Standard Calibration Procedure

Doc. No. Call/SCP/016 Rev. 00 May 01, 2015


Vacuum Gauge / Vacuum Indicator

STANDARD CALIBRATION PROCEDURE

VACUUM GAUGE / VACUUM INDICATOR (DIGITAL)

Prepared by

Muhammad Ajlan Signature Date : 01.05.2015

Reviewed by

Muhammad Sarwar Signature Date : 01.05.2015

Approved by

Qaswar Mahmood Signature Date : 01.05.2015

Controlled Copy No. Uncontrolled Copy

Issued to :

Page 1 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/016 Rev. 00 May 01, 2015
Vacuum Gauge / Vacuum Indicator

This document is the property of Qstar Engineering, and is issued only for persons or entity as
written on this document. It is not to be retransmitted, printed or copied without prior written
permission of company.

Table of Contents

Sr. No. Title Page No(s).


1.0 Scope 03
2.0 Standard Equipment 03
3.0 Preliminary Operations 03
4.0 Calibration Procedure 03
5.0 Related Documents 03

Page 2 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/016 Rev. 00 May 01, 2015
Vacuum Gauge / Vacuum Indicator

1.0 Scope

This procedure provides guidelines for calibration of Vacuum Gauge / Vacuum Indicator
(Digital).

2.0 Standard Equipment

2.1 Low Pressure Calibrator with a valid certificate of calibration traceable to international
standard in accordance with an industrial code or a regulation shall be used as a
standard for calibration.
2.2 The reference standard shall be kept under controlled environmental conditions e.g. dust
free environment and Lab. temperature 22°C ± 3°C. Lab Humidity 60%RH ± 20%RH.

3.0 Preliminary Operations

3.1 The details of Vacuum Gauge / Vacuum Indicator (Digital) received for calibration shall
be entered in the Calibration Job Form (Form: Call/001).
3.2 It shall be ensured that the sensing port of Vacuum Gauge / Vacuum Indicator (Digital) is
not blocked.
3.3 The Vacuum Gauge / Vacuum Indicator (Digital) shall be inspected and marked () in
relevant block of equipment's primary inspection section of Calibration Data Sheet
(Form: Call/013).

4.0 Calibration Procedure

4.1 The Vacuum Gauge / Vacuum Indicator (Digital) to be calibrated shall be maintained at
same place of standard (Low Pressure Calibrator) for 06 hours minimum.
4.2 Vacuum Gauge / Vacuum Indicator (Digital) shall be exercised 2 to 3 times to full range.
4.3 Vacuum Gauge (Analog) shall be taped lightly while recording the readings to minimize
friction error.
4.4 The Vacuum Gauge / Vacuum Indicator (Digital) shall be checked at approximately 20%,
40%, 60% and 80% of full range.
4.5 The relevant section of Calibration Data Sheet (Form: Call/013) shall be marked.
Page 3 of 4
Standard Calibration Procedure
Doc. No. Call/SCP/016 Rev. 00 May 01, 2015
Vacuum Gauge / Vacuum Indicator

4.6 The readings of Vacuum Gauge / Vacuum Indicator (Digital) shall be recorded in
measured value column against the standard readings in set value column of Calibration
Data Sheet (Form: Call/013).
4.7 Calibration Certificate (Form: Call/002) shall be issued for calibrated Vacuum Gauge /
Vacuum Indicator (Digital) as per Calibration Data Sheet Record (Form: Call/013).
4.8 A Calibration Sticker (Form: Call/003) containing following information shall be affixed
on the calibrated Vacuum Gauge / Vacuum Indicator (Digital).
a) Item code
b) Calibrated on
c) Next calibration date

5.0 Related Documents

All the latest formats are documented in Master List of Document / Record and placed in CQF
file for reference.
All the latest Standard Calibration Procedures (SCP) are controlled and issued to concerned
Calibration Engineers.