INDEX
SL.NO. DESCRIPTION DRAWING NO. REVISION PAGE NO.
COVER TILE, WARNING TAPE FOR MCC NETWORK AND HDD DETAILS AB-TYP-S-208 Z3 20
16
(4 / 24)
Typical Drawing Ref.
Rev. Drawing No. Date
Z3 AB-TYP-C-101-01 20-Dec-22
1. Civil Typical Drawing shall be read with conjunction of the IFC Drawings. 1. Meter Cabinet (MC), Power cabinet (PC) Location, Orientation, Level etc. must comply with ADDC/AADC
2. Civil Typical Drawing is for information and reference. It is the obligation of the Consultant/ Contractor to regulations
provide any necessary design works/calculations to complete the works as per the MCC requirements.
2. Maximum connected load for MCC-PC to be up to 10KVA.
3. MCC has the right to apply any changes on the civil typical drawing as per the nature of each project and as
per the site conditions. 3. The Maximum service cable length from LV/ FP/ ST to MCC-PC should be 10m via MCC-MC.
4. All areas covered with grass have irrigation water Distribution pipes below Ground Level, which will have 4. The length of cable from MCC-PC to the last pole must not exceed 1500m.
Maintained in place during Excavation. 5. Maximum pole allocated for per PC must be less than 15 Elements(Pole/Gantry) and must comply #4
5. The Trench alignment needs adjusted locally for various concrete structures like valve chambers, electrical
and telephone junction boxes etc. 6. Earth pit to be provided for each asset such as Pole, Gantry and cabinet.
6. Before any excavation contractor must submit a method statement/drawing of the proposed work and obtain 7. Earth pit resistance must be less than 5Ω.
approval from the relevant authorities/departments. 8. All electrical services must satisfy AADC/ADDC/local authority specification and requirements.
7. After excavation the contractor is to receive a clearance certificate from the relevant department. median
9. Available Spare terminal in the selected ADDC/AADC power Source to be identified and required to be
shown with grass/sand are indicative only. there some area having other hard finishes on top.
allocated for MCC
8. Height of medians shown in section drawings are indicative only. actual median height should be taken into
consideration while studying drawings and preparing any method statement. 10. Selected ADDC/AADC power Source approval from concerned authority need to be submitted during final
9. Pull Boxes to be placed at a maximum interval of 250m. design stage.
10. Angle of Deflection for a Trench should not be more than 45°. drawing Ref. No. (AB-TYP-C-105). 11. Final approval shall be subject to the MCC on Detail Design and IFC Stage submissions
11. Earth Electrode Pits for grounding provided next to all poles, Gantries and Cabinet Foundations.
12. Document to be submitted in 2 sets, MCC required documents and ADDC/AADC submission Documents
12. Trench types shall be mentioned clearly on the layout drawings and legend as per MCC standards and
regulations. All MCC assets should be labeled as per the MCC Standard. It should be Asset
name - project name-zone All MCC
13. Assets should be labeled as per the MCC Standard It should be Asset name - project name-zone
name-site Name-Asset number.
14. Corridor plans and Sections should be provided in the Drawing.
15. Drawings shall be scaled 1:200 on A3 size as per MCC standard. All dimensions shall be in Meters.
16. Trench should be interconnected from the first to the last point.
17. Cross section for each pole and gantry to be provided (Could be provided in IFC stage).
18. Foundation type should be mentioned in every pole/gantry label
19. Pull boxes to be placed at
A- each bend
B- next to each pole, gantry, or cabinet foundation
C- in median as well as both sides for each HDD/Crossing
20. Earth pits to be addressed next to each new pole, gantry, any power cabinet.
21. All MCC standard drawings to be added to the drawing package.
22. Any proposed FE network shall be extended up to the existing MCC network, even if its outside the limit of
work area.
23. Poles, Gantries locations in DD should be placed in the same location provided in the Top level
design ( TLD).
24. The layout drawings (poles, pull boxes and trenches) shall be scaled and clash analysis shall be
conducted to insure that there no conflicts between falcon eye works and other utilities.
25. Any existing road, Interlock areas & proposed road need to be mentioned in different colors with
Legend.
26. Drawing should be neat and clean (labels arrangements should not be overlapped).
27. E- Transmit files shall be submitted in addition.
28. Method of execution shall be mentioned clearly under existing and proposed roads either by open cut with
concrete protection or by Horizontal directional drilling (HDD).
29. Scope of work to be clarified on the layout drawing and legend as: (Proposed/Existing/Relocated) with
different colors.
30. Pull box alignment shall be rearranged with trench direction.
NOTE 1A : CROSSING EXISTING CABLES (POWER / CCTV ETC.) NOTE 8 : CROSSING UAE ARMED FORCES / SIGNAL CORP CABLES:
* INFORM THE AUTHORITY (ADM/ADDC/POLICE/ARMED FORCES/DMT/TRANSCO ETC.) * THE LOCATION OF THE CABLE SHOWN, ARE INDICATIVE ONLY. PLEASE ENSURE ADEQUATE SAFETY.
* DEPLOY MANUAL EXCAVATION AND EXPOSE THE CABLE.
CONTACT UAE ARMED FORCES/SIGNAL CORP ON 02 618 8480 PRIOR TO COMMENCING WORK.
* RETAIN AND SECURE CABLE IN POSITION.
*
* CONTINUE EXCAVATION IF EXISTING CABLES ARE AT HIGHER ELEVATION THAN THE BOTTOM OF THE PROPOSED TRENCH. IN THE PRESENCE OF UAE ARMED FORCES/SIGNAL CORP AUTHORIZED REPRESENTATIVE, CARRY-OUT
* MANUAL EXCAVATION TO IDENTIFY PROTECTIVE INDICATOR (APPROXIMATELY 600MM BELOW EGL) AND
* COMPLETE CABLE LAYING AS PER ADDC/DMT/POLICE/GHQ/TRANSCO SPECIFICATIONS.
CABLE (APPROXIMATELY 1.2M BELOW EGL).
* FILL AND COMPACT UP TO THE BOTTOM OF EXISTING CABLE. * CROSS OVER/BELOW THE PROPOSED POWER/COMMUNICATION CABLE AS PER THE GUIDELINES OF UAE ARMED FORCES/SIGNAL CORP.
* PLACE THE EXISTING CABLE IN ITS ORIGINAL POSITION.
FILL UP WITH SELECTED EARTH, AND COMPACT IN LAYERS UP TO THE PROTECTIVE INDICATOR LEVEL.
* COMPLETE FILLING AND REINSTATE THE GROUND TO ITS ORIGINAL CONDITION. * PLACE THE PROTECTIVE INDICATOR IN PLACE.
* INFORM THE RELEVANT AUTHORITY (SERVICE PROVIDER). * RESTORE/RE-INSTATE GROUND AS PER ORIGINAL.
* DO A TRIAL PIT (MANUAL EXCAVATION) TO LOCATE EXISTING CABLE (RECOMMENDED).
* EXPOSE THE CABLE DEPLOYING MANUAL EXCAVATION.
NOTE 9 : POLE/GANTRY FOUNDATION IN THE VICINITY OF SEWER/STORM WATER PIPE LINE
* PROPERLY RETAIN AND SECURE EXISTING CABLE IN POSITION. * LOCATE POLE/GANTRY FOUNDATION.
* CONTINUE EXCAVATION IF EXISTING CABLE IS AT HIGHER ELEVATION THAN THE BOTTOM OF THE PROPOSED TRENCH. * EXCAVATE MANUALLY A PIT UP TO THE BOTTOM OF SEWER/STORM WATER PIPE LINE.
* COMPLETE CABLE LAYING.
* PREPARE PLAN & CROSS SECTION OF POLE/GANTRY FOUNDATION SHOWING SEWER/STORM WATER PIPE LINE.
* FILL AND COMPACT UP TO THE BOTTOM OF EXISTING CABLE.
* PLACE THE EXISTING CABLE IN IT'S ORIGINAL POSITION. * CONSULT WITH ENGINEER AND FINALISE LOCATION OF POLE/GANTRY FOUNDATION.
* NOTIFY THE APPOINTED OFFICER OF RELEVANT AUTHORITY FOR INSPECTION BEFORE BACKFILLING. * PREPARE METHOD STATEMENT AND CONTACT CONCERNED DEPARTMENT (PRAB/ADSSC ETC.) AND GET APPROVAL OF PROPOSED METHOD STATEMENT.
* COMPLETE FILLING AND REINSTATE THE GROUND TO THE ORIGINAL CONDITION.
* EXCAVATE MANUALLY AND MAKE ROOM FOR PLACEMENT OF CASING FOR POLE/GANTRY FOUNDATION.
NOTE 2: REPLACING LV CABLE * SHOW THE PHYSICAL CONDITION TO CONCERNED DEPARTMENT (PRAB/ADSSC ETC.) BEFORE COMMENCEMENT OF
FOUNDATION CONSTRUCTION.
* EXCAVATE THE PROPOSED TRENCH FALLING BETWEEN TWO EXISTING ELECTRICAL POLES, LOCATED ON EITHER SIDE OF THE PROPOSED POLE LOCATION.
* CONSTRUCT FOUNDATION.
* LAY A NEW LV CABLE IN ADDITION TO THE PROPOSED POWER AND FIBRE OPIC CABLE.
* EXTEND THE TRENCH AT RIGHT ANGLE TO ITS ALIGNMENT TO TAKE THE ADDITIONAL POWER CABLE TO THE ELECTRICAL POLES. * FILL UP AND COMPACT SPACE BETWEEN POLE/GANTRY FOUNDATION AND SEWER/STORM WATER PIPE LINE
AS PER THE SPECIFICATION OF THE AUTHORITY (PRAB/ADSSC ETC).
* CONTACT ADDC FOR DE-ENERGISATION.
* DISCONNECT EXISTING CONNECTION AND DISCARD THE EXISTING CABLE. * FILL UP AND COMPACT UP TO ORIGINAL GROUND LEVEL.
* CONNECT POLES WITH THE NEW CABLE AND ENERGISE POWER SUPPLY. * RESTORE/RE-INSTATE GROUND AS PER ORIGINAL.
* RELEASE SITE FOR POLE FOUNDATION CONSTRUCTION.
* REINSTATE THE TRENCH TO ORIGINAL GROUND CONDITION. NOTE 10 : DIVERSION OF SEWER/STORM WATER PIPE LINE
* IDENTIFY EXISTING MANHOLES ON EITHER SIDE OF POLE/GANTRY LOCATION.
NOTE 3 : RELOCATING LV CABLE
CONTACT PRAB/ADSSC ETC. AS RELEVANT.
* EXCAVATE MANUALLY ALONG THE EXISTING CABLE FOR ADEQUATE LENGTH TO FACILATE RELOCATION.
* ARRANGE OPENING OF COVER BY AUTHORITY.
* RELOCATE CABLE.
* EXCAVATE FOR PROPOSED TRENCH AND LAY NEW CABLE. * MEASURE DEPTH OF MANHOLES AND DIAMETER OF INTERCONNECTING PIPE.
* REINSTATE THE SITE TO THE ORIGINAL. * IDENTIFY OTHER UTILITIES IN THE VICINITY OF POLE/GANTRY FOUNDATION.
