Professional Documents
Culture Documents
Heavy Crude Oil Refinery Project
Hormozan
Energy Industry
BASIC ENGINEERING DESIGN BASIS FOR SWS
Development
Company
DOCUMENT NUMBER
PRJ PHASE UNIT DISC. TYPE SEQ. REV. Project No.: 92/PBQ/BE/003
Project No.: 1009
PBQR EB 08 PR DBS 0001 00 Page 1 of 10
5
4
3
2
1
0 20th May. 2014 Issued for Approval P.N.V. A.FA. H.GH.
Rev. Date Description Prepared Checked Approved
THIS DOCUMENT IS THE PROPERTY OF PARS BEHIN PALAYESHE NAFTE QESHM COMPANY. IT IS CONFIDENTIAL AND ALL RIGHTS RESERVED TO THE OWNER. NEITHER WHOLE
NOR ANY PART OF THIS DOCUMENT MAY BE DISCLOSED TO ANY THIRD PARTY, REPRODUCED, STORED IN ANY RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY
ANY MEANS WITHOUT THE PRIOR WRITTEN CONSENT OF PARS BEHIN PALAYESHE NAFTE QESHM COMPANY.
Qeshm Heavy Crude Oil Refinery Project
Hormozan
Energy Industry
BASIC ENGINEERING DESIGN BASIS FOR SWS
Development
Company
DOCUMENT NUMBER
PRJ PHASE UNIT DISC. TYPE SEQ. REV. Project No.: 92/PBQ/BE/003
Project No.: 1009
PBQR EB 08 PR DBS 0001 00 Page 2 of 10
No. Rev.0 Rev.1 Rev.2 Rev.3 Rev.4 No. Rev.0 Rev.1 Rev.2 Rev.3 Rev.4
1 X 26
2 X 27
3 X 28
4 X 29
5 X 30
6 X 31
7 X 32
8 X 33
9 X 34
10 X 35
11 36
12 37
13 38
14 39
15 40
16 41
17 42
18 43
19 44
20 45
21 46
22 47
23 48
24 49
25 50
Notes:
1. INTRODUCTION
One Sour Water Stripping Unit (SWS) shall be considered for Qeshm Heavy
Crude Oil Refinery Project. SWS processing capacity has been considered as
16008 Kg/hr of sour water.
The Sour Water Stripper is dedicated to treat sour water from the Crude &
Vacuum Distillation Unit (CDU/VDU).
The feed sour water shall be treated to remove the H2S and NH3 to the desired
level before routing to the Crude & Vacuum Distillation Unit as process wash
water.
The on-stream hours shall be 7920 hours per annum based on a 330 operating
day scheme.
Qeshm Heavy Crude Oil Refinery Project
Hormozan
Energy Industry
BASIC ENGINEERING DESIGN BASIS FOR SWS
Development
Company
DOCUMENT NUMBER
PRJ PHASE UNIT DISC. TYPE SEQ. REV. Project No.: 92/PBQ/BE/003
Project No.: 1009
PBQR EB 08 PR DBS 0001 00 Page 5 of 10
The Sour Water Stripping Unit (SWS) shall be capable of operating at 60% of its
design capacity.
All equipment and lines shall be designed based on the Unit’s operating capacity
as described in 2.1 above, with due consideration to the requirements stipulated
in the Equipment and Line Sizing Design Criteria in “Project Specification for
Process and Mechanics Design Criteria”.
3. FEED CHARACTERISTICS
The continuous feed stream and its compositions as defined in Table below shall
constitute the feed to the Sour Water Stripping Unit.
COMPOSITION, PPMW
NH3 73
H2S 52
PHENOLS Nil
CYANIDE Nil
HYDROCARBONS 200
CO2 Nil
Qeshm Heavy Crude Oil Refinery Project
Hormozan
Energy Industry
BASIC ENGINEERING DESIGN BASIS FOR SWS
Development
Company
DOCUMENT NUMBER
PRJ PHASE UNIT DISC. TYPE SEQ. REV. Project No.: 92/PBQ/BE/003
Project No.: 1009
PBQR EB 08 PR DBS 0001 00 Page 6 of 10
Temperature, °C 50 85
4. PRODUCT SPECIFICATIONS
NH3< 23 ppmw
Acid gas quality shall be consistent with stripped water quality. The composition of
Acid Gas is presented in below table:
Acid Gas
Composition
Wt %
H2O 21.91
H2S 30.77
NH3 33.49
HC 13.83
HCN 0
H2 0
CO2 0
The battery limit conditions for the incoming and outgoing streams of SWS Unit
are as follows:
Press. Temp.
Incoming Streams Remark
bar(g) (°C)
Press. Temp.
Incoming Streams Remark
bar(g) (°C)
7. EFFLUENTS
A constant back pressure of 0.3 barg and a superimposed back pressure of 1.5
barg shall be maintained at the battery limit of the Unit for flare system. Flare
network mechanical design shall be 3.5 barg.
A constant back pressure of 0.1 barg and a superimposed back pressure of 0.5
barg shall be maintained at the battery limit of the Unit for flare system. For the
fire case, superimposed back pressure shall be 1.5 barg. Acid Gas flare network
mechanical design shall be 3.5 barg.
The NIOEC specifications along with IPS standards referred to therein shall be
applied for performance of the services. In case of silence of the said
specifications/standards in certain cases reputable international standards will be
applied.
The Sour Water Stripping unit shall be designed to meet all parameters
mentioned in product specifications at section no. 4.0 of this document. The
proposed SWS configuration shall comprise of feed surge drum, one day storage
tank, stripper column with pump-around and kettle type steam reboiler.
The collected sour water shall be routed to Feed Surge Drum by available
residual pressure. The Feed Surge Drum is a three phase separator where oil and
acid gas are separated from sour water. The acid gas shall be sent to Acid Gas
Flare after being mixed with stripper column overhead acid gas for further
processing. The oil removed from the drum shall be routed to OSW.
Qeshm Heavy Crude Oil Refinery Project
Hormozan
Energy Industry
BASIC ENGINEERING DESIGN BASIS FOR SWS
Development
Company
DOCUMENT NUMBER
PRJ PHASE UNIT DISC. TYPE SEQ. REV. Project No.: 92/PBQ/BE/003
Project No.: 1009
PBQR EB 08 PR DBS 0001 00 Page 10 of 10
A storage tank shall be provided with one day capacity to provide more
operational flexibility of uninterrupted operation of upstream process units or
draining of sour water to WWT during short shutdown. A floating oil skimming
facility shall also be provided in the tank for residual oil removal and skimmed oil
from this unit will be routed to OSW. Vent gas, if any, from the tank shall be routed
to safe area.
Stripper column shall be designed with 23 numbers of trays with kettle type steam
reboiler at the bottom. Pump around has been preferred over the overhead
condenser configuration due to less corrosion problems and cost effectiveness..
The stripped sour water with desired specifications shall be sent to CDU/VDU
after necessary heat recovery and cooling.
The facility is to be provided to bypass the day tank and sour water is directly
pumped to Sour Water Stripper Column.
The facility is to be provided to bypass the feed surge drum and sour water
is directly routed to the Day Tank.
A sour water blow down drum shall be provided for SWS unit. Drains from