You are on page 1of 7

STANDARD OPERATING PROCEDURE

Jaypee Nigrie Super Thermal Power Plant


2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 1 of 7
Revision Date:

Document Approval Sheet

Prepared by(PMPL) Reviewed by(PMPL) Reviewed by (Jaypee)

Name- Name- Name-

Signature- Signature-- Signature-

Designation- Designation- Designation-

Approved by (Jaypee)

Name Name-

Signature Signature

Designation Designation

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 2 of 7
Revision Date:

STANDARD OPERATING
PROCEDURE
FOR

ACW
SYSTEM

List of Contents

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 3 of 7
Revision Date:

1. Objective
2. Scope
3. Responsibility
4. Safety Ppe’s
5. Safety Precaution During operation
6. Brief Description of the System
7. Technical Data
8. Start Permissive
9. Starting procedure
10.Stop Procedure
11.Tripping Condition
12. Isolating procedure / Safety Aspects

13. Emergency Operation


14.Abbreviations / Notations

References

1. Objective:
This SOP is for Smooth Operation of ACW System.

2. Scope:
This SOP is applicable for ACW Systems.

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 4 of 7
Revision Date:

3. Responsibility :
Unit Control Engineer, Field Engineer and Desk Engineer

4. Safety PPE’s:
Ear Plugs, Safety Goggles, Hand Gloves, etc.

5. Safety Precaution During operation:


Ensure no permit to work is pending on regarding this system
by checking with.

6. Brief Description Of The System:

ACW PUMP: Auxiliary cooling water pumps supply cooling water at the
required flow rate and head for the cooling of DMCWTG side 3 Nos and
boiler side 2 Nos.

7. Technical Data:

1.0.1 ACW PUMP MAIN MOTOR


Make BHEL
Motor Type 3ɸ Induction Motor
KW 800 KW
F. L. Amps 186 Amps
Speed 743 RPM
Insulation Class F
Freq. 50 Hz
1.0.2 ACW PUMP
MAKE FLOWMORE
TYPE Vertical Type
Rated Capacity 4500 M3/hr
Speed 743 RPM
Stage 2 stage
Pump input 687.18 KW
Type of Lubrication Grease

8. Start Permissive:
a. Pump not tripped.

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 5 of 7
Revision Date:

b. MCC not disturbed.


c. Pump discharge valve close.
d. Pump suction valve open.
e. Pump suction pressure adequate 1kg/Cm2
f. Suction pressure switch healthy.
9. Starting Procedure:

Pre Startup:
a. Ensure no permit is pending on the system.
b. Power and control supply are healthy.
c. Ensure suction valve in open condition.
d. Ensure discharge valve in close condition.
e. Ensure power and control supply is healthy for discharge MOV
and it is in remote.
f. Ensure all protections are working.
g. Ensure temperature and vibration probes are fitted and are in
working condition.
h. Ensure local pressure and temperature gauges are fitted and are
in working condition.
i. Ensure minimum one PHE is in service for sufficient flow through
pump.
j. Ensure air venting of pump and other piping is done.
k. Ensure some equipment of boiler and TG side are charged..
l. Start one ACW pump.

Post Start:

a. Discharge MOV will get fully open in auto.


b. Check the discharge pressure, current, bearing temperature,
vibrations are normal.
c. Close all line and pump air vents
d. Check for any water leakages from the pump glands and ACW line.
e. Put standby interlock in service.

10. Stop Procedure:


a. Confirm the ACW is not required for cooling of any system.

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 6 of 7
Revision Date:

b.Release the standby interlock of the pump.


c.Check discharge valve in remote position.
d.Check power and control supply is healthy for discharge MOV.
e.Stop the ACW pump, check the discharge valve closed in auto or not
if not close it manually.
f. Check the pump is not rotating in reverse direction.
11. Tripping Condition:

Time
Description Value
Sr.# Delay
1 Discharge Valve Not Open & ACW Pump is ON   1 Min
1.2
ACW Pump is ON & Discharge Pressure LOW 15 Sec
2 Kg/Cm2
4.5
Discharge Pressure V. High 10 Sec
3 Kg/Cm2
4 Suction Pressure Low & Not Adequate 1 Kg/Cm2 10 Sec
5 ACW Pump Switchgear Trouble    
6 Suction Valve Closed Switch  

12. Isolating procedure / Safety Aspects:

Electrical Isolation:

a. Follow proper channel for isolation.


b. ACW pump breaker taken in local mode, DC supply OFF and main
breaker racked out and tag with PTW number and lockout.
c. ACW pump local push button pressed.

Mechanical Isolation:

a. All permit & standard isolation procedure will be followed.


b. Suction and discharge valve should be in close condition.

Note:
Refer breaker and module in power supply details.

13. Emergency Operation:


a. ACW Pump Bearing temperature Increasing:
1. Check oil level should normal and proper cooling is continue

Standard Operating Procedure


STANDARD OPERATING PROCEDURE
Jaypee Nigrie Super Thermal Power Plant
2 X 660 MW IPP
SOP FOR AUXILIARY COOLING WATER SYSTEM
Revision No.: 01
Document No.: PMPL/SOP/22 Effective Date: Page 7 of 7
Revision Date:

b. ACW Pump Bearing Vibration Increasing:


1. Check foundation of pump.
2. Check alignment of equipment.

14. Abbreviations / Notations

1. SOP: Standard Operating Procedure


2. UCE: Unit Control Engineer
3. DE: Desk Engineer
4. FE: Field Engineer
5. DCS: Distributed Control System
6. EE: Electrical Shift Engineer
7. MFT: Main Fuel Trip.
8. RB: Run Back

References: L&T MHI ACWP OEM Manual.