Engineering Department :
Distribution list:
AM Engineering
AM Utility
Instrument Officer
AM Compliance
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Engineering
Completion
Sr.# Area/Document No. Findings Classification Action Plan/CAPA Responsibility Target Date
Date
SOP N0. ENG-MEC- Table of contents not Add table of
001/01 attached. contents. Mr. Abdul
1. Minor
Preventive maintenance of Form# not attached. Attach form#. Jabbar
encapsulation machine
SOP NO. ENG- MEC- Table of contents not Add table of
002/01 attached. contents. Mr. Abdul
2. Preventive maintenance of Minor
Form# not attached. Attach form#. Jabbar
Blister machine
SOP NO. ENG-MEC- Table of contents not Add table of
003/01 attached. contents. Mr. Abdul
3. Preventive maintenance of Minor
Form# not attached. Attach form#. Jabbar
stripping machine
SOP NO. ENG-MEC- Table of contents not Add table of
004/01 attached. contents. Mr. Abdul
4. Preventive maintenance of Minor
Form# not attached. Attach form#. Jabbar
Air Compressor ZT_30
SOP N0. ENG-MEC - Table of contents not Add table of
005/01 attached. contents. Mr. Abdul
5. Preventive Maintenance of Minor
Form# not attached. Attach form#. Jabbar
Pass Box with Conveyer
SOP NO. ENG- MEC - Table of contents not Add table of
006/01 attached. contents. Mr. Abdul
6. Preventive maintenance of Minor
Form# not attached. Attach form#. Jabbar
Roller compactor
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Engineering
Completion
Sr.# Area/Document No. Findings Classification Action Plan/CAPA Responsibility Target Date
Date
SOP NO. ENG-MEC - Table of contents not Add table of
007/01 attached. contents. Mr. Abdul
7. Preventive maintenance of Form# not attached. Minor Attach form#. Jabbar
ZPT-26 tablet press
machine
SOP NO. ENG-MEC - Table of contents not Add table of
008/01 attached. contents. Mr. Abdul
8. Minor
Preventive maintenance of Form# not attached. Attach form#. Jabbar
Tablet Coating machine
SOP NO. ENG-MEC - Table of contents not Add table of
008/01 attached. contents. Mr. Abdul
9. Preventive maintenance of Minor
Form# not attached. Attach form#. Jabbar
Tablet Coating machine
SOP N0. ENG-HVAC- Table of contents not Add table of
001/01 attached. contents. Mr. Amir
10. Minor
Operation and Maintenance Form# not attached. Attach form#. Ghauri
of Air Handling units
SOP N0. ENG-HVAC - Table of contents not Add table of
002/01 attached. contents.
Mr. Amir
11. Operation, inspection and Form# not attached. Minor Attach form#.
maintenance of Ghauri
Dehumidifier
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Engineering
Completion
Sr.# Area/Document No. Findings Classification Action Plan/CAPA Responsibility Target Date
Date
SOP N0. ENG-HVAC - Table of contents not Add table of
003/01 attached. contents.
Mr. Amir
12. Operation and Maintenance Form# not attached. Minor Attach form#.
of Absorption Ghauri
Chiller/Pumps
SOP N0. ENG-HVAC - Table of contents not Add table of
004/01 attached. contents. Mr. Amir
13. Operation and Maintenance Minor
Form# not attached. Attach form#. Ghauri
of Cooling Towers/Pumps
SOP N0. ENG-ELC-01/01 Table of contents not Add table of
Operation and preventive attached. contents. Mr. Jalil ur
14. maintenance of 750 KVA Minor
Form# not attached. Attach form#. Rehman
Generator
SOP NO. ENG-ELC- Table of contents not Add table of
002/01 attached. contents.
Mr. Jalil ur
15. Operation and preventive Form# not attached. Minor Attach form#.
maintenance of 350 KVA Rehman
Generator
SOP N0. ENG-ELC-003/01 Table of contents not Add table of
Mr. Jalil ur
16. Use of portable electrical attached. Minor contents.
equipment Rehman
Form# not attached. Attach form#.
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Engineering
Completion
Sr.# Area/Document No. Findings Classification Action Plan/CAPA Responsibility Target Date
Date
SOP N0. ENG-INST-01/03 Table of contents not Add table of
Mr. Farrukh
17. Calibration management attached. Minor contents.
Rafi
Form# not attached. Attach form#.
SOP NO. ENG-INST-02/03 Table of contents not Add table of
Calibration of digital attached. contents. Mr. Farrukh
18. temperature indicating Minor
Form# not attached. Attach form#. Rafi
controllers
SOP NO. ENG-INST-03/03 Table of contents not Add table of
Mr. Farrukh
19. Calibration of digital attached. Minor contents.
Rafi
temperature indicator Form# not attached. Attach form#.
SOP NO. ENG-INST-04/03 Table of contents not Add table of
Mr. Farrukh
20. Calibration of flow attached. Minor contents.
switches Rafi
Form# not attached. Attach form#.
SOP NO. ENG-INST-05/03 Table of contents not Add table of
Mr. Farrukh
21. Calibration of Humidity attached. Minor contents.
transmitter Rafi
Form# not attached. Attach form#.
SOP N0. ENG-INST-06/02 Table of contents not Add table of
Use of Standard attached. contents. Mr. Farrukh
22. Minor
Magnehelic Differential Form# not attached. Attach form#. Rafi
pressure Gauge
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Engineering
Completion
Sr.# Area/Document No. Findings Classification Action Plan/CAPA Responsibility Target Date
Date
SOP NO. ENG-INST-07/03 Table of contents not Add table of
Mr. Farrukh
23. Calibration of Magnehelic attached. Minor contents.
differential pressure gauges Rafi
Form# not attached. Attach form#.
SOP NO. ENG-INST-08/03 Table of contents not Add table of
Calibration of master attached. contents. Mr. Farrukh
24. instruments (outside Minor
Form# not attached. Attach form#. Rafi
source)
SOP NO. ENG-INST-09/03 Table of contents not Add table of
Mr. Farrukh
25. Calibration of pressure attached. Minor contents.
gauges Rafi
Form# not attached. Attach form#.
CSH Pharmaceuticals (Pvt.) Ltd. Lahore.
SOP No. QA-013/05
Team Signatures
Signature after
Sr.# Name Date Signature after completion Date
Finding
Department Manager
Sr. # Name: Signature After CAPA Proposal Date Signature After Completion Date
Muhammad Zubair
01
Haji