Cl- Sr.
For information and execution of
Sr. DOM/BRC: for kind inf. Pl
work Vadodara-0i
INDIA NON JUDICIAL
Government of Gujarat
Cortificateo of Stamp Duty
Description AGREEMENT
Consideration Price (Rs.) 300
(Three Hundrod only)
JAN
HA
0024981495
2u22 2 6 .
MEMORANDUM OF AGREEMENT
MEMORANDUM OF AGREEMENT FOR
RIGHT FOR CROSSING GRANTING WAY LEAVE FACILTY
RAILWAY LAND
(on stamp paper of charges as
applicable in terms of
Stamp Act)
'Railway Administration' which expression shall, unless the context does not so
admit
EXecH ve Erineer
includes his successors
and assigns) of the
one part and PH Dn.,husSB,
EEr hwss, kAAJAN
R/o_ (hereinafter called the 'Grantee' or
which expression shall, unless the context does not so admit, includes his successors and
assigns) of the other part.
Executiv Engineer
Public Health Work
Dn.
1. That the Grantee at his, own risks and expenses, shall provide/lay
1b 1w mm M: a r Pipe (l6mmJhick) fo Cutir) bo Mmt
Swater_CUUC_ PPe
MIYA bA m- BHAR THAL) S n
name of work] at Km o 8 - 1 0 Section m nyh- CRAD etho
across/ through railway land
Rn2'P2
for a length of _0840meters vide
granted for a period of- -years from the date of signing this agreement to the
Grantee on the terms and conditions contained herein which have also been
distinctly and clearly understood by the Grantee before entering into this
agreement.
3. That subject to otherwise provided in this agreement for way leave facility, any
4. That no work shall commence or proceed without previous sanction in writing and
supervision of the concerned railway ofticer not below the rank of Divisional
Engineer or any officer so deputed by him. The Grantee shall be bound all the
times, at his own costs /expenses, to observe and carry out all rules and regulations
Executive Engineer
Public Health Work Dn.
Guj. W.S. & S. Board
VADODARA.
from time to
thereafter be prescribed
force which may
etc. which are already in or
related thereto.
manuals
that all the relevant codes,
6. That Grantee distinctly and clearly understood
without any notice to Grantee, and have full control over the use and disposal of
without, in any way, affecting the railway's right, title, interest, possession,
CAAL
Executive Engineer
Work Dn.
Public Health
& S. Board
W.S.
Guj.
VADODARA.
of the land, any to enter upon etc. The Grantee has clearly
control. use right
understood that all air/space rights shall remain with the Grantor.
of work and Grantee shall pay all codal charges as per railway rules including the
payable amount for full way leave term on present value basis with discounting of
future cash flows at rate of 7%(seven percent) per annum, as applicable, for way
leave facility for crossing Railway land before the permission is granted by the
payment shall be deposited by the party. Also, the annual charges shall be
deposited in advance on or before 10th April of every year (next working day in
delay, an interest @12% per annum shall be payable on the outstanding dues for
10.On expiry of way leave agreement, further renewal can be done based on mutual
agreement between Grantor and Grantee. Market value of the railway land
xecutive Engineer
Work Dn.
Puplic Heaith
W.S. & S. Board
Guj.
VADODARA.
the way leave
12. That the Grantee shall not erect/raise any additional construction, other than
soon as noticed at the costs of the Grantee and the permission for way leave shall
13. That, if any time, the way leave facilities for crossing Railway land becomes, in
operation or Railway property, the Grantee shall, at once take steps to remedy
which the Railway Administration shall have the rights to take all
necessary remedial steps at the costs of the Grantee, necessary for the protection
of the Railway's interests, without being held responsible for any loss, suffered by
the Grantee, due to such action of the Railways Administration. In case of any loss
to the Railway due to such action, in case of menace, the Grantee shall be held
liable to compensate the Railway in all cases, what so ever it may be.
CA
Executive Engineer
Public Health Work Dn.
Guj. W.S. & S. Board
VADODARA.