* PROPOSE METHODOLOGY (METHOD STATEMENT) FOR SHIFTING OF PIPELINE AND GET APPROVAL OF PRAB/ADSSC ETC. AS RELEVANT.
NOTE 4 : TEMPORARY RELOCATION OF LV CABLE * ARRANGE FOR OVER PUMPING AND BLOCKING OF PIPE LINE.
* EXCAVATE MANUALLY ALONG THE EXISTING CABLE FOR ADEQUATE LENGTH TO FACILITATE RELOCATION.
* EXCAVATE AND LAY PARALLEL PIPELINE AND MAKE INTERCONNECTION AS PER APPROVED METHOD STATEMENT.
* RELOCATE AND SECURE CABLE TEMPORARILY.
* GET THE WORK APPROVED BY PRAB/ADSSC ETC. AS RELEVANT BEFORE BACKFILLING.
* CONSTRUCT POLE FOUNDATION.
* PLACE THE CABLE AT ITS ORIGINAL POSITION. * BACKFILL/COMPACT/RE-INSTATE THE SURFACE AS PER ORIGINAL.
* REINSTATE THE TRENCH TO THE ORIGINAL. * EXCAVATE/DISMANTLE AND DISPOSE ABANDONED PIPE SEGMENTS.
* CONSTRUCT POLE/GANTRY FOUNDATION/TRENCH ETC.
NOTE 5: CROSSING SEWER/STORM WATER DRAIN * RE-INSTATE SURFACE AS PER ORIGINAL.
* LOCATE UPSTREAM AND DOWNSTREAM MANHOLES.
* MEASURE DEPTH OF MANHOLES AND SIZE OF PIPE AND ENSURE THAT THERE IS NO CONFLICT OF THE PIPE WITH THE TRENCH.
*
NOTE 11 : POLE / GANTRY FOUNDATION OR HDD CLOSE TO THE TRANSCO WATER PIPELINE
* EXCAVATE MANUALLY FOR THE TRENCH.
* IN THE CASE THAT A MANHOLE COMES ON THE ALIGNMENT, REROUTE THE TRENCH LOCALLY IN CONSULTATION WITH THE ENGINEER. * AS PER TRANSCO GENERAL GUIDELINE, EDGE OF PROPOSED FOUNDATION/HDD SHOULD BE AT LEAST 5.0M AWAY FROM THE CORRIDOR OF
* LAY CABLES AND REINSTATE TO THE ORIGINAL CONDITION. THEIR WATER PIPELINE. VERTICAL SAFETY DISTANCE BETWEEN TRANSCO WATER TRANSMISSION LINE AND PROPOSED UTILITY IS 1.5M.
2. IN CASE IF THE ABOVE CLEARANCES CAN NOT BE ACHIEVED, THE FOLLOWING MEASURES ADOPTED, SUBJECT TO
NCEMA/ADM AGREEMENT (REFER TYPICAL DRAWING AB-TYP-C-107)
· FOR SPEED POSTED 60KPH TO 100KPH, A “SAFETY CONTAINMENT KERB” INSTALLED 15M BEFORE AND 5M AFTER THE POLE OR GANTRY;
· FOR SPEED POSTED 100KPH AND ABOVE, A “HIGH CONTAINMENT KERB” INSTALLED 25M BEFORE AND 10M AFTER THE POLE OR GANTRY
(HIGH CONTAINMENT SAFETY KERBS TYPE GST2A, GST2 AND SAFETY CADET (AASHTO) PLEASE REFER TO ADM HIGH CONTAINMENT KERB DETAILS).
POLE COLUMN
50mm THICK CEMENTITIOUS
NON SHRINK GROUT
(SEE NOTE 2) PIPE SLEEVES FOR CABLE REFER TO
TYPICAL DRAWINGS AB-TYP-S-203 &
AB-TYP-S-204. NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
PILE TOP LEVEL OTHERWISE SPECIFIED.
EXISTING GROUND LEVEL
(SEE NOTE 4)
2. FOR POLES AND GANTRIES FOUNDATION DETAILS REFER TO TYPICAL
DRAWINGS AB-TYP-S-202, AB-TYP-S-203, AB-TYP-S-204 & AB-TYP-S-205.
(SEE TABLE)
PEDESTAL
LENGTH
3. THE CONTRACTOR MAY ADOPT SINGLE STAGE CASTING FOR THE DRILLED
POLE FOUNDATIONS PIER, PROVIDED THAT HIS WORKING METHOD IS ACCEPTABLE TO THE
ENGINEER.
CASTING OF PEDESTAL BY
CIVIL CONTRACTOR POLE PEDESTAL PILE
PILE CUT OFF LEVEL (SEE NOTE 3) 4. THE PILE TOP LEVEL SHALL BE DETERMINED DEPENDING ON THE FOLLOWING
(SEE NOTE 3)
PILING LENGTH CONDITIONS:
TYPE
BOTTOM OF PEDESTAL(SEE NOTE 3) HEIGHT LENGTH DIAMETER a. FOR PAVED AREAS - SAME LEVEL AS THE TOP OF EXISTING PAVEMENT.
DESIGN CONDITION 1 DESIGN CONDITION 2 DESIGN CONDITION 3
ØSOIL > 32° 32° > ØSOIL > 24° 24° > ØSOIL > 12° b. FOR UNPAVED AREAS WITH KERB - 100mm ABOVE THE TOP OF KERB LEVEL.
3 7.70m/8.50m 1000 1200 3300 4000 4700 c. FOR UNPAVED AREAS WITH NO KERB/FLUSH KERB - 250mm ABOVE THE TOP
OF ROAD EDGE LEVEL.
4 17.00m 1200 1200 4900 5600 6500
PILING LENGTH
(SEE TABLE)
6 4.50m/6.00m PAD FOOTING (REFER TYPICAL DRAWING AB-TYP-S-204)
PILE 2022/02
DIAMETER
(SEE TABLE)
GANTRY COLUMN
80mm THICK
PIPE SLEEVES FOR CABLE REFER TO
CEMENTITIOUS NON
TYPICAL DRAWING AB-TYP-S-205.
SHRINK GROUT
(SEE NOTE 2)
GANTRY FOUNDATIONS
GANTRY PEDESTAL PILE
PORTAL 1400
PILING LENGTH
(2 LEGS)
Rev.
02/01
PILE DIAMETER
(SEE TABLE)
FILLED WITH CONCRETE C15 AFTER 300x180 OPENING FOR CABLE ENTRY FILLED
PLACEMENT OF CONDUITS AND FILLED WITH CONCRETE C15 AFTER WITH CONCRETE C15 AFTER PLACEMENT OF POWER CABINET
230x330 OPENING FOR PULLING OF CABLES PLACEMENT OF CONDUITS AND CONDUITS AND PULLING OF CABLES 25x25 CHAMFERING
CABLE ENTRY LPR CABINET ALL ROUND (TYP)
SV CABINET OPENING FOR CABLE ENTRY PULLING OF CABLES 5-T8(TOP &
350mm THICK RCC SLAB 25x25 CHAMFERING ALL 150mm THICK RCC SLAB BOTTOM) BOTH
180x550 OPENING FOR CABLE ENTRY
300
ROUND
350
25x25 CHAMFERING RVC WAYS GROUND LEVEL
T8 @ 300 C/C BOTHWAYS 350mm THICK RCC SLAB 25x25 CHAMFERING ALL ROUND
300
350
GROUND LEVEL
150
GROUND LEVEL
300
WATER PROOFING AS
350
GROUND LEVEL
PER SPECIFICATION
WATER PROOFING AS PER 4-T8 (VERTICAL)
675
4-T8 WITH T8@150 C/C
WITH T8 @ 200 C/C
925
SPECIFICATION 50 WATER PROOFING AS PER DISTRIBUTION
R2 .)
NATURAL SOIL FILLING (M
IN WATER PROOFING AS SPECIFICATION
ELECTRICAL AND PER SPECIFICATION NATURAL SOIL FILLING (REFER TO
(REFER TO TYPICAL DRAWING
900
1150
AB-TYP-C-104 NOTE 14) TYPICAL DRAWING AB-TYP-C-104 NOTE 14)
CONDUIT NATURAL SOIL FILLING ELECTRICAL AND TO TYPICAL DRAWING
200
900
(REFER TO TYPICAL DRAWING 50
TELECOMMUNICATION AB-TYP-C-104 NOTE 14)
200x200 RCC PEDESTAL R2 .) CONDUIT
AB-TYP-C-104 NOTE 14) IN
(M
200x200 RCC PEDESTAL 200x200 RCC PEDESTAL 100mm THICK
PRECAST UNIT FOUNDATION, 150 500 150 BLINDING CONCRETE
COLUMNS AND SLAB PRECAST UNIT FOUNDATION, 800
200
(WEIGHT 2300kg) PRECAST UNIT FOUNDATION, ELECTRICAL AND
COLUMNS AND SLAB
TELECOMMUNICATION
200
(WEIGHT 1200kg) 100mm THICK BLINDING COLUMNS AND SLAB (WEIGHT 1650kg)
200
FOUNDATION
100mm THICK BLINDING CONCRETE CONDUIT A SECTION
200 650 200 CONCRETE
5-T8(TOP & BOTTOM) BOTH FOUNDATION 1000
FOUNDATION - scale 1: 20
200 (TYP.) 100mm THICK BLINDING
c SECTION
WAYS
5-T8(TOP & BOTTOM)
BOTH WAYS
200 600 200 CONCRETE POWER CABINET
- scale 1: 20
F SECTION
5-T8(TOP & BOTTOM) BOTH WAYS NATURAL SOIL FILLING
(REFER TO TYPICAL DRAWING
25x25 CHAMFERING
ALL ROUND (TYP)
303.5
230x330 OPENING
- scale 1: 20 G SECTION AB-TYP-C-104 NOTE 14)
COMMUNICATION DUCT
FOR CABLE ENTRY
-
300
scale 1: 20
350
GROUND LEVEL
167.50
6 X 75mm Ø
200x200 RCC PEDESTAL
390
1000 1000
c DETAILS OF ANCHOR BOLT/FIXING
- ALL REINFORCEMENT T8
177.5 645 177.5 STUD IN CONCRETE (AS PER
CABINET SUPPLIER`S DETAILS)
180 640 180 DETAILS OF ANCHOR BOLT/FIXING STUD IN
CONCRETE (AS PER CABINET SUPPLIER`S DETAILS) 50
R2 .)
