CENTRAL EXPRESSWAY PROJECT (CEP) SECTION 02 – FROM MIRIGAMA TO KURUNEGALA - PACKAGE A – FROM MIRIGAMA TO RILOLUWA (CH 37+090–CH 46+800)

DRAWING SHEET INDEX GENERAL NOTES

NO Drawing Title Drawing Number No of Sheets Remarks

Foundation Drawings

1 Abutment - A2 Capping Beam & Back Wall Reinforcement Details CEP-2 / PK-A / 43+770 / VD / A2 / SB / RF / 001 / R00 2

2 Abutment - A2 Capping Beam & Back Wall Bar Schedule CEP-2 / PK-A / 43+770 / VD / A2 / SB / BS / 001 / R00 2

3 Abutment - A2 Pile Cap Reinforcement Details CEP-2 / PK-A / 43+770 / VD / A2 / SB / RF / 001 / R00 1

4 Abutment - A2 Pile Cap Reinforcemen Bar Schedule CEP-2 / PK-A / 43+770 / BR / A2 / SB / BS / 001 / R00 1

5 Abutment - A2 Stem Reinforcement Details CEP-2 / PK-A / 43+770 / VD / A2 / SB / RF / 001 / R00 2

6 Abutment - A2 Stem Reinforcement Details Bar Schedule CEP-2 / PK-A / 43+770 / VD / A2 / SB / BS / 001 / R00 1

7 Abutment - A2 Left Wing Wall Reinforcement Details CEP-2 / PK-A / 43+770 / VD / A2 / SB / RF / 002 / R00 2

8 Abutment - A2 Left Wing Wall Bar Schedule CEP-2 / PK-A / 43+770 / VD / A2 / SB / BS / 002 / R00 1

7 Abutment - A2 Right Wing Wall Reinforcement Details CEP-2 / PK-A / 43+770 / VD / A2 / SB / RF / 003 / R00 2

8 Abutment - A2 Right Wing Wall Bar Schedule CEP-2 / PK-A / 43+770 / BR / A2 / SB / BS / 003 / R00 1

Submitted : ……………………………….. ………………………………


………………………………..
Name Signature Date
(Contractor's Representative (CR))
CENTRAL EXPRESSWAY PROJECT (CEP) SECTION 02 – FROM MIRIGAMA TO KURUNEGALA - PACKAGE A – FROM MIRIGAMA TO
RILOLUWA (CH 37+090–CH 46+800)

DRAWING SHEET INDEX


NO Drawing Title Drawing Number No of Sheets Remarks

Foundation Drawings
Done (Element size not
1 Abutment A1L & A1R Pile Layout CEP-2 / PK-A / 42+240.082 / BR/ A1 / FD / GA / 001 / R00 1 finalize)
General Arrangement -Profile
2 CEP-2 / PK-A / 42+240.082 / BR/ A1 / FD / GA / 002 / R00 1 Done
.Abutement A1
Left Abutement Pile Cap Concrete
3 CEP-2 / PK-A / 42+240.082 / BR/ A1 / FD / CO / 001 / R00 1 not Done
OutLine
Right Abutement Pile Cap Concrete
4 CEP-2 / PK-A / 42+240.082 / BR/ A1 / FD / CO / 002 / R01 1 not Done
OutLine
Abutement Pile Reinforcement Done (Element size not
5 CEP-2 / PK-A / 42+240.082 / BR/ A1 / FD / RF / 001 / R00 1
Details finalize)

Sub Structrure Drawings


Done (Element size not
6 Abutment Concete out line CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 001 / R00 2 finalize)
Done (Element size not
7 Left Abutment Right wing wall CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 002 / R00 1 finalize
8 Left Abutment Left wing wall CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 003 / R00 1 not Done

9 Right Abutment Right wing wall CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 004 / R00 1 not Done

9 Right Abutment Left wing wall CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 005/ R00 1 not Done
Done (Element size not
10 Abutment Approache Slab CEP-2 / PK-A / 42+240.082 / BR/ SB / A1 / C0/ 006 / R00 1 finalize)