Professional Documents
Culture Documents
DEPARTMENT: ENGINEERING
CONFIDENTIALITY: All the SOPs should be treated confidential and shall not be shown to unauthorized persons.
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. ENG/GEN-
004/01
1. OBJECTIVE
Internal cleaning of Water Reservoir
2. REASON
1. To provide an authorized documentation for the internal cleaning of Water Reservoir
2. To provide water to factory free from sand and other unwanted.
3. To avoided growth of bacteria.
4. To meet the requirement of drinking water.
4. SCOPE
1. Water Reservoir of the factory.
6. Drain connections
Date Date
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. ENG/GEN-
004/01
5. PROCEDURE
1 Take permission for Work General & Confined space.
2 Isolate the electric supply & display cautionary boards.
3 Drain the water from Water Reservoir.
4 Open the manhole of Water Reservoir.
5 Isolate blank inlet & outlet valves & display cautionary boards.
6 Arrange oxygen test with the help of oxygen meter.
7 Cleaning person first take bath and change overall before entering the Reservoir
8 Clean the Reservoir with fresh water only.
9 Clean with brush & flush with fresh water.
10 Refill the Reservoir with fresh water & drain, repeat this procedure a number of times (2
to 3).
11 Now refill the Reservoir again & connect all the circuits.
12 Restore the electric supply.
1 Clean the tank internally with the help of nylon / wire brushes (i.e ceiling , walls & floor)
6.8 Write the date of cleaning on specified place & endorse on note book.
7. PRECATION
7.1 Do not carryout any job before issue of permit to work “general” and “confined space”.
Date Date
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. ENG/GEN-
004/01
7.2 Let man hole remain open for 2 to 4 hours for maintaining O2, measure it with oxy meter
to confirm that it is not below 20%.
7.3 While cleaning a 2nd person must be present around main hole of water tank for safety
reasons.
7.4 Cleaning person must not stay in tank more than an hour continuously.
7.5 Switch of electrical system of chemical dozing pump.
8. VERSION HISTORY
Date Date
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. ENG/GEN-
004/01
Annexure “A”
Date Date
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. ENG/GEN-
004/01
Signed by: _________________________ _____________________________
Engineering supervisor Engineering Manager
Date Date