ELECTRICAL CONDUIT
675
IN
115
@ 300 C/C (MAXIMUM) (M
925
2 X 50mm Ø
152.5
TOP & BOTTOM
200
1450
1115
F G
- OPENING FOR CABLE ENTRY -
870
640
140 WATER PROOFING AS PER
ALL REINFORCEMENT T8 @ 300 C/C (MAXIMUM)
200
SPECIFICATION
645
950
550
ALL REINFORCEMENT T8 @ 300 C/C TOP & BOTTOM
(MAXIMUM) TOP & BOTTOM & SIDES 100mm THICK BLINDING
CONCRETE
390
400
115
200x200 RCC PEDESTAL
167.50
152.5
200
STUD IN CONCRETE (AS PER PLAN 200x200 RCC PEDESTAL BOTTOM) BOTH WAYS
CABINET SUPPLIER`S DETAILS) TYPE-B 200 600 200 B SECTION
155 740 155 RVC FOUNDATION
180x550 OPENING FOR CABLE ENTRY
- scale 1: 20
1050
PLAN
PLAN -B
TYPE-A TYPE-C
FILLED WITH CONCRETE C15 AFTER
SVC FOUNDATION LPRC FOUNDATION COMMUNICATION DUCT
PLACEMENT OF CONDUITS AND
6 X 75mm Ø 800
PULLING OF CABLES
ELECTRICAL DUCT 150 500 150 300x180 OPENING
180x550 OPENING FOR CABLE ENTRY 5-T8(TOP & 2 X 50mm Ø FOR CABLE ENTRY
UPS CABINET
OPENING FOR CABLE ENTRY BOTTOM) BOTH
350mm THICK RCC SLAB WAYS NATURAL SOIL FILLING (REFER TO TYPICAL
150mm THICK RCC SLAB 25x25 CHAMFERING ALL ROUND FINISHED LEVEL TO MATCH
d*<1m 486
400
KERB TOP LEVEL DRAWING AB-TYP-C-104 NOTE 14)
4-T8 (VERTICAL) WITH T8 @
UPS CABINET
25x25 CHAMFERING (TYP) A
200 C/C
- DETAILS OF ANCHOR
300
BOLT/FIXING STUD IN
350
CABINET FOUNDATION
T8 @ 300 C/C BOTHWAYS GROUND LEVEL EXISTING.
GROUND LEVEL EXISTING ROAD CONCRETE (AS PER
150
G.L.
CABINET SUPPLIER`S
PULL BOX
DETAILS)
WATER PROOFING AS WATER PROOFING AS PER PLAN EARTH CABLE 25mmØ
OR
PER SPECIFICATION SPECIFICATION
NATURAL SOIL FILLING NATURAL SOIL FILLING
TYPE-D
900
EXISTING. G.L.
CABINET FOUNDATION
AND SLAB CONDUIT 100mm THICK BLINDING
200 (TYP.) EXISTING ROAD 3. GRADE OF CONCRETE-C40, COVER-40mm.
(WEIGHT 850kg) CONCRETE
100mm THICK 200 600 200
FOUNDATION
PULL BOX
4. FOR EXTERNAL PROTECTION NOTES REFER TO
750 BLINDING CONCRETE 5-T8(TOP & BOTTOM) BOTH TYPICAL DRAWING AB-TYP-C-104.
OR
4-T8(TOP & BOTTOM) WAYS
BOTH WAYS E SECTION 5. REFER TABLE BELOW FOR SCHEDULE OF CONDUIT
FOR CABINET FOUNDATION.
D SECTION - Scale 1 : 20
- scale 1: 20 1000 6. FOR PULL BOX DETAILS REFER TO TYPICAL
DRAWING AB-TYP-C-104.
180 640 180 DETAILS OF ANCHOR BOLT/FIXING STUD IN
CONCRETE (AS PER CABINET SUPPLIER`S DETAILS) 7. TOP LEVEL FOR PULL BOXES FLUSHED WITH THE
d>5m
750 FILLING AND THE TOP LEVELS FOR CABINET
152.5
300
CABINET FOUNDATION
-
645
950
550
100 CABINET
ALL REINFORCEMENT T8 @ 300 C/C CABINETS - CONDUITS SCHEDULE
PULL BOX
DETAILS OF ANCHOR BOLT/FIXING (MAXIMUM) TOP & BOTTOM GROUND 25Ø
154
OR
STUD IN CONCRETE (AS PER CABINET SL FOUNDATION 75Ø CONDUIT 50Ø CONDUIT
CONDUIT
152.5
200
SUPPLIER`S DETAILS) 200x200 RCC PEDESTAL NATURAL SOIL FILLING (REFER TO TYPICAL
DRAWING AB-TYP-C-104 NOTE 14) 1 RV CABINET 3 3 1
200x200 RCC PEDESTAL
200 600 200 2 SV CABINET 9 0 1
200 125100125 200 ALL REINFORCEMENT T8 @ 300 C/C
153 153 (MAXIMUM) TOP & BOTTOM & SIDES 180x550 OPENING FOR CABLE ENTRY 3 LPR CABINET 9 0 1
444
95
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
100
EXISTING GROUND LEVEL
B - LIFTING SOCKET(1.2 TON ARE IN METERS UNLESS OTHERWISE SPECIFIED.
LIFTING SOCKET(1.2 TON ROAD SURFACE/INTERLOCK PAVING
220 140
CAPACITY PER SOCKET) HEAD FRAME
CAPACITY PER SOCKET) SEE DETAIL-Z (4 Nos.) 2. DO NOT SCALE FROM THE DRAWING.
(4 Nos.) PULL BOX COVER
ROAD SURFACE/ FRAME WITH INLETS
60 3 60 3 60 REF. BELOW COVER & FRAME DETAILS 3. END DUCT MUST BE IN LINE.
16mm MORTAR INTERLOCK PAVING WORKING PIT
C EXISTING GROUND LEVEL EXISTING GROUND LEVEL 4. PULL BOX COVER AND FRAME CLASS D400 FOR ALL
90
90
90
970
- NATURAL SOIL FILLING TO THE HEIGHT: 95mm AREAS, AND PROVIDED WITH UNIQUE LOCK.
90
220
75mm HOLE FOR NORMAL GROUND LEVEL STEEL FRAME
PIPE FIXING Ø75mm HOLE
FOR COMPACTION SEE NOTE 14 700345480
EXTERNAL PROTECTION 375 375 FOR PIPE FIXING
AS PER SPECIFICATION 300 154 154 300
220
EXTERNAL PROTECTION 100131 131100 FRAME WITH INLETS
AS PER SPECIFICATION NOTES FOR CONCRETE PULL BOX:
825
825
BASE PLATE HEIGHT: 140mm
1065
1065
75 75
75 75 HEAD FRAME 5. CONCRETE STRENGTH AT LEAST 40 N/mm².
70
150
5
75 75 GEOTEXTILE 063780082 6. CONCRETE COVER FOR REINFORCEMENT
75 2"Ø DRAIN PIPE 75 SOAKAGE LAYER OF 150mm MINIMUM OF 50mm AT THE EDGES AND 30mm AT
75 SEE NOTE 10 75 Min.(STONE SIZES 8-24mm)
75 75 50mmØ THE FACES.
50mmØ 75mmØ FRAME HEIGHT: 220mm
150
150
150 150 75mmØ 7. ALL EXPOSED CONCRETE EDGES SHALL HAVE A
110mmØ WIDTH 6X Ø110
LENGTH 10XØ110 25mmx25mm CHAMFER.
E SECTION
100mm THK BLINDING
T10@150C/C 300X300 GEOTEXTILE +GRAVEL 100mm THK BLINDING
ONE COAT PRIMER
T10@150C/C
VERTICAL & HORIZONTAL
- 063780052 8.
9.
SPACERS IN ROBUST PROPRIETARY PLASTIC.
EXTRA OPENINGS CLOSED WITH STYROFOAM
VERTICAL & HORIZONTAL
1000 550 FRAME HEIGHT: 220mm OR EQUIVALENT EXTRUDED POLYSTERENE FOAM
25mm CEMENT RENDERING WITH FALL TO THE END. 200 75 400 75 200 WIDTH 6X Ø110 SEALED WITH SILICON MASTIC.
DIRECTION DETERMINED BY SITE CONDITIONS. LENGTH 10XØ110
063780052 10. DRAIN PIPE INSTALLED ONLY IF WATER TABLE IS
95
100
EXISTING GROUND LEVEL BELOW THE CONCRETE PULL BOX BOTTOM LEVEL.
A SECTION B SECTION
- - HEIGHT: 220mm
970
NATURAL SOIL FILLING TO THE HEIGHT: 70mm CONCRETE:-
25 NORMAL GROUND LEVEL FOR FRAME
IT IS MANDATORY TO PROTECT ALL UNDERGROUND
COMPACTION SEE NOTE 14 063780058
CHAMFER HEIGHT: 5mm
CONCRETE STRUCTURES AS PER THE
-- DETAIL-Z
NTS 1215
FRAME WITH INLETS
BASE PLATE
BASE PLATE
063780054
SPECIFICATION WHICH INCLUDES THE FOLLOWING.
11. OUTER SURFACE OF WALLS OF ALL PULL BOXES
OVERALL HEIGHT: 970mm
70
150
5
GEOTEXTILE AND CABINETS.
607 607
Ø75mm HOLE 150 150 308 308 150 150 Ø75mm HOLE ISOMETRIC VIEW 12. BOTTOM SURFACE OF BASES OF ALL PULL BOXES /
FOR PIPE FIXING (3+3 Nos.) 110mmØ SOAKAGE LAYER OF 150mm Min. CABINETS.
FOR PIPE FIXING 50mmØ 75mmØ (STONE SIZES 8-24mm)
1215 (5 Nos.) 13. OUTER SURROUNDING SURFACE OF ALL CABINET/
D SECTION
150
55
FOR GRASS OR SAND
380
+GRAVEL
75
150
55
2"Ø DRAIN PIPE DENSITY OF 95%.
150
212
SEE NOTE 10
960 -FOR NON-LOAD BEARING AREAS (UNPAVED AREAS):
Ø75mm HOLE 2"Ø DRAIN PIPE 800
150
400
550
COMPACTION SEE NOTE 14 -LEVEL OF COMPACTION TESTED FOR 10% OF THE
C SECTION -
- PLAN NUMBER OF PULL BOXES/CABINETS, AS RANDOMLY
ELECTED BY THE ENGINEER.
15. THE POLYCARBONATE PULL BOX SHALL NOT BE
PRECAST CONCRETE PULL BOX GEOTEXTILE
INSTALLED ON UNPAVED AREAS WHERE VEHICLE
ACCESS IS EXPECTED; THE PRECAST CONCRETE
SOAKAGE LAYER OF 150mm Min.
(STONE SIZES 8-24mm) PLAN PULL BOX INSTALLED INSTEAD IN SUCH
D SECTION
- FOR ASPHALT ROAD / PAVEMENT
SITUATIONS.
155
M.C.C
40
155
ممت
40
M.C.C
تمم
460
570
2022-02
D TYPE BOLT
F F M10 SS ANTI THEFT BOLT -6 NOS
100
EN 124-2 D400
SECTION-F-F
915
1025
PLAN COVER & FRAME
300
300
300 NATURAL SOIL FILLING TO 300 GROUND LEVEL. FOR TRENCH BACKFILL 300 - uPVC CLASS 6 FOR AREAS WITH PEDESTRIAN ACCESS ONLY.
GROUND LEVEL. FOR TRENCH BACKFILL
(MIN.) THE NORMAL GROUND LEVEL. (MIN.) COMPACTION SEE NOTE 9. (MIN.)
(MIN.)
(MIN.)
(MIN.)
COMPACTION SEE NOTE 9. - HDPE SDR17 PE100 FOR ROAD CROSSING/ CONCRETE
600
600
600
FOR TRENCH BACKFILL
COMPACTION SEE NOTE 9. WARNING TAPE FOR TRENCH CONDUITS CONDUITS ENCASED LOCATIONS.
