1. Objective:
This SOP is for Smooth Operation of Condenser Flood Test.
2. Scope:
This SOP is applicable for Condenser Flood Test.
3. Responsibility :
Unit Control Engineer, Field Engineer and Desk Engineer
4. Safety PPE’s:
Ear Plugs, Safety Goggles, Hand Gloves, etc.
7. Operating Procedure
If the condenser flood test is carried out for the limited purpose of
checking tube leaks, all the valves connected to condenser shell are to
be kept closed.
In rare cases, if the flood test is carried out for checking all the lines
connected to the condenser shell, then, ensure that all lines
8. Abbreviations / Notations
References
1. Turbine O & M manual
2. Catalogue of Turbine interlock & protection
3. Turbine P & I Drawing