2nd STAGE DESALTER DRUM - V-5631
QA00D-249-SK-0422
MECHANICAL DATA SHEET
Revision: Istatus IFP
IDiscipline
1
Document Type : SK Isystem/ Subsystem : PVV Rev Date: 5/1/2010
Contractor document number P210-12-ME301 X-DAT-0422 PaQe: 1 of 4
0
TOTAL
HALUL CRUDE OIL
DESALTING PROJECT SEl'!nAT
INGENIERIE INOUSTRIELLE
(NOTE - REVISION-0 AND SUBSEQUENT IS ISSUED BY TECHNIP MIDDLE EAST AS REQUIRED BY TOTAL)
This document is the property of COMPANY It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
,� DESIGN DATA
Orientation Horizontal MATERIAL SPECIFICATION
2 Service Desalter Descrintion Material
3 Contents WATER, OIL AND SALT Shell cs
4 Shell Flange cs
5 Type Liquid Heads cs
6 ASME Sec.VIII DIV.1 2004 edition addenda Blind Cover NA
Design Code 2006 andGS EP PVV211
Plates cs
8 Support Lua pad cs
9 Code Stamp YE S 'U' Stamp Support Lugs cs
10 Temperature Nozzles neck cs
11 Design Min/ Max ·c -10 /84 Nozzles Flanges cs
12 0 Operating - Min/ Norm/ Max ·c -/52.1 /-- Internal attachments cs
13 Pressure External attachments cs
14 Design (Internal ) top of tank barg 15 Demister pad NA
15 1 Operating - Norm - top of tank barg 2 .5 We!rplate NA
16 Plate oack & coalescing vane pack NA
17 External Bolts SA193 GRB7
18 N"" SA194GR2H
19 Corrosion Allowance mm 3 Gaskets External (Pipe connections) GS EPPVV 147
20
21 1 Gross Capacitv m' 95 ( approx.) VTC Note-4 Gaskets Internal Non Asbestos
22 0 Vessel Dia (ID) mm 3050 Internal Bolts SA 193GRB7
mm
"�•c
23 1 Vessel Length (T/L TO T/L) 12000 Nuts SA 194GR2H
24 ShopHydrotestPressure As per code
25 ShopHvdrotest Temperature As per code welded fittings NA
26 Wind Code ASCE 7-95
27 Design Wind Speed mis QAOOD-249-SK-0402 Loose Internals NA
28 Seismic No FoundationBolting NA
29 Shell Thickness {NOM) mm mm GSEPPW211 Platform cleats,plpe support cleats & parts NA
30 Min.Head Thickness mm GS EPPW211 are not direcllv welded to pressure parts
31 Supporttvpe Saddle support CathodicProtection GSGR COR 101 (sacrificial anodes)
32 Weld Joint E f ficiencies:
33 Shell GS EP PVV211§5.1 CONSTRUCTION
34 Head GS EPPVV211§5.1 Type of Heads 2:1 ellinsoidal
35 Th!rdParty Inspection Yes Tvne of support SD EP PVV207
36 Stress relieved(PWHT) As per code Platform/Ladder/Pipe Clip Required
37 Non Destructive Testinn: Insulation supports NA
38 Radiography % As per code Manwav Davit Required / SD EP PVV216
39 Ultrasonic % As per Code E arthing Connection,lifting lugs,supports Required / SD EP PVV 224
40 Magnetic Particle % As per Code Uftina Luas/E ves/Trunlons Required
41 OvaPenetrant % Per Code/Spec Name plate SS316 L/ SDEPPW223
42 Post Weld Heat Treatment As per code
43 Material Impact Test Required As per code/spec andGS EP PVV211 ESTIMATED WEIGHTS
44 1 Insulation mm YES E mptv 51000 Kg By vendor
45 1 Fireproofing mm YES Shipping 52000 Kg By vendor
46 0 Pa!nting ( External) GS EP COR 350 Operating 185000 Kg Bv vendor
47 0 Palnllna ( Internal) GS EP COR 352 Glassllake)
( F!etdTest 215000 Kc 811 vendor
48 NOTES:
49 1 I Des alter drum shall be provided with insulation / Fire proof material
50 0 2 Deslnn of Internals and gurantee by vendor.