FIBER/ELECTRICAL (SEE NOTE 6) WARNING TAPE ELECTRICAL (SEE DESCRIPTION 5. INDICATIVE TRENCH AND HDD CONDUITS NUMBERS AND
WARNING TAPE FOR TYPE 75mm Ø 50mm Ø
1008
250 NOTE 6)
50
50
50
250 250 FIBER/ELECTRICAL (SEE NOTE 6) 250 250 CABLE COVERING TILE (SEE NOTE 7) SIZES AS PER CONDUITS SCHEDULE, UNLESS OTHERWISE
1162
CABLE COVERING TILE (SEE NOTE 7)
CABLE COVERING TILE (SEE NOTE 7) TP POLE TO PULL BOX 3 2 NOTED IN THE SPECIFIC SITE PLAN DRAWINGS.
75 75 75 100
100
75 75 75 75 75 100
SAND FILLING (SEE NOTE 10) SAND FILLING (SEE NOTE 10)
SAND FILLING (SEE NOTE 10) FORMATION LEVEL 2x75mmØ uPVC CONDUIT TS SVC/LPRC TO PULL BOX 9 - 6. WARNING TAPE:
4x75mmØ uPVC CONDUIT UNDER GROUND DUCT SPACER
FORMATION LEVEL
9x75mmØ uPVC CONDUIT
100 100 100 -CHEMICAL RESISTANT POLYETHYLENE
BEDDING (SEE NOTE 8)
300
BEDDING (SEE NOTE 8) TG GANTRY TO PULL BOX 4 3 -Min.30cm WIDE
200 200 200 FORMATION LEVEL BEDDING (SEE NOTE 8) -Min.150 MICRONS THICK
ADDC TO METER CABINET
600
170 130 130 170 TRENCH TYPE PB2 TA TO POWER CABINET
1 - -Min.125Kg/cm² STRENGTH LONGWISE
(PRIVATE NETWORK / PULL BOX TO PULL BOX) -Min.105Kg/cm² STRENGTH CROSSWISE
TRENCH TYPE PB4 600
TE ETISALAT TO PULL BOX 1 - -Min 350% ELONGATION FACTOR
(PULL BOX TO PULL BOX)
TRENCH TYPE PB9 -ALL WARNING TAPES SHALL HAVE RED COLOR ELECTRICAL
TR RVC TO PULL BOX 3 3 CABLES & FIBER CABLES WITH ``MCC" INSCRIPTION IN LARGE
(PULL BOX TO PULL BOX)
BLACK CAPITAL LETTERS DISTANCED 1M AND PRINTED
TU UPSC TO PULL BOX 4 - ALTERNATELY IN ENGLISH AND ARABIC.THE WARNING TAPES
POWER CABINET TO PLACED WITH THE INSCRIPTIONS FACING UP.
TC PULL BOX
6 1 -REFER DRAWING NO.:-AB-TYP-S-208
GROUND LEVEL
REINSTATE AS ORIGINAL CONDITION
GROUND LEVEL
REINSTATE AS ORIGINAL CONDITION
GROUND LEVEL
REINSTATE AS ORIGINAL CONDITION
HDD HDD Y Y 7. CABLE COVERING TILE:
-500mm LONG,250mm WIDE AND 50mm THICK.
PB X PULL BOX TO PULL BOX X X -ALL CABLE COVERING TILE SHALL HAVE "MCC" INSCRIPTION IN
300
300
300
300 NATURAL SOIL FILLING TO THE NORMAL NATURAL SOIL FILLING TO THE NORMAL ENGLISH, NOT LESS THAN 25mm SIZE.
NATURAL SOIL FILLING TO
GROUND LEVEL. FOR TRENCH BACKFILL GROUND LEVEL. FOR TRENCH BACKFILL CABINET/POLE/GANTRY
(MIN.) THE NORMAL GROUND LEVEL.
100 300 100 300 100 100 300 100 300 100
TEP X 1
(MIN.)
(MIN.)
(MIN.)
600
600
FOR TRENCH BACKFILL
WARNING TAPE FIBER/ELICTRICAL
8. BEDDING FORMATION:
COMPACTION SEE NOTE 9. WARNING TAPE FIBER/ELICTRICAL
WARNING TAPE FOR
(SEE NOTE 6) (SEE NOTE 6)
IDF IDF TO PULL BOX 6 2 - MADE OF CLEAN SAND FREE FROM DEBRIS, ROCKS, PEBBLES,
1008
50
50
BOULDERS AND ANY SHARP OBJECTS.
50
250 250 FIBER/ELECTRICAL (SEE NOTE 6) 250 250 250 CABLE COVERING TILE (SEE NOTE 7) 250 250 250 CABLE COVERING TILE (SEE NOTE 7)
CABLE COVERING TILE (SEE NOTE 7)
NOTE:- -IF THE BEDDING FORMATION IS OF HARD GROUND SUCH AS
SAND FILLING (SEE NOTE 10) SAND FILLING (SEE NOTE 10)
1. X- NUMBER OF DUCTS REFER "PB" SECTION EXISTING ASPHALT, CONCRETE, OR NOT MEETING THE ABOVE
75 75 75 100
100
100
SAND FILLING (SEE NOTE 10) FORMATION LEVEL 3x50mmØ uPVC CONDUIT
FORMATION LEVEL 2x50mmØ uPVC CONDUIT 2. Y- AS PER MCC REQUIREMENT. 2022/02 REQUIREMENTS ON POINT # 1, CONTRACTOR HAS TO
5x75mmØ uPVC CONDUIT EXCAVATE MINIMUM 100mm BELOW FORMATION LEVEL AND
BEDDING (SEE NOTE 8)
FORMATION LEVEL BEDDING (SEE NOTE 8) 3x75mmØ uPVC CONDUIT 100 140 130 300 130 100
BEDDING (SEE NOTE 8) 3x75mmØ uPVC CONDUIT
100 130 130 180 130 130 100 TRENCH - CONDUITS SCHEDULE FORM A 100mm THICK SAND BEDDING, BEFORE LAYING
(SEE NOTE-5)
170 130 130 170 900 CONDUITS OR PIPES
900
600
TRENCH TYPE TP 9. TRENCH BACKFILLING COMPACTION:
TRENCH TYPE TR
TRENCH TYPE PB5 (POLE TO PULL BOX) RVC TO PULL BOX
- FOR LOAD BEARING AREAS (PAVED AREAS AND
(PULL BOX TO PULL BOX) CARRIAGEWAYS): BACKFILL LAYERS SHALL NOT EXCEED 15cm
WITH MINIMUM DENSITY OF 95%.
- FOR NON-LOAD BEARING AREAS (UNPAVED AREAS):
BACKFILL LAYERS SHALL NOT EXCEED 15cm AND
FREE OF VOIDS, LUMPS, UNDULATIONS AND DEPRESSIONS.
100
GROUND LEVEL GROUND LEVEL REINSTATE AS ORIGINAL CONDITION GROUND LEVEL
DETAIL-A 11. ALL DUCT BANKS TO BE PROVIDED WITH POLYPROPYLENE
NATURAL SOIL FILLING TO
NYLON 8MM DIA CABLE GUIDE ROPE.
300
300
300 NATURAL SOIL FILLING TO THE NORMAL
364
50
NATURAL SOIL FILLING TO THE NORMAL
(MIN.)
100 300 100 300 100 GROUND LEVEL. FOR TRENCH BACKFILL
SIDE VIEW
(MIN.)
(MIN.)
150 300 100 300 150 GROUND LEVEL. FOR TRENCH BACKFILL COMPACTION SEE NOTE 9.
TOP VIEW
600
600
600
COMPACTION SEE NOTE 9. COMPACTION SEE NOTE 9. - FUTURE CROSSING DUCT TO BE PROVIDED WITH
WARNING TAPE FOR WARNING TAPE FIBER/ELICTRICAL
WARNING TAPE FIBER (SEE NOTE 6) 20 * SS Plate (100x100x3mm) NECESSARY PROTECTION, 6 x 75MM Ø FOR SUB ROAD
1008
50
70 250 250 250 70
50
250 250 CABLE COVERING TILE (SEE NOTE 7) CABLE COVERING TILE (SEE NOTE 7) * Stainless Steel Plate (Grade 316l) & 9 X 75MMØ FOR MAIN ROAD.
CABLE COVERING TILE (SEE NOTE 7)
50
100
6x75mmØ uPVC CONDUIT DUCT MARKER.
4x75mmØ uPVC CONDUIT
100
FORMATION LEVEL
5x75mmØ uPVC CONDUIT FORMATION LEVEL
BEDDING (SEE NOTE 8)
MCC DUCT FLUSH TYPE MARKER
SAND FILLING (SEE NOTE 10) BEDDING (SEE NOTE 8) 13. MANDREL TEST:
FORMATION LEVEL 255 130 130 130 255
BEDDING (SEE NOTE 8) 4x75mmØ uPVC CONDUIT -THE EFFECTIVE DIAMETER OF THE MANDREL MUST BE 95
75 100 100 100 150 100 100 100 100 75
170 130 130 170
900
PERCENT OF THE NOMINAL PIPE DIAMETER AND VERIFIED
600 1000
2022/02 USING A PROVING RING.
-THE MANDREL IS SIZED TO ALLOW FOR UP TO 5%
TRENCH TYPE PB6 TRENCH TYPE TS TRENCH TYPE TU DEFORMATION OF THE INSTALLED PIPE. NOMINAL PIPE
UPSE TO PULL BOX
(PULL BOX TO PULL BOX) (SVC/LPRC TO PULL BOX) DIAMETERS ARE DEFINED IN THE RESPECTIVE AASHTO
STANDARDS
300
THE NORMAL GROUND LEVEL. 100 300 100 300 100 GROUND LEVEL. FOR TRENCH BACKFILL 100 300 100 300 100 GROUND LEVEL. FOR TRENCH BACKFILL
(MIN.)
(MIN.)
(MIN.)
600
600
250 250 250 250 250 CABLE COVERING TILE (SEE NOTE 7) CABLE COVERING TILE (SEE NOTE 7)
1080
100
MANDREL 2022/02
(SEE NOTE 13)
REINSTATE AS ORIGINAL CONDITION REINSTATE AS ORIGINAL CONDITION FINISHED ROAD LEVEL 625
GROUND LEVEL GROUND LEVEL
300
300 300 NATURAL SOIL FILLING TO THE NORMAL THE NORMAL GROUND LEVEL.
NORMAL GROUND LEVEL. FOR TRENCH
GROUND LEVEL. FOR TRENCH BACKFILL FOR TRENCH BACKFILL
(MIN.) BACKFILL COMPACTION SEE NOTE 9. (MIN.)
(MIN.)
(MIN.)
