You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

152 H
PIC 152 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0160 L PV
152-TK-031 152 0160 D-000-1225-0026V.
152 LI 2" 4"
LI 4"-FLG-152-3313-A1GP-NI
0562L 0562 1. LEVEL TRANSMITTER IS TO BE RADAR TYPE AND ASSOCIATE
OFFSPEC PROPANE / BUTANE STORAGE TANK TGS 152 152 FC FREE DRAINING TEMPERATURE PROBE TO BE MULTI POINT PROVIDING AVERAGING
A NOTE 1,6,9 UZ PT
0160 3/4"
2" SP09 3/4" SIGNAL AND SPOT SIGNALS. A
CODE ASME SEC. VIII DIV.2 0031
NOTE 12 2" 2. DELETED.
TYPE SPHERES HH
152 H 152 H 18"-FLG-152-3314-A1GP-NI FLG 3. SIS FROM LOCAL CLOSE HAND SWITCH.
SIZE: I.D 15750mm LT PT
0562 L 0562 SIZE : 6Q8 SIZE : 6Q8 FREE DRAINING 4. DELETED.
WORKING CAPACITY 1737 LL L PSET : 1.71MPa(g)
RD NOTE 7, 12 PSET : 1.71MPa(g)
DESIGN PRESSURE 1.71MPa(g) 5. INTERLOCKED ISOLATION VALVES.
HH 152

2"-P-152-3339-A1GP-NI
152 152
LZT PSV LOTO PSV 18"-FLG-152-3315-A1GP-NI 6. COMMUNICATION PROTOCOL.
DESIGN TEMPERATURE 0084 0093A 0093B LOTO
LL LO LO
INSULATION TYPE NI RD 7. FOR PRESSURE COMPENSATION.
TRIM SPECIFICATION A1GP / B1GP 152 H 8. DELETED.
3/4" 18"x8" 18"x8"
B TT
0562 3/4" 9. TANK SIDE INDICATOR FOR MONITORING AND DISPLAY SHALL BE
B
10"x6" 3/4"
3/4" 10"x6"
3/4" LOCATED AT GRADE LEVEL.
4" FB 3/4"
2"
SP07 10. THE VESSEL SIDE OF THE VALVE IS WELDED TO THE PIPE WORK AND
MW 24" NOTE 5
LO LC NOTE 5 THE PIPE WORK (MINIMUM LENGTH) IS WELDED TO THE VESSEL.
SP08
LO THE OTHER SIDE OF VALVE TO BE WELDED TO FLANGE.
10"-P-152-3340-A1GP-NI 11. DELETED.
10"-P-152-3341-A1GP-NI 2"-P-152-3342-A1GP-NI 12. THE PRESSURE TAPPINGS SHALL BE TAKEN AS NEAR AS POSSIBLE TO
THE SPHERE.
13. DELETED.
C 14. DELETED.
C
15. DELETED.
16. THERMAL RELIEF VALVE.

STILLING WELL
THERMO WELL

STILLING WELL
17. DELETED.

D D
152-TK-031

24" MW

4000mm
GRADE
E E
BUND SIZE: NOTE 16 NOTE 10
NOTE 3 PSET : 1.869MPa(g) 1"-FLG-152-3310-A1GP-NI 152
152 152 UZV
HZS LO 0080
PSV FB C
0079 0145 FLG 152 152
152 TSO UZ HZS
UZV 3/4" FC 0031 0080
0079
C NOTE 10 3/4" RS NOTE 3
152
UZ TSO LO
F 0031 FC FB SP05
3/4"-P-152-3308-A1GP-NI 16"-P-152-3323-A1GP-NI F
1"
SIZE: 3/4D1 NOTE 16
PSET:4.609MPa(g)
A1GP B1GP 152
PSV 3/4" 3/4" 3/4" 3/4"
SIZE: 3/4D1 NOTE 16 0147 3/4" 3/4" 3/4" SP06
PSET:4.891MPa(g) FLG 1"-FLG-152-3307-A1GP-NI 3/4" 4"-P-152-3345 16"-P-152-3343 16"-P-152-3344
RS
152 LO RS -A1GP-NI RS -A1GP-NI RS -A1GP-NI
PSV B1AP A1AP 3/4"
FB 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" FEED DWG.No.
0099
G LO FLG LO
G
1"-FLG-152-3705-A1AP-NI

