Time
From 18-April-2020 to 23-April-2020
Span:
4 Progress Outline
4.1 Engineering
4.1.1 Drawing Submittals Status
4 4 355 355
7 Quality Control
7.1 Engineering
7.1.1 Design Shop Drawing Submittals & Approval Log
Submittal Return
S/N Drawing Ref: No. Drawing Title Revision Status Remarks