OILY WASTE WATER
PTOW-2604
250 m3
DOC # 1910502-500-001
*
P-2604A/B VS4
# 1910502-300-2600-003
G-1910502-MEC-DS-
1 Note.3
REE WASTE WATER
PTWW-2601
250 m3
DOC # 1910502-500-001
*
P-2601 A/B VS4
# 1910502-300-2600-003
G-1910502-MEC-DS-
ZONTAL CENTRIFUGAL
P-2605 A/B
API 610
10 m3/hr
R PUMP DATA SHEET bar
3 KW
G-1910502-MEC-DS-
TECHNICAL DATA SHEET
64 NOTES Items marked with (*) shall be fill by the Vendor / Contractor. VTA- VENDOR TO ADVISE
65 1 Clarifier type and method for removal of solids shall be finalized during detail engineering. Vendor recommendation shall be considered during selection of clarifier.
66 2 Instrumentation shall be in line with the P&ID. Package P&Id to be prepared by the Vendor and shall be submitted for review and approval.
67 3 Coagulant / Flocculant type shall be selected during detail engineering based on type of clarifier and vendor recommendations.
68 4 Quantity and type of dosing tanks and dosing pumps shall be finalized during detail engineering.
69 5 Every equipment included in the package shall be tested at Vendor's facility and later at Site under supplier supervision. Material test certificates, weld record, NDT reports shall be submitted for all equipment.
70
71
72
73
74
75
76
Sheet No
2 of 3
MA IB
MA IB
Checked Approved
TANK 3
*
*
*
*
*
*
PUMP
3*
*
*
*
*
*
*
*
CRITERIA
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
Approved Test
Procedures
µm
µm
µm
SEAWORTH PACKING
mm
mm
mm
mm
ISE
hall be submitted for all equipment.
TECHNICAL DATA SHEET
WASTE WATER / OILY WATER TREATMENT PACKAGE
Client Consultant AZIKEL PETROLEUM LIMITED Document No.
Project MUC OIL & GAS ENGINEERING CONSULTANCY MUCOG-1910502-MEC-DS-055
AZIKEL PETROLEUM LIMITED 12,000 BPSD REFINING COMPLEX Issued for Tender NV
0
10/11/2019
Job No. 1910502 A 15/10/2019 Issued for Client Review NV
1 Rev Date Description Prepared
2 ANALYZERS 77 BRIEF LAYOUT
78
CLARIFICATION C
20 DATA SHEET NEUTRALIZATION BASIN x
9
NEUTRALIZATION PH ADJUSTMENT P
21 DATA SHEET DOSING TANK x
6
I
22 DATA SHEET DOSING PUMP x
)
23 INSTRUMENT DATA SHEET x
24 ELECTRICAL EQUIPMENT DATA SHEET x
25 LOAD SCHEDULE x
26 SINGLE LINE DIAGRAM x
27 CAUSE EFFECT MATRIX x
28 CONTROL PANEL DETAILS x
29 PIPING & INSTRUMENTATION DWGS x
30 PROCESS FLOW DIAGRAMS x
31 PROCESS CALCULATION x
32 CHEMICALS MSDS x
33 INSPECTION & TEST PROCEDURE x
34 QUALITY CONTROL PLAN x
35 CAUSE & EFFECT MATRIX x
36 CONTROL PANEL DETAILS x
37 FOUNDATION DETAILS x
38 SHIPPING INFORMATION x
39 ITP REPORTS x
40 MATERIAL TEST CERTIFICATES x
9
41 MANUFACTURING BOOK x
3
42 INSTALLATION & COMMISSIONING x
43 OPERATION, MAINTENANCE x
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
9
4
9
61 GENERAL NOTES 7
9
8
62 1 Deleted. 9
63 2 Details from the Technical specification shall be compiled. 9
1
64 3 Paint specification proposed shall be suitable for marine and process plant environmental conditions.
0
65 4 IP rating for electrical & instrument items installed outdoor shall be ip 66. 0
66 5 Pipe line or tubes used for chemical dosing shall be metallic / polymer and shall be properly secured. 1
67 6 Packages shall be interfaced with esd hardwire to control system. 0
1
68 7 Final Effluent Sampling & Analyzer Station (2 Nos.) shall be considered as part of waste water treatment package:- 1
69 a. The final effluent online sampling and analyzer system shall be provided as part of the Waster Water Treatment Package for0 continuous monitoring of water quality and controlling the processes.
70 b. Automatic sampling systems shall obtaining water samples from the waste water treatment package, by means of installation 2
of a line from the tank, basin, pipe or vessel and by means of sampling pumps as per
requirement. 1
71 c. All the necessary instrumentation, automation, sampling and analyzers assembly (with shelter if necessary), control valves, shut-off
0
9 valves, gauges, junction box, cabling shall be provided inline with project
requirements 3
5
1
0
4
1
0
5
1
0
72 and area of installation meeting hazardous area and ingress protection requirements. Type of analyzers shall be advised by Vendor.
73 d. Analyzer sampling system shall meet the requirements of international standards and local environmental regulations.
74 e. The system shall be interfaced with the WWTP package and shall be integral part of this package. Necessary interface to WWTP control system through hardwired and redundant Modbus shall be considered as
75 required.
Analyzer system shall also be interfaced to OSBL DCS through redundant Modbus communication for status monitoring. Hardwired signals for fault and alarm to be provided.
76
77
TECHNICAL DATA SHEET
ER / OILY WATER TREATMENT PACKAGE
Sheet No
3 of 3
MA IB
MA IB
Checked Approved
ATION
PH ADJUSTMENT