6"-P-152-3322-B1GP-NI
FB
SP04
FB A1GP A1GP A1GP
3/4" 3/4"-P-152-3306-B1GP-NI A1AP A1AP A1AP INALK.BUTANE
3/4" 16"-P-152-3332-A1AP-NI
152-0049G
DWG.No. Title
TO 070-P-032A/B
LO 152-P-014A/B,015A/B REFERENCE DRAWINGS
FB 2"-P-152-3350-B1AP-NI 5 14/APR/17 AS BUILT Y.I.L J.J.C Y.S.K
LOTO 2"-P-152-3349-B1AP-NI SAT.BUTANE 4 28/FEB/17 AS BUILT Y.I.L J.J.C Y.S.K
16"-P-152-3330-A1AP-NI
OFFSPEC PROPANE/BUTANE 152-0049G 3 14/DEC/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K
6"-P-152-3335-B1GP-NI
152-0032G TO 070-P-032A/B 2 17/APR/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K
3/4" 3/4" 3/4" 3/4" 3/4" Temporary hose to connect to
152-P-014A/B,015A/B 152-P-017A/B
H FROM UNIT 011
3/4" 3/4" 3/4"
Nitrogen supply C4 INTERTANK TRANSFER
1 13/OCT/14 ISSUED FOR CONSTRUCTION Y.I.L J.K.S Y.S.K H
4"-P-152-3334-A1AP-NI Rev Date Description Prep'd Chk'd App'd
SP01 152-0049G REVISIONS
3/4" 3/4" 3/4" 3/4"
4"-P-152-3347-B1GP-NI SP02 3"-P-152-3348-B1GP-NI 4"-P-152-3346-B1GP-NI TO 152-P-015A/B
Operation Centre JOB Code: 09105I
C3 INTERTANK TRANSFER
4"-P-152-3325-A1GP-NI Operation Centre DWG.No.:
B1GP B1GP B1GP 152-0049G
3"-P-152-3310-B1GP-NI

3"-P-152-3312-B1GP-NI

3/4" 3/4" 3/4" 3/4" 3/4" Contractor JOB Code Responsible Company
B1AP B1AP B1AP TO 152-P-013 A/B
SAT.PROPANE 0-6495-20 GS
3/4" 16"-P-152-3327-A1GP-NI
152-0049G Prepared by Checked by Approved by
4"-P-152-3318-B1AP-NI

3/4" 3/4" 3/4" 3/4" 3/4" 3/4" TO 070-P-031A/B Y.I.LEE J.J.CHA Y.S.KIM
152-P-012A/B,013A/B, 152-P-016A/B
RFCC.PROPANE
16"-P-152-3326-A1GP-NI
I 152-0049G I
LO LO B1GP 4"-P-152-3316-B1AP-NI TO 152-P-012A/B, 013A/B,016A/B

B1AP C4 INTERTANK TRANSFER

SAT.PROPANE
3"-P-152-3320-B1AP-NI 3"-P-152-3320-B1AP-NI
MIN FLOW LINE
152-0049G
FROM 152-P-015 A/B
NSRP
3"-P-152-3310-B1GP-NI 2"-P-152-4409-B1AP-NI Complex Project
152-0032G 152-0037G Nghi Son Refinery and Petrochemical
FROM UNIT 011 FROM 152-P-017A/B Limited Liability Company
IN.ALK BUTANE Nghi Son, Vietnam
4"-P-152-3810-B1AP-NI 4"-P-152-3739-B1AP-NI
152-0038G 152-0037G
Drawing Title
TO 152-TK-034 FROM 023 UNIT
SAT.BUTANE/BUTANE IMPORT
D-152-1225-0033G

J 3/4"
4"-P-152-3730-B1AP-NI
152-0037G PIPING AND INSTRUMENTATION DIAGRAM J
RFCC.PROPANE MIN FLOW LINE FROM 011 UNIT/
3"-P-152-3312-B1GP-NI 2"-P-152-4424-B1AP-NI UNIT 152
152-0032G LO 152-0037G TO 152-TK-032/033
FROM UNIT 023 FROM 152-P-017A/B
MIN FLOW LINE INTER UNIT STORAGE
2"-P-152-4314-B1GP-NI
152-0032G
FROM 152-P-016 A/B PROPANE STORAGE TANK 2

3/4"-P-152-3727-B1AP-NI 4"-P-152-3712-B1AP-NI C3 INTERTANK TRANSFER


LO 3"-P-152-3314-B1GP-NI Issue Purpose Document Class
152-0049G
BUTANE IMPORT FROM 152-P-013 A/B AS BUILT Z
4"-P-152-3711-B1AP-NI
K 152-0032G
4"-P-152-3238-B1AP-NI
Unit No. Unit Abbreviation PCWBS Size Scale K
FROM UNIT 154 152 XXXX C200 A1 NONE
MIN FLOW LINE
2"-P-152-4311-B1GP-NI
152-0032G Contractor DWG.No. Sheet Rev.
A1

FROM 152-P-016 A/B D-152-1225-0033G 001 OF 001 5

A 1 2 3 4 5 6 7 10 11 12 13 14 15 16
D R
IN R- 17
2 0 8 9
P NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14-A BUILT
A S 1/1

You might also like