14.That the Railway shall not in any case be responsible for any damage/loss to the
15. That the Grantee shall keep, all the times, Railway Administration indemnified
against and reimburse the Railway administration for all claims, suites, demands,
of any injury to any person or loss of life or to Railway property resulting directly
or indirectly or incidentally from any act or omission on the part of the Grantee or
his employees or servants or any other person, agent etc. other than Railway
servants on any account related to said permission, on duty in carrying out the
16. That any notice hereunder shall be deemed duly served on the Grantee if delivered
17. In case shifting of alignment of way leave facility is required on party/ Railway
account, the entire cost of shifting of way leave facility shall be borme by the
Grantee.
18. In the event of the way leave facility being discontinued with by the Grantee or
alternative arrangement for access, etc. In such a case, any installations like
Executive Fnnineer
Public Health vvork Dn.
Guj. W.S. & S. Board
VADODARA.
liable to be removed/ shifted by
underground pipelines, etc. put up by the party are
19. Grantee will be responsible for nmaintenance of assets crossing Railway land
applicable.
20. Grantee shall not transfer or sublet the way leave facility/ right granted by the
terms & condition of contract with Railways will supersede any conflicting
Railway Boundary but not beyond 1500 m. The inter-se distance between two
shut off valves should not exceed 2000m. Vent pipe should be provided on
either side beyond 500m from Railway boundary but not beyond 750m.
Or
Executive Engineer
Public Health 'nrk Dn.
Guj. W.S. & S. Board
VADODARA.
Or
MPLADS, PMGSY, MMGSY etc, way leave charges have been waived off
dated 16.07.2012.
23. Dispute Resolution: In case of any dispute or difference arising out in any way
railway division shall examine all the issues and submit recommendations to the
DRM whose decision shall be final and binding on all the parties.
24. Termination of Agreement: In the event of any serious irregularity, grave breach
of the terms & conditions of the agreement, any default, violation of the Railway
Act, 1989, commission of any unlawful act which is not in line with good industry
practices, railway administration may terminate the agreement with the Grantee
without being held responsible to pay any compensation and/or reimburse any
amount to the Grantee and not liable to provide any alternative arrangement for
access, etc.. On receipt of such notice, the Grantee shall immediately remove its
structures at its own cost and expenses and also made good for any damage
CAAL
Executive Engineer
b l i c Health Work Dn.
Guj. W.S. & S. voard
VADODARA.
whereot, tne
16 03:013In witness
2 . That the agreement shall be effective w.e.f.
offices
respective hands and seals of their
parties to this agreement have set their
each.
to these presents on the date, month & year mentioned against
Name:
Designation: 323
Address: n d e f e t kaushiK
(Authorized Signatory) SR Di4ij0sglcadnner (South)
Western Raity, Pratpnegar,
For and on behalf of
Vadodaru-04
(Grantee)
ExecutiveEngineer
SIGNED, SEALED AND DELIVERED by Public Health Work Dn.
Guj. W.S. & S. Board
Name/Designation/Address: VADODARA.
(Authorized Signatory) IR1SH A A JOl4
EEnImeer, RH w Dn,
bwSSB, V1dvdn aa
1. Signature T e h
Name Jlks.mmmsuA S/o Sh. Mutrzbha
Designation Pm site Cmyine Fox OWSS 13 kRJAN
Office Address B c o d e s
Pa dey
2. Signature Blpin Hnman
Name 1P KvmAR PANpey S/o Sh. IJA y KvmAR_PAADEY
Designation /uO|LML/pATN
Address DRM 7 e _PRTN
***
℄ DEPOSIT WORK
CATEGORY A3
6.50
TANUJ GUPTA Digitally signed by TANUJ GUPTA
Date: 2023.03.02 13:04:44 +05'30'
0/10 0/8
TO CHORANDA TO MIYAGAM
℄
1.50
KEY PLAN
NOT TO SCALE CROSS SECTION ROUTE MARKER
(NOT TO SCALE) (NOT TO SCALE)
BORE LOG DETAILS
21824
DRM NO: 27-WATER PCE NO: e-30594-DRM/2-D