600
COMPACTION
WARNING TAPE FOR WARNING TAPE ELECTRICAL (SEE WARNING TAPE FOR
FIBER/ELECTRICAL (SEE NOTE 6) NOTE 6) FIBER/ELECTRICAL
250
50
50
250 250
1162
CABLE COVERING TILE (SEE NOTE 7) CABLE COVERING TILE (SEE NOTE 7) SAND FILLING
SAND FILLING (SEE NOTE 10)
75 75 75 75 75 100
75 75 75 75 75 100
75 100
200
CONCRETE CLASS K250 AREA NOT BE LESS THAN 450 FORM KERB/EDGE
KERB/EDGE
AREA TO EXTEND TO KERB/EDGE
300
IF LESS THAN 450
600
uPVC CONDUITS (REFER
> 450
NOTE-3)
300
ADJOINING CONCRETE
PAVEMENT
150 450 150 > 450
750
1000 EDGE
LIMIT OF REINSTATEMENT
PERMANENT REINSTATEMENT
EXISTING CONSTRUCTION BITUMINOUS CARRIAGEWAY TRENCH
NOTES:
1. THE SUBBASE AND ROADBASE PUT BACK OF THE SAME THICKNESS AS THE ADJOINING PAVEMENT.
2. THE BITUMINOUS SURFACING LAYERS PUT BACK CONSIST OF A BASE COURSE AND A WEARING COURSE WHERE A FRICTION COURSE IS 3. THE REINSTATEMENT AREA RECTANGULAR IN PLAN WITH THE SIDES EITHER PARALLEL OR PERPENDICULAR THE NEAREST EDGE OF THE BITUMINOUS
PRESENT LAYER OF THE SAME THICKNESS PUT BACK. PAVEMENT. STEPPED OR L- SHAPED REINSTATEMENT AREA IS PERMITTED ONLY IF
a) THE REINSTATEMENT AREA RUNS ALONG THE LENGTH OF THE CARRIAGEWAY, FOOTWAY OR CYCLE WAY, IN SUCH CASES
3. REFER TO GENERAL SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. IN GENERAL A TYPICAL CONSTRUCTION COULD CONSIST OF - THE LENGTH OF EACH STEP ALONG THE LENGTH OF THE CARRIAGEWAY, FOOTWAY OR CYCLEWAY IS NOT LESS THAN 20 METRES EXCEPT AT LOCATION OF
FRICTION COURSE - 10mm NOMINAL SIZE FRICTION COURSE MATERIAL MANHOLES OR JUNCTION BOXES;
WEARING COURSE - 10mm 20mm NOMINAL SIZE BASE COURSE MATERIAL - THE LENGTH OF EACH STEP PERPENDICULAR TO THE LENGTH OF THE CARRIAGEWAY, FOOTWAY OR CYCLEWAY ID NOT LESS THAN 300 MILLIMETERS; OR
BASE COURSE - 28mm OR 37.5mm NOMINAL SIZE BASE COURSE MATERIAL b) THE TRENCH GOES ROUND A ROAD JUNCTION, IN SUCH CASES A CHAMBER AT THE CORNER IS PERMITTED.
ROADBASE - 37.5mm NOMINAL SIZE ROADBASE MATERIAL
SUBBASE - GRANULAR SUBBASE MATERIAL
LIMIT OF
REINSTATEMENT
BITUMINOUS CARRIAGEWAY AREA
MANHOLE LOCATION
CHAMFER AT
10mm JUNCTION PERMITTED KERB LINE
BITUMINOUS EDGE SAW CUT
SURFACING TO 20 DEPTH
SURFACING MINIMUM 25
THICK
BITUMINOUS
150 MIN. SURFACING 300 MINIMUM
ROAD BASE
COMPACTED
BITUMINOUS OR 300 MINIMUM
BACKFILL
GRANULAR
SUBBASE EXTENT OF TRENCH
>20000 >20000 >20000
200
A. CARRIAGEWAY CONSTRUCTED WITHIN THE LAST 5 YEAR,. CARRIAGEWAY RE-SURFACED WITHIN THE LAST 1 YEAR AND FOOTWAY OR CYCLE
300
600
uPVC CONDUITS (REFER
NOTE-3) 1. IN ADDITION TO THE RULES A1, A2 AND A3 MENTIONED ABOVE, THE REINSTATEMENT AREA EXTEND TO THE FULL WIDTH OF THE TRAFFIC
300
LANES(S) IN WHICH THE TRENCH IS SITUATED. ANY EXTENSION OF THE REINSTATEMENT AREA BEYOND THE MINIMUM LIMIT CAN BE DONE BY
COLD MILLING AND RESURFACING THE WEARING COURSE WITHIN THE EXTENDED AREA.
150 450 150
750
1000 1000 MINIMUM
PERMANENT REINSTATEMENT
EXISTING CONSTRUCTION BITUMINOUS FOOTWAY AND CYCLEWAY
KERB/EDGE
REINSTATEMENT AREA TO
NOTES: LIMIT OF REINSTATEMENT EXTEND FULL WIDTH OF TRAFFIC
LANE
1. THE SUBBASE PUT BACK GRANULAR MATERIAL BITUMINOUS MATERIAL AND OF THE SAME THICKNESS AS THE ADJOINING FOOTWAY OR TRAFFIC LANE MARKINGS
1000 MINIMUM
CYCLEWAY.
2. THE SURFACING PUT BACK OF 10mm NOMINAL SIZE WEARING COURSE MATERIAL AND OF THE SAME THICKNESS AS THE ADJOINING FOOTWAY
OR CYCLEWAY.
2. THE SAND COURSE PUT BACK EXCEED 20mm AND NOT EXCEED 30mm THICK.
SEE NOTE 1
TRENCH
3. THE PAVING SLABS/BLOCKS PUT BACK OF THE SAME THICKNESS AS THE ADJOINING
PAVEMENT SUBJECT TO A MINIMUM OF 60 MILLIMETERS IN FOOTWAY AND 80
MILLIMETERS IN CARRIAGEWAY OR RUN IN.
SUBBASE GRANULAR SUBBASE COMPACTED BACKFILL
MATERIAL
EXTENT OF TRENCH LEGEND: 4. ALL PAVING SLAB/BLOCKS WITHIN A DISTANCE OF W MILLIMETERS FROM THE SIDE OF
A TRENCH OR DISTURBED AS RESULT OF THE UTILITY WORKS TAKEN UP AND RELAID
SLAB/BLOCK TAKEN UP TOGETHER WITH THE OTHER SLAB/BLOCK REMOVED FOR THE TRENCHING WORK. W
200
CONCRETE CLASS K250 AND RELAID AT LEAST 300mm OR TWICE THE LARGEST LATERAL DIMENSION OF THE PAVING
SLAB/BLOCKS USED IN PAVING PATTERN (THE PATTERN MAY INVOLVE SLAB/BLOCK
300
SLAB/BLOCK REMOVED OF A FEW DIFFERENT SIZES), WHICHEVER IS THE GREATER. IF NECESSARY, FURTHER
FOR TRENCH OPENING SLAB/BLOCKS SHOULD BE LIFTED AND REINSTATED.
600
20 CHAMFER
170 50 180 20 m TRANSITION NOTES
CONC. BARRIER ADJOINING
20 CHAMFER
TYPE I OR IA A B CURB 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
500 OTHERWISE NOTED.
TOP OF KERB HEIGHT
A/5 A/5 A/5 A/5 A/5 2. DOWEL BARS 25 DIA DEFORMED
BARRIER *
50CL (MIN)
0 200 220 300 360 450 REINFORCEMENT BARS AND ON 1250 CENTRES,
STAGGERED SIDE TO SIDE.
510
WWF 1520x1520 2 A 19500 17500 17500 17500 17500 17500
3. MAXIMUM JOINT SPACING FOR BARRIER AND
MW258xMW258
B 0 2000 2000 2000 2000 2000 BARRIER TRANSITION SECTIONS.
840
R=250 4. IN LIEU OF WELDED WIRE FABRIC, THE
60mm/m BATTER 1 C 688 712 716 732 750 762
CONTRACTOR MAY ELECT TO USE 4-14 DIA
PERMITTED DEFORMED HORIZONTAL REINFORCEMENT
840
D 536 584 592 624 660 684
BARS ON 230 CENTERS AND 14 DIA DEFORMED
250
C
VERTICAL REINFORCEMENT ON 760 CENTERS
50CL (MIN)
VERTICAL FACE E 384 456 468 516 575 606 (VERTICAL BAR MAY BE OMITTED IF THE WALL IS
D
SEE NOTE 2 FINISHED SLIP FORMED) MINIMUM BAR LAP 330.
FINISHED
E
PAVEMENT LEVEL F 232 328 344 408 488 528
80
GROUND
ROADWAY PAVEMENT
EDGE OF 80 VERTICAL FACE 5. AT LOCATIONS WHERE CONCRETE BARRIER
F
(MIN) (MIN)
G 80 200 220 300 360 450 ABUTS A RIGID STRUCTURE, A 50 THICK
100
150
100 100
SHOULDER REMAINS FOR A
H
450mm CURB PREFORMED EXPANSION JOINT FILLER
100 80
150 80
H -- 200 220 300 360 450 CONFORMING TO THE SHAPE OF THE BARRIER
INSTALLED BETWEEN THE BARRIER AND THE
100 100 200 100 100 VERTICAL FACE --
410
280
410
280
CONCRETE BARRIER TYPE IA
50
MW258xMW258
20 CHAMFER 20 CHAMFER
FINISHED
GROUND
120
R=250
60mm/m BATTER C
C
50CL (MIN)
PERMITTED
450
D
250
50CL (MIN)
840
840
80
EDGE OF E 3
ROADWAY PAVEMENT
(MIN)(MIN)
EDGE OF
100
150
100 100
F SHOULDER
SHOULDER
F 220
170
50 G G
CONCRETE
80
80
FOUNDATION ISOMETRIC VIEW
J 80 WHEEL STOPPER DETAILS
CONCRETE BARRIER TYPE IIA
600
CONCRETE BARRIER TYPE II
400
400
EDGE OF FOUNDATION WHEN BARRIER
ABUTS RIGID STRUCTURE (SEE NOTE 5)
SIDE VIEW 1-1 SIDE VIEW 2-2
(TRUCK ROUTE)
85
FOR CONCRETE BARRIERS THAT TRANSITION TO
CONCRETE BARRIER TYPE II & IIA TYPE "A" KERB TRANSITION TO A KERB
280
25
(CAST-IN-PLACE)
400
FINISHED
PAVEMENT LEVEL
CONCRETE
HAUNCHING
140
CEMENT MORTAR
J EDGE OF CONCRETE
EDGE OF
SHOULDER FOUNDATION
SHOULDER K
20 15 20
WWF (SEE CONC BARRIER 400 225 390 75
CAST-IN-PLACE BARRIER
80
COMPOUND
100
150
100
150
100 100
15 PREFORMED
JOINT FILLER 100 (*)
410
410
280
280
PAVED PARKING
170
CONCRETE FOUNDATION (SEE CONC. CONCRETE FOUNDATION (SEE CONC.
600 AREA
BARRIER TYPE I & IA DETAIL) BARRIER TYPE I & IA DETAIL)
50
STYROFOAM
CONCRETE BARRIER TYPE IA
BACKUP ROD
CONCRETE BARRIER TYPE I
ROADWAY DETAILS CONCRETE BARRIERS, KERBS & WHEEL STOPPER (12 / 24)
Typical Drawing Ref.
Rev. Drawing No. Date
Z1 AB-TYP-S-201 11-Nov-17
A GENERAL CONCRETE MATERIAL SCHEDULE
A1 STRUCTURAL DRAWINGS READ IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, DOCUMENTS, 28-DAY CUBE
ELEMENT GRADE COMPRESSIVE CEMENT TYPE REMARKS
SPECIFICATIONS ETC. AS MAY BE ISSUED DURING THE COURSE OF THE CONTRACT. ALL DISCREPANCIES TO ASTM C150
STRENGTH (Mpa)
REFERRED TO THE DESIGN CONSULTANT FOR DECISION BEFORE PROCEEDING.
