DESIGN BASIS FOR


OCT/UNIT 02

A1 09 JUN ‘08 FINAL ISSUE L.F. G.C. A.C.


A0 17 APR ‘08 IFA L.F. G.C. A.C.
REV. DATE DESCRIPTION PREPARED CHECKED APPROVED
B AGCR JV
316800 / 02-ZA-E-02004009 REF. No.:3034-PR-DBS-AA014 (A1)
Snamprogetti
PROJECT:
Bina
BANDAR ABBAS GAS CONDENSATE PAGE 2 OF 2
Golden Group
Consulting
Engineers
EP GmbH
REFINERY

For the Process Design Basis For Octanizer Unit (OCT) – Reaction section (Unit 02), refer to the
Axens Process Books Doc.No 02/EB-PR/PRO-OO-0051-0, Paragraph 1.1.1 with the following
exception:

Axens Paragraph 1.1.1.4: Battery limit conditions

Operating Operating
Fluid Origin or Destination pressure temperature
o
(bar g) ( C)
Outgoing
Reformate Storage 6.2 40
LPG LPG Recovery Unit 19.5 40

Axens Paragraph 1.1.1.5: “Utilities conditions and site information”

Refer to the document 3034-00-ED-PM-DBS-AA002 (contractor number 00-ZA-E-00009002) - Basic


Engineering Design Data.