2.0 PURPOSE
3.0 SCOPE
4.0 RESPONSIBILITIES
5.0 PROCEDURE
DOCUMENT HISTORY
REV. # DATE PAGE # SECTION DCR# NATURE OF AMENDMENT
* All changes made in the document are notified in the Document History. For details of amendments,
please refer to relevant DCR (Doc. Change Request).
CHEMICAL MANAGEMENT DEPARTMENT
1. PURPOSE
The purpose of this document is to provide instructions, determines pre-requisites, identifies
precautions, details the sequential steps and assigns responsibilities for operating the Sodium
Hypochlorite plant.
2. SCOPE
This procedure applies to the operation of sodium hypochlorite plant, determines pre-requisites,
identifies precautions details the sequential steps and assigns responsibilities for operating the
plant.
3. RESPONSIBILITIES
Plant Manager ensures that the proper procedures, as detailed below, are followed for
operating sodium hypochlorite plant.
It is the responsibility of Lead Chemist to ensure that all technical pre-requisites are
fulfilled prior to the starting for sodium hypochlorite plant. Overall responsibility for
correct operation lies with Operation Manager.
Ensuring that solution preparation is carried out correctly and according to procedure.
3.3. Assistant Chemist
Responsible for operating the plant as per instructions provided in this procedure and
also for proper solution preparation of chemicals.
3.4. Department heads
Maintenance Department Heads will manage to maintain the tanks pumps and other
equipment as per PM schedule.
4 PROCEDURE
PTW & LOTO has been cancelled and system is ready for startup.
Hypo plant MCC panel should be energized.
Hypo plant Rectifier should be energized.
All the breakers should be racked in and auto.
All pressures and temp must be normal.
All valves should be in normal position.
CHEMICAL MANAGEMENT DEPARTMENT
Before the start of the system the operation mode of plant should be cleared by the operator,
according to the process correct valve position/state should be made. The valve with salt
related system, cooling system, electrolytic system and dosing system should be in Open
position and pickling system valves should be in close position. In addition, all the valves before
the pressure gauge (pump outlet, the generator) should be open.
Open the thick salt water tank valve and inlet valve of dilute salt water tank.
Start clear water pump and then start Thick salt water pump.
When level of dilute salt water tank reached at 2.2 M then stop the clear water pump and
thick salt water pump.
Close valve of thick salt water tank and inlet valve of dilute salt water tank.
4.5 Shutdown
First of all, rotate the current knob counterclockwise to zero then turn off the Rectifier.
Stop the dilute salt water pump.
Before stop the air blower ensure H2 concentration should be less than 10 LEL.
close the brine tank inlet valve and open the Generator service water inlet flushing valve.
Open the elctrolyzer dump valve and make sure electrolzer is cleaned with service water.
Open the generator drain valve to drain the water from generator.
Close the Generator service water inlet and close the Generator dump valve.
Open the brine tank inlet valve.
Perform back washing of Heat exchanger after every shut down.
Open the heat exchanger brine solution side service water globe valve until water will come
clean from back flushing line.
Repeat same procedure with 2nd heat exchanger.
Open the generator Acid water inlet globe valve and outlet globe valve.
Close the generator outlet production and circulation hand valves.
Fill half acid Tank with service water.
Open the inlet and outlet isolation valve of acid water circulation pump.
Start the acid pump and circulate the water then stop the pump.
Prepared the 5 to 8% hydro chloric acid solution by adding HCL in Acid cleaning tank.
Start Acid mist absorber.
Open the globe valve of acid tank circulation line and close the main inlet valve of generator
then start pump to circulate for proper mixing.
close the globe valve of acid tank circulation line and open the main inlet valve of generator
to circulate the solution from generator to acid tank for one hour.
Stop the pump and drain the solution and add again fresh water to rinse the generator.