SUBSTRUCTURE
A2 ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE. DIMENSIONS NOT BE OBTAINED BY PILES K415 40.71 TYPE II
SCALING DRAWINGS. RAFT/ PILE CAPS K415 40.71 TYPE II
RETAINING WALLS K415 40.71 TYPE II DURABLE MIX
A3 ALL LEVELS SHOWN ARE IN METERS WITH REFERENCE TO ABU DHABI MUNICIPALITY DATUM UNLESS NOTED
OTHERWISE. GRADE BEAMS K415 40.71 TYPE II
GRADE SLAB K415 40.71 TYPE II
A4 FOR MAIN SETTING OUT LINES AND LEVELS REFER TO CIVIL DRAWINGS
BLINDING K140 13.73 TYPE I
A5 THE CONTRACTOR RESPONSIBLE FOR ENSURING THE SAFETY OF CONSTRUCTION AT ALL TIMES AND
D3 THE CONTRACTOR PERFORM AND SUBMIT FOR REVIEW INSTRUMENT SURVEYS OF FINISHED CONCRETE
ENSURE THAT NO PARTLY COMPLETED CONSTRUCTION IS HAZARDOUS.
SLAB SURFACES, BOTH BEFORE AND AFTER REMOVAL OF FORMWORK AND/OR SHORING SYSTEM TO
A6 THE CONTRACTOR PROVIDE TEMPORARY BRACING AND SHORING AGAINST LATERAL FORCES AND ALL
VERIFY AS-BUILT TOLERANCES.
CONSTRUCTION LOADS THROUGHOUT THE CONSTRUCTION PROCESS.
THE DESIGN CONSULTANT'S REVIEW PROCESS FOR ALL SUBMITTALS, DRAWINGS, METHOD STATEMENTS SPECIFICATIONS. CAMBER BOTH UNDERSIDE AND TOP OF CONCRETE TO MAINTAIN THE SLAB AND BEAM
A8
AND DOCUMENTS IS ONLY COMPLETE ONCE A STATUS OF 'NO OBJECTION' IS REACHED. THE SUBMITTAL DEPTH SHOWN ON THE DRAWINGS UNLESS NOTED OTHERWISE.
REVIEWED BY THE DESIGN CONSULTANT FOR COMPLIANCE WITH THE DESIGN INTENT. THIS DOES NOT D6 AGGREGATE FOR CONCRETE FROM APPROVED SOURCE AND COMPLY WITH THE SPECIFICATION
RELIEVE THE CONTRACTOR FROM HIS CONTRACTUAL RESPONSIBILITIES. REQUIREMENTS.
A9 ALL DESIGN, WORKMANSHIP AND MATERIAL IN ACCORDANCE WITH THE CURRENT ACI, UBC, IBC, AISC AND D7 ALL CONCRETE CURED IN ACCORDANCE WITH THE SPECIFICATIONS.
LOCAL AUTHORITY STANDARDS AND PROJECT DESIGN CRITERIA UNLESS NOTED OTHERWISE. EQUIVALENT
D8 ALL REINFORCING BARS CONFORM TO BS 4449 GRADE 460 TYPE 2 DEFORMED HIGH YIELD BARS. DENOTED
BRITISH STANDARDS MAY BE ACCEPTABLE SUBJECT TO APPROVAL OF THE DESIGN CONSULTANT.
BY `T' ON STRUCTURAL DRAWINGS.
B1 THE NET ALLOWABLE GROUND BEARING CAPACITY IS ASSUMED AS2 50kN/m AT 1.50m DEPTH FOR IN PLACE IN ACCORDANCE WITH THE PROCEDURES AND REQUIREMENTS OUTLINED IN THE CURRENT ACI
FOUNDATION TYPE 6 (PAD FOOTING FOUNDATIONS). 318 AND ACI 315 UNLESS NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS.
D11 WELDING AND/OR SITE CUTTING OF THE REINFORCING BARS NOT BE PERMITTED UNLESS REVIEWED AND
B2 CONTRACTOR CARRY OUT GEOTECHNICAL INVESTIGATION AS NECESSARY TO SUPPORT HIS DESIGN OF
ACCEPTED BY THE DESIGN CONSULTANT.
CAST IN SITU DRILLED PIER FOUNDATION.
D12 ALL PROPRIETARY FIXING INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
C EXCAVATION AND DE-WATERING
D13 MECHANICAL SPLICING OF LARGE DIAMETER BARS MAY BE ACCEPTABLE SUBJECT TO REVIEW BY THE
C1 THE CONTRACTOR PROVIDE SURFACE DRAINAGE CHANNELS, SUMPS AND SUMP PUMPS TO PROTECT ALL DESIGN CONSULTANT.
EXCAVATIONS FROM FLOODING. FLOODING OF ANY EXCAVATION AFTER APPROVAL OF SUBGRADE CAUSE
D14 ALL CONCRETE CONTAIN AN APPROVED WATER REDUCING, PLASTICIZING ADMIXTURE. APPROVED
FOR COMPLETE RE-PREPARATION AND APPROVAL OF THE SUBGRADE.
HIGH-RANGE WATER REDUCING ADMIXTURE MAY BE UTILIZED AT THE CONTRACTOR'S OPTION. ALL
C2 THE CONTRACTOR PROVIDE POSITIVE PROTECTION (MAT/SHEET COVERING) FOR ALL EXCAVATED SLOPES
CONCRETE PERMANENTLY EXPOSED TO WEATHER ALSO CONTAIN AN APPROVED AIR-ENTRAINING
TO PROTECT SLOPES FROM INSTABILITY AND DETERIORATION DUE TO ENVIRONMENTAL CONDITIONS.
ADMIXTURE TO PROVIDE PERCENTAGE OF AIR REQUIRED FOR SEVERE EXPOSURE AS PER ACI 318.
C3 THE EXCAVATION RETENTION SYSTEM DESIGNED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED D15 NO CALCIUM CHLORIDE USED IN ANY CONCRETE.
OTHERWISE, IN ACCORDANCE WITH THE GEOTECHNICAL DESIGN PARAMETERS AND SOIL PRESSURES AS
D16 THE FOLLOWING CONCRETE CLEAR COVER TO PRIMARY REINFORCEMENT PROVIDED, UNLESS LARGER
INDICATED IN THE GEOTECHNICAL INVESTIGATION REPORT.
COVER IS NOTED ON THE STRUCTURAL DRAWINGS.
C4 THE CONTRACTOR INSTALL AND CONTINUOUSLY SURVEY VERTICAL AND HORIZONTAL MOVEMENTS OF
THE TOP OF THE SOIL RETENTION SYSTEM, IF INSTALLED, BENCH MARKS ADJACENT TO AND AWAY FROM CONCRETE CLEAR COVER SCHEDULE
THE SITE PERIMETER FOR VERTICAL AND HORIZONTAL MOVEMENTS AND OBSERVATION WELLS FOR CLEAR COVER TO PRIMARY REINFORCEMENT (mm)
MONITORING WATER LEVELS BELOW GROUND SURFACE. ELEMENT ABOVE GROUND ABOVE GROUND
SURFACE IN CONTACT REMARKS
WITH GROUND INTERIOR EXTERIOR
C5 AFTER COMPLETION OF THE PERIMETER SOIL RETENTION SYSTEM, THE SITE DE-WATERED, AS ENVIRONMENT ENVIRONMENT
PILES 75 - -
NECESSARY, BEFORE (OR AS) THE EXCAVATION PROCEEDS. THE CONTRACTOR PROVIDE ALL COLUMNS/PEDESTAL 75 40 50
FOOTING 75 - -
CONSTRUCTION AND EQUIPMENT FOR THE DE-WATERING SYSTEM INCLUDING, BUT NOT LIMITED TO,
EQUIPMENT PADS 40 40
TRENCHES, SUMPS, DE-WATERING WELLS, WELL POINTS, OBSERVATION WELLS, PUMPING SYSTEM,
DISPOSAL LOCATION, SETTLING BASINS, MAINTENANCE AND EMERGENCY BACK-UP EQUIPMENT, ETC. . D17 SPLICES IN REINFORCEMENT CONFORM TO THE REQUIREMENTS OF THE RELEVANT BRITISH STANDARD
AND MADE ONLY IN THE POSITIONS SHOWN OR AS OTHERWISE APPROVED BY THE KEO. THE FOLLOWING
C6 THE DE-WATERING SYSTEM MAINTAIN THE WATER LEVEL AT MINIMUM OF 0.50 METER BELOW THE
MINIMUM SPLICE LENGTH USED UNLESS OTHERWISE NOTED
DEEPEST FOUNDATION SUBGRADE AT ALL TIMES.
BAR SIZE (mm) LAP LENGTH (mm)
10 500
D REINFORCED CONCRETE 12 600 NOTES:
D1 THE CONTRACTOR SUBMIT DETAILED RC DRAWINGS AND BAR BENDING SCHEDULES SHOWING BAR SIZES,
16 800 SPLICE LENGTHS PROVIDED FOR
SPACING, PLACEMENT AND SUPPORT DETAILS OF DOWELS AT EXPANSION JOINTS AND LAPS ETC. FOR THE SMALLER OF THE TWO BARS BEING
20 1000
REVIEW AND ACCEPTANCE OF THE DESIGN CONSULTANT. WORK NOT COMMENCE UNTIL THE SHOP SPLICED
25 1250
DRAWINGS ARE REVIEWED AND ACCEPTED. REVIEW OF SHOP DRAWINGS DOES NOT ALLEVIATE THE 32 1600
CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE INPUT OF ALL TRADES ON THE SHOP DRAWINGS. E PROTECTIVE COATINGS FOR CONCRETE
E1 UNLESS SHOWN OTHERWISE, ALL EXTERNAL CONCRETE SURFACE EXPOSED TO SOIL PROTECTED AS
D2 ALL CAST-IN-SITU CONCRETE HAVE MINIMUM 28-DAY CUBE COMPRESSIVE STRENGTH FOR VARIOUS
FOLLOWS: HORIZONTAL AND VERTICAL SURFACES: PROTECTION OF EXTERNAL CONCRETE SURFACE IN
ELEMENTS AS GIVEN IN THE CONCRETE MATERIAL SCHEDULE. ALL CONCRETE NORMAL WEIGHT
CONTACT WITH WATER & SOIL BELOW GROUND. ONE COAT PRIMER+ONE LAYER 5MM THICK TORCH
CONCRETE MINIMUM DENSITY OF 2400Kg/m³. AND MAXIMUM SIZE OF COURSE AGGREGATES OF 20mm
APPLIED SBS MODIFIED WATER PROOFING MEMBRANE+ONE LAYER OF 3MM THICK PROTECTION BOARD.
UNLESS NOTED OTHERWISE.
