1. PURPOSE
The purpose of this document is to:
1.2 Define safe practices to handle the chemicals properly while using them.
2. SCOPE
This instruction covers the receiving and handling of chemicals used in solution
preparation at RO plant. This procedure is primarily applicable to Chemical Section of
Quaid e Azam thermal power plant, Bhikki.
3. RESPONSIBILITIES
Plant Manager ensures that proper solution preparation is carried out by the
Chemical Section according to OEM procedure.
Maintenance Department Heads will manage to maintain the tanks and pumps
as per PM schedule.
4. PROCEDURE
CHEMICAL MANAGEMENT DEPARTMENT
Wear all personal protective equipments (PPEs) like; Gloves, safety shoes, Face
shield, Gas mask, safety helmet with chin, Goggles, ear muff etc.
Open the filling valve of tank # 1 and ensure that filling valve of tank # 2 should
be in close position.
Insert transfer pump in cane of water and start the pump and ensure that pump
will take suction.
After adding water in tank # 1 then add HCl with same pump and make sure the
ratio of HCL and water should be 1:1 respectively.
After completion of work close the filling valve of tank # 1.
Same procedure will adopt with tank # 2 for preparation of solution.
Note: after completing acid dosing in tank rinse the pump and pipe with water.
Pump will dose HCL solution in suction line of feed water 1 st pass RO High
pressure pump.
If pH is greater than 7.1, than dosing of HCL solution is done to maintain the pH.
pH of 7 – 7.1 in feed water is to be maintained.
Open the filling valve of tank # 1 and ensure that filling valve of tank # 2 should
be in close position.
Insert transfer pump in cane of NAOH and start the pump and ensure that pump
will take suction.
After adding NAOH in tank # 1 then add water with same pump and make sure
the ratio of NAOH and water should be 1:1 respectively.
After completion of work close the filling valve of tank # 1.
Same procedure will adopt with tank # 2 for preparation of solution.
Dosing of NaOH solution to RO system
Pump will dose NaOH solution in feed water suction line of 2 nd pass RO High
pressure pump
If pH is less than 8 dosing of NaOH solution is done to maintain the pH.
pH of 8–8.1 in feed water is to be maintained.
Insert outlet of flexible pipe of transfer pump in dosing tank and insert pump in
Bactericide cane.
Start pump at normal speed and make sure pump will take suction.
After filling the bactericide, insert transfer pump in 25 lit Demin water cane for
flushing pipe line.
During flushing Pump will dose Bactericide in feed water suction line of 1 st pass
and 2nd pass RO for 10 minutes in every month.
5. RELATED DOCUMENTS
NA