Professional Documents
Culture Documents
1 GENERAL CCE-215-ENG-026-CV-DOC-001 STRUCTURAL DESIGN BASIS VTKN Cap Ex Up Gradation Project R0 APPROVED No action from
Contours
CCE-215-ENG-026-RC-002 TYPICAL RCC DETAIL OF FIRE HYDRANT PIPE SUPPORT (TYPE-D) & (TYPE- R0 APPROVED
G) No action from
2 PIPE SUPPORT Contours
CCE-215-ENG-026-CV-DOC-003 DESIGN CALCULATION OF FIRE HYDRANT PIPE SUPPORT (Type D) R0 APPROVED
CCE-215-ENG-026-CV-DOC-002 DESIGN CALCULATION OF FIRE HYDRANT PIPE SUPPORT (Type G) R0 APPROVED
CCE-215-ENG-026-RC-001 FOUNDATION & PEDESTAL LAYOUT & RCC DETAILS FOR NP2 SHED R1 APPROVED
NP2 SHED (SUB- CCE-215-ENG-026-RC-002 PLINTH BEAM LAYOUT & RCC DETAILS FOR NP2 SHED R1 APPROVED Planning to re-
3 STRUCTURE) submit the same
on 08.06.16
Status not known
CCE-215-ENG-026-CV-DOC-003 DESIGN CALCULATION FOR NP2 SHED (SUBSTRUCTURE-RCC) R1 to Contours
Submission
CCE-215-ENG-026-RC-007-SHT-1 LAYOUT OF GRADE & SKID FOUNDATION FOR NP2 SHED R0 pending from
Contours
Submission Planning to
5 SKID FDN FOR NP2 SHED CCE-215-ENG-026-RC-007-SHT-2 RCC DETAILS OF SKID FOUNDATION FOR NP2 SHED R0 pending from submit on 10-06-
Contours 16
Submission
CCE-215-ENG-026-CV-DOC-010 DESIGN CALCULATION FOR SKID FOUNDATION R0 pending from
Contours
CCE-215-ENG-026-RC-011-SHT-1 FOUNDATION & PEDESTAL LAYOUT FOR D.G. SET & CHIMNEY R0 APPROVED
CCE-215-ENG-026-RC-011-SHT-2 RCC DETAILS OF PEDESTAL & FOUNDATION FOR D.G. SET & CHIMNEY R0 APPROVED
9 DG-SET & CHIMNEY No action from
Status not known Contours
CCE-215-ENG-026-CV-DOC-007 DESIGN CALCULATION fOR DG SET & CHIMNEY FOUNDATION R0 to Contours