MIN. 1000mm
B 15.50 m WL (NORMAL) 0 0 12 70 67 66
B. PILING
MIN. 800mm
WL (TRANSVERSE) 12 0 0 0 0 70 REINFORCEMENT ABOVE THE
B1. PILING IN ACCORDENCE WITH THE INSTITUTION OF CIVIL ENGINEERS (I.C.E) CUT-OFF LEVEL SLEEVED WITH
SPECIFICATION FOR PILING WORKS AND EMBEDDED RETAINING WALL (1996) DL 16 26 0 0 0 36 DEBONDED PVC PIPE
EXCEPT AS VARIED BY THIS DRAWING OR SPECIFICATIONS. NO PERMANENT
CASING USED. C 18.30 m WL (NORMAL) 0 0 17 114 33 0 PILE CUT OFF LEVEL*
B6. DRILLED PIERS ARE DESIGNED IN ACCORDANCE WITH AASHTO CLAUSE 13.6. E 29.25 m WL (NORMAL) 0 0 43 287 195 72
FORCE - Y IS ACTING DOWNWARD A
-
THE DRAWINGS PRESENT THREE DIFFERENT DESIGNS TO ALLOW FOR
PORTAL
DIFFERENT SOIL CONDITIONS THROUGHOUT THE PROJECT EXTENT. WL (TRANSVERSE) 48 8 0 0 0 209
(2 LEGS)
THE FIRST DESIGN IS APPLICABLE AT LOCATIONS WHERE THE SOIL HAS A
DL 72 64 0 0 0 150
MINIMUM ANGLE OF INTERNAL FRICTION EQUAL TO OR GREATER THAN 32°
PILE LENGTH
THROUGHOUT THE FULL DEPTH OF THE DRILLED PIERS (DESIGN CONDITION 1).
F 32.90 m WL (NORMAL) 0 0 50 343 258 0
THE SECOND DESIGN IS APPLICABLE AT LOCATIONS WHERE THE SOIL HAS A
MINIMUM ANGLE OF INTERNAL FRICTION EQUAL TO OR GREATER THAN 24° WL (TRANSVERSE) 53 8 0 0 0 231
THROUGHOUT THE FULL DEPTH OF THE DRILLED PIERS (DESIGN CONDITION 2).
DL 96 80 0 0 0 212 VERTICAL REINFORCEMENT
THE THIRD DESIGN IS APPLICABLE AT LOCATIONS WHERE THE SOIL HAS A
MINIMUM ANGLE OF INTERNAL FRICTION EQUAL TO OR GREATER THAN 12°
G 36.26 m WL (NORMAL) 0 0 65 460 354 0 STIRRUPS
THROUGHOUT THE FULL DEPTH OF THE DRILLED PIERS (DESIGN CONDITION 3).
FOR EACH CONSTRUCTION SITE, THE CONTRACTOR INVESTIGATE THE SOIL WL (TRANSVERSE) 65 10 0 0 0 296
CONDITIONS UNDER THE SUPERVISION OF THE ENGINEER. THE APPLICABLE
DESIGN FOR EACH CONSTRUCTION SITE DECIDED BY THE ENGINEER BASED DL 101 79 0 0 0 250
ON THE OBTAINED GEOTECHNICAL DATA.
DL 0 19 0 0 0 0
7.70 m
7 or LL 0 2 0 0 0 0
8.50 m * THE CONTRACTOR MAY ADOPT SINGLE STAGE CASTING FOR THE DRILLED PIER,
PROVIDED THAT HIS WORKING METHOD IS ACCEPTABLE TO THE ENGINEER
WL 0 0 19 130 0 0
CAMERA POLE
NOTES:-
CAMERA POLE CAMERA POLE PIPE SLEEVES AS PER
PIPE SLEEVES AS PER PIPE SLEEVES AS PER SCHEDULE OF CONDUITS 1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
SCHEDULE OF CONDUITS BASE PLATE SCHEDULE OF CONDUITS 50mm THK. CEMENTITIOUS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
BASE PLATE BASE PLATE
50mm THK. CEMENTITIOUS 50mm THK. CEMENTITIOUS NON-SHRINK GROUT
8Nos. M24 HOLDING DOWN 8#M30 HOLDING DOWN BOLTS 8#M24 HOLDING DOWN 2. FOR GENERAL NOTES REFER TO TYPICAL DRAWING
NON-SHRINK GROUT (SEE NOTE 9) NON-SHRINK GROUT (SEE NOTE 9) (SEE NOTE 9)
BOLTS (DETAILS AS PER (DETAILS AS PER POLE BOLTS (DETAILS AS PER AB-TYP-S-201.
POLE SUPPLIER) SUPPLIER) 1-T16 RING EXTRA POLE SUPPLIER)
1-T16 RING EXTRA 1-T16 RING EXTRA
PIPE TOP LEVEL EXISTING GROUND LEVEL 3. HOLDING DOWN BOLTS PLACED & HOLD IN
PIPE TOP LEVEL EXISTING GROUND LEVEL PIPE TOP LEVEL EXISTING GROUND LEVEL
POSITION BEFORE POURING CONCRETE; LEVELS
B
- E- H- AND SETTING OUT OF BOLTS CHECKED BY THE
CONTRACTOR BEFORE CASTING OF PEDESTALS.
900
950
900
PEDESTAL
PEDESTAL
PEDESTAL
(SEE NOTE 7)
LENGTH
6-T25 U BAR
(SEE NOTE 7)
LENGTH
6-T16 U BAR BOTH WAYS
LENGTH
BOTH WAYS 6-T16 U BAR BOTH WAYS AND ANCHOR BOLTS FIXED FIRMLY BEFORE
ANCHOR PLATE (DETAILS
ANCHOR PLATE (DETAILS ANCHOR PLATE (DETAILS PEDESTAL CASTING.
AS PER POLE SUPPLIER)
AS PER POLE SUPPLIER) AS PER POLE SUPPLIER)
PILE CUT OFF LEVEL (SEE NOTE 8) 5. CONCRETE SURFACE ROUGHEN & 'NITOBOND' OF
PILE CUT OFF LEVEL (SEE NOTE 8) PILE CUT OFF LEVEL (SEE NOTE 8) FOSROC APPLIED AS PER MANUFACTURER
SPECIFICATION.
BOTTOM OF PEDESTAL (SEE NOTE 8) BOTTOM OF PEDESTAL (SEE NOTE 8) BOTTOM OF PEDESTAL (SEE NOTE 8)
6. FOR FURTHER NOTES ON CAST IN SITU DRILLED
(REFER TO TYPICAL (REFER TO TYPICAL PIER REFER TYPICAL DRAWING AB-TYP-S-202.
(REFER TO TYPICAL DRAWING AB-TYP-C-102 DRAWING AB-TYP-C-102
DRAWING AB-TYP-C-102 NOTE 4) NOTE 4) 7. FOR PILING LENGTH AND PEDESTAL LENGTH REFER
NOTE 4) TO TYPICAL DRAWING AB-TYP-C-102.
20-T25 VERTICAL BARS
26-T16 VERTICAL BARS I
- 8. THE CONTRACTOR MAY ADOPT SINGLE STAGE
C F
- CASTING FOR THE DRILLED PIER, PROVIDED THAT
PILLING LENGTH
-
PILLING LENGTH
(SEE NOTE 7)
(SEE NOTE 7)
ENGINEER.
18-T16 VERTICAL BARS
T10@200 c/c T12@150 c/c
9. MINIMUM COMPRESSIVE STRENGTH FOR THE
PILLING LENGTH
STIRRUPS STIRRUPS
GROUT 40.7MPA AT 28 DAYS.
(SEE NOTE 7)
CAST IN SITU PILE T10@200 c/c
CAST IN SITU PILE
STIRRUPS POLES
SCHEDULE OF CONDUITS
FOUNDATION ELECTRICAL COMMUNICATION GROUND
TYPE 75Ø CONDUIT 50Ø CONDUIT 25Ø CONDUIT
CAST IN SITU PILE
3,4 & 7 4 1 1
5&6 2 2 1
Ø 1200 Ø 1200
2022-02
A SECTION D SECTION
- -
Ø 1000
G SECTION
6-T25 U BAR
BOTH WAYS
-
6-T16 U BAR
BOTH WAYS
T12 @150 c/c
T10 @200 c/c STIRRUPS
STIRRUPS + 1-T16 RING EXTRA 6-T16 U BAR
+ 1-T16 RING EXTRA BOTH WAYS
800
800
Ø 1200 Ø 1200
Ø 1000
B SECTION E SECTION
- - H SECTION
-
00
Ø12
00 Ø12 00
Ø10
COMMUNICATION
LENGTH
1500
BOTTOM OF PEDESTAL (SEE NOTE 8) WATER PROOFING MEMBRANE FOR PILING LENGTH AND PEDESTAL LENGTH REFER TO
12-T16 (AS PER SPECIFICATION) 7. TYPICAL DRAWING AB-TYP-C-102.
PLAN VERTICAL BARS T12@150 B/W
THE CONTRACTOR MAY ADOPT SINGLE STAGE CASTING
8. FOR THE DRILLED PIER, PROVIDED THAT HIS WORKING
12-T16 VERTICAL BARS METHOD IS ACCEPTABLE TO THE ENGINEER.
300
C
- 9. MINIMUM COMPRESSIVE STRENGTH FOR THE GROUT
PILLING LENGTH
40.7MPa AT 28 DAYS.
(SEE NOTE 7)
100
1800 BLINDING CONCRETE
T10@200 c/c
STIRRUPS COMPACTED EARTH T12@150 B/W
POLES
D SECTION SCHEDULE OF CONDUITS
- FOUNDATION ELECTRICAL COMMUNICATION GROUND
CAST IN SITU PILE TYPE 75Ø CONDUIT 50Ø CONDUIT 25Ø CONDUIT
3, 4, 7 & 8 4 1 1
5&6 2 2 1
2022-02
Ø 600
A SECTION
- 600
12-T16 VERTICAL BARS
T10@200 c/c
600
ISOMETRIC VIEW
CONDUIT ARRANGEMENT
3-T20 U BAR E SECTION
BOTH WAYS -
T10 @200 c/c
STIRRUPS
+ 1-T16 RING EXTRA
B SECTION
-
1800
T12@150 B/W
T12@150 B/W
12-T16 VERTICAL BARS
1800
T10@200 c/c
D
-
STIRRUPS
Ø 600
C SECTION
-
DRILLED PIER FOUNDATION FOR POLES
TYPE 5 (4.50m AND 6.00m HEIGHT ) PLAN
PAD FOOTING FOUNDATION FOR POLES
TYPE 6 (4.50m AND 6.00m HEIGHT)
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
ARE IN METERS UNLESS OTHERWISE SPECIFIED.
900
900
5. CONCRETE SURFACE ROUGHEN & 'NITOBOND' OF
FOSROC APPLIED AS PER MANUFACTURER
(SEE NOTE 7)
(SEE NOTE 7)
6-T16 U BAR BOTH WAYS 6-T16 U BAR BOTH WAYS
PEDESTAL
SPECIFICATION.
PEDESTAL
LENGTH
LENGTH
ANCHOR PLATE (DETAILS AS PER ANCHOR PLATE (DETAILS AS PER
POLE SUPPLIER) POLE SUPPLIER) 6. FOR FURTHER NOTES ON CAST IN SITU DRILLED
PIER REFER TYPICAL DRAWING AB-TYP-S-202.
PILE CUT OFF LEVEL (SEE NOTE 8) PILE CUT OFF LEVEL (SEE NOTE 8)
I
- I
- 7. FOR PILING LENGTH AND PEDESTAL LENGTH REFER
TO TYPICAL DRAWING AB-TYP-C-102.
