Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 2 of 2
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTERS Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 744861-01Z-ME-420-0001
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
Process Conditions
1 Variable Units Case 1 Case 2 Source of Information
2 Operating Temperature °C 135 - 145 082176C-121-PDS-0814-0001_D1
4 Oil Properties
5 Fluid Type Crude Mix 082176C-121-PDS-0814-0001_D1
9 Cloud Point °C - -
14
15 Produced Water Properties
16 Inlet BS&W % 2.67 max (0.5 min) 082176C-121-PDS-0814-0001_D1
37
38
39
40
41
42
43
44
45
Schlumberger-Private
#
DOCUMENT: EQUIPMENT DATA SHEET
LOCATION: ASSAM
Schlumberger-Private
#
DATASHEET - ELECTROSTATIC TREATER
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 2 of 2
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
Size - Schd -
23 Water Collector Fixed Removable
Materials of Construction -
Type Size - Schd -
24 Dilution Water Header Fixed Removable
Materials of Construction -
25 Electrode Plates Type CARBON STEEL Fixed Removable
30 Internal Bolting & Clamps Materials of Construction STAINLESS STEEL Fixed Removable
31
32
33 NOTES
34 1. All Internals MOC are SS 410S as per client requirement.
35
Schlumberger-Private
#
DOCUMENT: PRESSURE VESSEL DATA SHEET
LOCATION: ASSAM
Schlumberger-Private
#
PRESSURE VESSEL DATASHEET - MECHANICAL
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 2 of 5
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
Vessel Quantity: Diameter: (in) Inside Diameter (ID) Seam-Seam (ft-in) Type:
3
2 144" Outside Diameter (OD) 72'-0" Vertical Horizontal
National Board Registration Reqd.: Other Registration: PWHT: Code Case: Overpressure Protection:
4 Yes Yes Per Code Yes Valve Rupture Disk
No No Process No Other
DESIGN CONDITIONS
5 Pressure & Temperature
6 Internal Design : 45 kg/cm2 g @ 165 °C
7 External Design (Vacuum): FV kg/cm2 a @ 165 °C
8 MAWP Internal: Same As Design Pressure Calculated By Fluid Density: (S.G.) 0.879
9 MAWP External: Same As Design Pressure Calculated by Design Liquid Level: Full NLL Other
MATERIALS
18 Component Specification Component Specification
19 Shell: SA-516 GR. 70 Head: SA-516 GR. 70 Type: 2:1 ELLIPTICAL
20 Nozzles: SA-106 Gr. B Flanges: SA-105 Facing: RF
21 Supports: SA-516 GR. 70 Pressure Retaining Bolts & Nuts: SA-193-GR.B7/SA-194-GR.2H Coat : FLUOROKOTE
22 Gaskets: FLEXITALLIC TYPE CG Internal Bolts & Nuts: STAINLESS STEEL
23 Int. Attachments: SA-516 GR. 70 Lifting Lugs SA-516 GR. 70
24 Stiffener Rings SA-516 GR. 70 Other External Attachments: SA-516 GR. 70
25 Repads SA-516 GR. 70 Other: Vessel Internals - SS 410S (Refer Treater Section)
26 Add. Mat. Rqmt: Yes No if yes per: Grid Carbon Steel
INSPECTION & TESTING
27 Hydrotest Criteria: UG-99 (b) Radiography: RT-1
28 PMI Required: Yes No if yes per: Other requirements beyond ASME Code Min: Yes No if yes per:
ADDITIONAL INFORMATION
29 Tolerance Cameron Customer
Schlumberger-Private
#
PRESSURE VESSEL DATASHEET - MECHANICAL
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 3 of 5
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
Schlumberger-Private
#
PRESSURE VESSEL DATASHEET - MECHANICAL
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 4 of 5
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
GENERAL NOTES
1 Shipping Dimensions & Weight: Length VTA Width VTA Height VTA Weight VTA
2 Additional Testing Requirements:
3 1.Minimum nominal thickness shall be 3/8 inch for carbon steel pressure vessels.
4 2.Weld-in internals shall have a minimum thickness of 1/8 in excluding corrosion allowance
5 3.Flanges greater than 24” shall comply with ASME B16.47 series B
6 4.Horizontal vessels shall have one (1) grounding lug installed on each saddle.
7 5.The minimum water temperature for hydro testing shall be at least 45°F (7°C) but not warmer than 120°F (50°C) and at least 30°f (17°C) warmer
8 than the minimum design metal temperature (MDMT). The minimum hold time shall be 30 minutes.
9 6.The contact angle between the saddle and vessel shall be a minimum of 120°. The minimum size of anchor bolts shall be ¾ in diameter. Bolt holes
10 shall be 1/8" larger in diameter than the bolts (1/4" larger in diameter for vessels if mounted on concrete).
11 7.Reinforcement pads, when required, shall have a minimum width of 2". Reinforcement pads on nozzles 10" diameter and smaller shall have
12 one (1) 1/4" NPT telltale hole; larger nozzle pads shall have two (2) 1/4" NPT telltale holes 180° apart.
13 8.Reinforcing pads and clips should be located a minimum of 2” from the edge of vessel’s longitudinal and circumferential seam welds. However when
14 unavoidable, seam weld shall be ground flush and 100% radiographed to a minimum of 6” beyond each side of attachment prior to covering joint
15 9.Vessel Shall be built per Cameron Specifications: CPS-03-7.3-008 Rev 00 (Pressure Vessel General Specification) and CPS-03-7.3-016 Rev 00
16 (Vessel Fabrication Details Specification)
17 10.Nozzle Outside projections to be per Cameron Specification: CPS-03-7.3-008 Rev 00 (Pressure Vessel General Specification)
18 11. All nozzle loads act at the vessel shell / nozzle intersection.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Schlumberger-Private
#
PRESSURE VESSEL DATASHEET - MECHANICAL
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 5 of 5
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
SKETCH
Schlumberger-Private
#
DOCUMENT: POWER UNIT DATA SHEET
LOCATION: ASSAM
Schlumberger-Private
#
DATASHEET - POWER UNIT
Data Sheet No.: 744861-01Z-ME-420-0001 Sheet 2 of 2
Customer: NUMALIGARH REFINERY LIMITED (NRL)
Project: NRL EXPANSION PROJECT
Equipment Name: BILECTRIC DESALTER Tag: 1P21-DE-0471 / 1P21-DE-0472
Valves & Process Systems Customer Reference No: 1P21-Z-0497 Cameron Ref. No: 680173
Rev. Date Description By Process Mech. Approved
A 22-Aug-15 Issued for Proposal PKM PKM IS US
POWER UNIT
1 GENERAL ACCESSORIES
2 TAG TBD Variable Load Tap Changer YES. FIVE POSITIONS
3 Service CONTINUOS Lifting Lugs INTEGRAL TO CAN
4 Transformer Quantity THREE (3) Name Plate YES / 316SS
5 Type BILECTRIC Ground Pad TWO / 316SS
6 Rating 100 KVA Temperature Gauge ONE
7 Phases 1 Oil Level Gauge TWO
8 Primary Voltage 415 VAC Pressure Relief Valve TWO / SET 2 PSIG
9 Primary Frequency 50 Hz Pressure Switch LID MOUNTED. SPDT
10 Output No 1 Temperature Switch LID MOUNTED. SPDT
11 Secondary Voltages 12, 16.5, 20, 23, 25 KV Low Oil Level Switch LID MOUNTED. DPDT
12 Reactance 100% Expansion Bellows