51 0 3 Des alter drum shall be complete wlth electrode grid & Insulators and all the headers.
52 1 4 Calculated volume for vessel of 3050 mm dia and 12000 mm TLto TL
53 0 VTC- Vendor to confirm
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Document number
2nd STAGE DESALTER DRUM - V-5631
QA00D-249-SK-0422
MECHANICAL DATA SHEET
Revision: 1 lstatus: IFP
Document T'"'e : SK Tsvstem / Subsvstem lrnsci line: PVV Rev Date 5/1/2010
Contractor document number: P210·12·ME301X-DAT-0422 Page: 3 of 4
'
Ma� Size Rating Q\u. Fianna Service Note
NPS Nos Tupe
2 1 N1 10" 150 1 WNRF Oil inlet
3 1 N2 4" 150 1 WNRF Closed drain header
4 1 N3 4" 150 1 WNRF Closed drain header
5 1 N4 4" 150 1 WNRF Closed drain header
6 1 NS 4" 150 1 WNRF Closed drain header
7 1 N6 4" 150 1 WNRF Oily water to exchanner
8 1 N7 4" 300 1 WNRF Stand pipe-2 bottom isolation - LT Control/ LG
9 1 NB 2" 300 1 WNRF Spare/ Utility connection
10 1 N9 4" 150 1 WNRF Stand pipe -2 top isolation - LT Control/ LG
11 1 N10 3" 150 1 WNRF Vent/ Purge
12 1 N11 10" 150 1 WNRF Oil outlet
13 1 N12 4" 300 1 WNRF Power cable (transformer connection)
14 1 N13 4' 300 1 WNRF Power cable (transformer connectlon)
15 1 N14 6" 150 1 WNRF SRV inlet
16 1 N15 4" 300 1 WNRF Stand pipe-1 top isolation - LT Control/ LG
17 1 N16 4" 300 1 WNAF Stand pipe -1 bottom lsolatlon - LT Control/ LG
18 1 N17 2" 150 1 WNRF Spare/ Utilihl connection
19 1 K1 2" 300 1 WNRF Vessel temperature gauge
20 1 K2 2' 300 1 WNAF Vessel temperature transmitter
21 1 K3 2' 300 1 WNRF Vessel pressure gauge
22 1 K4 2" 300 1 WNRF Vessel pressure transmitters HHILL
23 1 K5 2" 300 1 WNAF Vessel pressure transmltters HIL
24 1 K6A 2" 300 1 WNRF Level transmitter top isolation
25 1 K6B 2" 300 1 WNRF Level transmitter bottom Isolation
26 1 MW1 /MW2 24" 150 2 WNAF Man ways
27
28
29
30
31
32
33
34
'
35 NOTES:
'
36 �
37 ,_
1- VTA:VendorToAdvlse
38
39
40
I-
41
I-
42
I-
43 I-
44 �
45 �
46 �
'
47 �
4B �
49 �
50
1'
52
I-
53
I-
54 I-
55 �
56 �
'
57 �
'
58 �
59 �
60
61
62
I-
63
I-
64 I-
65 �
66 �
67 �
68 �
69
70
2nd STAGE DESALTER DRUM- V-5631 Document number
QA00D-249-SK-0422
MECHANICAL DATA SHEET
Revision: 1 lstatus: IFP
Document T•me : SKlsustem/ Subs=tem : lrnscinline: PVV Rev Date: 51112010
Contractor document number: P210·12·ME301X·DAT-0422 Page: 4 of 4
7
8
9
10
11
e 888 e
12
0 'r
0 0 800
T T T T T
13
14
15
16 T T T T T
wl
17
It
18 MW1 MW 2
19 C
o----ja
20
C>-i (::) V-5631 0 NOTES
G:)---o
21
E)µ T
0
.l
22
�
0
23
24
.L .L .L .L .L
00 0 00 0 0
25
26
27
28
29
30 12000
31
32 (Rev-I)
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
1
52
53
54 Notes
55
5 6 1- Vortex breaker as SD EP PVV 2 21
5 7 2 . Nozzle sizes are to be con!inned by the vendor. (R-1)
58 3 . Electrostatic desalter internal details are to be provided/ developed by the vendor. (R-1 )
59
60
61
62
63
64
65
66
67
68
69
70