BOTTOM OF PEDESTAL (SEE NOTE 8) BOTTOM OF PEDESTAL (SEE NOTE 8)
75mmØ ELECTRICAL CONDUIT (TYP) 8. THE CONTRACTOR MAY ADOPT SINGLE STAGE
8 NOS. CASTING FOR THE DRILLED PIER, PROVIDED THAT
75mmØ ELECTRICAL CONDUIT (TYP) (REFER TO TYPICAL HIS WORKING METHOD IS ACCEPTABLE TO THE MCC
8 NOS. DRAWING AB-TYP-C-102 ENGINEER.
NOTE 4)
9. MINIMUM COMPRESSIVE STRENGTH FOR THE
GROUT 40.7MPA AT 28 DAYS.
18-T16 VERTICAL BARS 18-T16 VERTICAL BARS 10. PIPE SLEEVES FOR CABLE SHALL BE INSTALLED
BEFORE PLACING THE CONCRETE OF THE
PEDESTAL / PILE
PILLING LENGTH
(SEE NOTE 7)
T10@200 c/c T10@200 c/c 12. CROSSING CONDUITS SHALL BE PLACED /
PILLING LENGTH
K SECTION L SECTION
- -
Ø10
00
6-T16 U BAR 18-T16 VERTICAL BARS
BOTH WAYS 75mmØ ELECTRICAL
CONDUIT (TYP)
T10 @200 c/c 8 NOS.
STIRRUPS
+ 1-T16 RING EXTRA
K ANCHOR PLATE L
- (DETAILS AS PER -
POLE SUPPLIER)
25mm Ø ELECTRICAL T10@200 c/c
DUCT STIRRUPS
Ø 1000
I SECTION
-
L
-
J SECTION
-
GANTRY COLUMN
GANTRY COLUMN GANTRY COLUMN NOTES
GANTRY COLUMN PIPE SLEEVES AS PER SCHEDULE PIPE SLEEVES AS PER
PIPE SLEEVES AS PER (REFER TO NOTE 9 AND
(REFER TO NOTE 9 AND
SCHEDULE OF CONDUITS
(REFER TO NOTE 9 AND PIPE SLEEVES AS PER SCHEDULE OF CONDUITS (REFER TO NOTE 9 AND OF CONDUITS SCHEDULE OF CONDUITS 1. ALL DIMENSIONS ARE IN MILLIMETERS AND
TYPICAL DRAWING TYPICAL DRAWING TYPICAL DRAWING TYPICAL DRAWING
1-T16 RING EXTRA 1-T16 RING EXTRA 1-T16 RING EXTRA LEVELS ARE IN METERS UNLESS OTHERWISE
AB-TYP-C-102 NOTE 4) AB-TYP-C-102 NOTE 4) AB-TYP-C-102 NOTE 4) AB-TYP-C-102 NOTE 4)
1-T16 RING EXTRA SPECIFIED.
PIPE TOP LEVEL PIPE TOP LEVEL PIPE TOP LEVEL PIPE TOP LEVEL
EXISTING GROUND LEVEL EXISTING GROUND LEVEL EXISTING GROUND LEVEL EXISTING GROUND LEVEL
C F
- I L 2. FOR GENERAL NOTES REFER TO TYPICAL
- - - DRAWING AB-TYP-S-201.
80mm THK.CEMENTITIOUS 80mm THK.CEMENTITIOUS 3. HOLDING DOWN BOLTS PLACED & HOLD IN
80mm THK.CEMENTITIOUS 80mm THK.CEMENTITIOUS
PEDESTAL LENGTH
PEDESTAL LENGTH
NON-SHRINK GROUT POSITION BEFORE POURING CONCRETE; LEVELS
PEDESTAL LENGTH
PEDESTAL LENGTH
EMBEDMENT LENGTH
NON-SHRINK GROUT NON-SHRINK GROUT NON-SHRINK GROUT
EMBEDMENT LENGTH
AND SETTING OUT OF BOLTS CHECKED BY THE
(SEE NOTE 7)
(SEE NOTE 7
(SEE NOTE 10)
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 10) (SEE NOTE 10) (SEE NOTE 10)
CONTRACTOR BEFORE CASTING OF PEDESTALS.
HOLDING DOWN BOLTS (DETAILS HOLDING DOWN BOLTS (DETAILS
AS PER GANTRY SUPPLIER) AS PER GANTRY SUPPLIER) 4. PILE REINFORCEMENT STRAIGHTEN, PIPE
1200
1200
HOLDING DOWN BOLTS (DETAILS HOLDING DOWN BOLTS (DETAILS SLEEVES AND ANCHOR BOLTS FIXED FIRMLY
8-T32 BAR 10-T32 BAR
AS PER GANTRY SUPPLIER) AS PER GANTRY SUPPLIER) BEFORE PEDESTAL CASTING.
BOTH WAYS BOTH WAYS
6-T25 U BAR BLINDING CONCRETE 5. CONCRETE SURFACE ROUGHEN & 'NITOBOND'
10-T25 U BAR
BOTH WAYS BOTH WAYS PILE CUT OFF LEVEL (SEE NOTE 8) PILE CUT OFF LEVEL (SEE NOTE 8) OF FOSROC APPLIED AS PER MANUFACTURER
SPECIFICATION.
PILE CUT OFF LEVEL (SEE NOTE 8) PILE CUT OFF LEVEL (SEE NOTE 8)
50
50
6. FOR FURTHER NOTES ON CAST IN SITU DRILLED
BLINDING CONCRETE PIER REFER TYPICAL DRAWING AB-TYP-S-202.
PILLING LENGTH
PILLING LENGTH
- -
PILLING LENGTH
PILLING LENGTH
-
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 7)
(SEE NOTE 7)
9. FOR TWO LEGGED GANTRIES TOP OF BOTH
PEDESTALS SHOULD BE MAINTAINED AT SAME
T12@150 c/c T16@150 c/c T16@150 c/c T16@150 c/c ELEVATION KEEPING
STIRRUPS STIRRUPS STIRRUPS STIRRUPS THE MINIMUM HEIGHT OF PEDESTAL AS PER
NOTE 4 OF THE TYPICAL DRAWING AB-TYP-C-102.
GANTRIES
SCHEDULE OF CONDUITS
Ø 1200 Ø 1400 150 Ø 1200 150 50 Ø 1400 50 ELECTRICAL COMMUNICATION GROUND
75Ø CONDUIT 50Ø CONDUIT 25Ø CONDUIT
Ø 1500 Ø 1500
A SECTION 4 3 1*
D SECTION
- - G SECTION
- J
-
SECTION *GROUND 25MMØ CONDUIT TO BE INDICATED AS TEP.
Ø 1200
Ø 1400
Ø 1500 Ø 1500
C SECTION
- F SECTION
- I SECTION L SECTION
- -
00
Ø14
00
Ø12
00 00
Ø12 Ø14
20-T25 VERTICAL BARS 22-T25 VERTICAL BARS
POLES
SCHEDULE OF CONDUITS
FOUNDATION ELECTRICAL COMMUNICATION GROUND
TYPE 75Ø CONDUIT 50Ø CONDUIT 25Ø CONDUIT
3, 4, 7 & 8 3 2 1*
5&6 2 2 1*
POLE COLUMN
BASE PLATE
2600
T10@175 c/c
STIRRUPS
2000
1000 VERTICAL BARS (AS PER SPECIFICATION)
1000
T12@150 (T&B)
1000
450
100
2600
E SECTION COMPACTED EARTH BLINDING CONCRETE
- T12@150 B/W
D SECTION
-
PLAN
NOTE:-
50
GL
a. 500MM LONG,250MM WIDE AND 50MM THICK.
300 b. ALL CABLE COVERING TILE SHALL HAVE
"MCC" INSCRIPTION IN ENGLISH, NOT LESS
THAN 25MM SIZE.
600
3. HDD:
M.C.C
600
1200
a. NUMBER OF 75 MM DIA DUCT FOR HDD TO BE
250
150
AS PER MCC REQUIREMENT.
4. WARNING TAPE:
50
e. Min.105Kg/cm² STRENGTH CROSSWISE
f. Min 350% ELONGATION FACTOR
SEE DETAIL-C g. ALL WARNING TAPES SHALL HAVE RED COLOR
SECTION-B-B ELECTRICAL CABLES & FIBER CABLES WITH
500 ``MCC" INSCRIPTION IN LARGE BLACK CAPITAL
LETTERS DISTANCED 1M AND PRINTED
ALTERNATELY IN ENGLISH AND ARABIC.THE
WARNING TAPES PLACED WITH THE
INSCRIPTIONS FACING UP.
h. REFER DRAWING NO.:-AB-TYP-S-208
250
15 220 15
35
EXIT POINT
ENTRY POINT
25
TOTAL HDD DESIGNED LENGTH
50
A
-
TRENCH LESS CONSTRUCTION 25
SECTION-A
PLAN DETAIL-C
COVER TILE
CHAMFER DETAILS
ENTRY/EXIT POINT SET BACK FROM TRIAL PIT SET BACK FROM TRIAL PIT ENTRY/EXIT POINT
TO THE ROAD EDGE TO THE ROAD EDGE
RIG/PIPE SIDE RIG/PIPE SIDE
CABLE COVER TILE
1800
1800
EXISTING ROAD EDGE
3000
A
-
5000 (MAX) 5000 (MAX)
SECTION-A-A
2022-02
COVER TILE, WARNING TAPE FOR MCC NETWORK AND HDD DETAILS (20 / 24)
Typical Drawing Ref.
Rev. Drawing No. Date
Z0 AB-TYP-S-209 20-Dec-22
MCC
MCC
GALVANIZED IRON PIPE
1000mm
LOGO
1000mm
MCC
100mm
WHITE
300mm
300
CONCRETE CONCRETE
300mm
30 m
0m
m 0m
30
DETAIL-A
MARKER POST
MCC
MCC
MCC
MCC
MCC
MCC
GROUND LEVEL
2000mm 2000mm
880
227 1200 600
3000
1240
FENCE
SVC (1240X1200X1720mm)
880
2000
PLAN
FENCE
2500
GROUND LEVEL
ELEVATION
800
Street Lighting Equipments METER (BASED ON SOIL FRICTION TYPE).
Access Hatch (150 X 200MM) 12.MENTIONED X,Y,Z TO BE AS PER THE STREET LIGHTING
AUTHORITY REQUIREMENTS.
Y
f.4. OR SLUMP TEMPERATURE - 0mm.
Y
400
Detail-X
4.5 X 0.9CM
800
800
320
X
X
600
600
700
ASSET LABEL
C
HYBRID POLE DETAILS Detail-X SECTION C-C
750
CONCRETE COVER (SEE NOTE 4) NOTES
400
300x100 OPENING FOR CABLE ENTRY 1.2 METERS).
MAX. 3600mm
SCALE NTS
192
25mmØ CONDUIT (EARTHING)
Y 11. PRIOR TO THE DISPATCH, THE CONCRETE EARTH
PIT HAS CHECKED UNDER THE SUPERVISION OF
75mmØ ELECTRICAL CONDUIT QUALITY CONTROLLERS.
146
150
Min.Ø100mm
NOTE:-
"X" and "Y" AS PER ADDC REQUIREMENT .
EARTH PIT
POWER CABINET FOUNDATION
X