Professional Documents
Culture Documents
Time
From 01-April-2020 to 30-April-2020
Span:
4 Progress Outline
4.1 Engineering
4.1.1 Drawing Submittals Status
79 79 314 314
7 Quality Control
7.1 Engineering
7.1.1 Design Shop Drawing Submittals & Approval Log
Submittal Return
S/N Drawing Ref: No. Drawing Title Revision Status Remarks
Date Date