API FACILITY

CONCEPTUAL & BASIC DESIGN


DELIVERABLE LISTS
&
INITIAL EQUIPMENT LISTS

PROJECT TITLE

PEOPLE API PROJECT


Deliverable

# Issues
Priority

Seq #
CONCEPTUAL ENGINEERING DESIGN DELIVERABLES NOTES

Project Management
1 Schedule 1 List of deliverables against stage payments
2 +/-25 % Cost estimate 2
3 Basis of Estimate 2
4 Project Schedule including Basic Design and Ferring work. 3 Level 1
5 List of Applicable Codes and Standards (International, National and Local) 2
6 Proposed Procurement Strategy 2 Review of equipment and building materials lead times.
7 Proposed Bidders List 2
8 Deliverables List and Quotation for Basic Design 2 Review of current quotation and deliverables list.
Process
9 Cleaning Philosophy 2
10 URS development for facility 2 Update of Ferring Document
11 Containment Philosophy 2
12 Process flow diagrams 2ea Each train
13 Utility flow diagrams 2ea
14 Mass balance 2
15 Process description -Operating philosophy,batch schedules 2
16 Process typical PID (reactor, centrifuge, dryer,tank farm) 2 Review and updating of any P&IDs issued by Ferring
17 Clean utilities review
18 Major Equipment List with characteristic data's 3 Item/capacity/moc/utilities
19 Datasheets and technical specification development 3 Initial documents for high level pricing to be developed in BD
20 Layout Plot plan (2D drawing) 6 Max. number 6 Max. number
21 Personnel, materials, waste flow diagrams 2ea For each layout option
22 Layout plan with equipments positions (2D drawing) 6 Max number
Civil/ Structural/Archtectural
23 Requisition for site survey (by a third party) Data will be gathered from PPL concerning site conditions reports.
24 Requisition for ground conditions (by a third party)
Survey of existing Site To determine the availability of space/areas for the construction of the API plant, API tank farm, API offsites, Warehousing, new utilities, expanded existing utilities, OSD facility, site infrastructure
25 2 (administration,guard house, car parking, roads, security fencing). This will have to be compared against the permissible FSI (Floor Space index).Also covered will be access for construction, placement of
temporary (construction) security fencing and space/position for the construction offices/laydown etc.
Overall Site Utilisation Plan Showing the maximum permitted areas for development for each element of the proposed development. i.e. API plant,API tank farm, API offsites, Warehousing, new utilities, expanded existing utilities, OSD
26 2 facility and site infrastructure (administration, guard house, car parking, roads, security fencing). Data will also be gathered from PPL concerning permitting as required for planning, building and environmental
emissions.
27 Permitting Preparation of all required permits for submission by Ferring.Written description for FSI, permitting (as outlined above), telephone/data connections and external interfaces.
28 Preliminary building external elevations (2D drawing) 2
29 Building view 3
30 Preliminary scope of work
Utilities
31 Fluid list Design and Operating Parameters
Survey of existing black utilities Confirmation of the spare capacity of the existing utilities,namely, Chilled Water, Cooling Water, Compressed Air, Hot water, City Water, Plant Steam,Condensate, Waste Water Treatment (Process water and
32 2
Domestic sewerage). Also the availability of temporary utilities for construction purposes.
Tie-in report – detailing the tie-in points for all of the existing utilities as described above. Local site plan for the utilities area showing the proposed positions for new utility generation equipment. Written
33 2
description for the tie in installation schedule based on PPL’s advice.
Establish the Tie-In points for Chilled Water (supply and return), Cooling Water (supply and return), Compressed Air, Hot water (supply and return), City Water (new supply to site), Plant Steam, Condensate,
34 2 Waste Water Treatment (Process Water Sewer and Domestic Waste Sewer). Tie-in points will be located on the existing Piping layout drawings provided by Ferring. Establish where new utilities can be installed
covering Fire Water (Tank, Pumps, Retention Pond), Cooling Tower(s), Cooling Water Pumps, Cooling Water Treatment Package, Liquid Nitrogen and Chilled Glycol.
35 2 Establish PPL’s position and schedule for the installation of tie-in points to avoid interference with their production schedules.

36 2 Utility availability/gap analysis consisting of written descriptions and block flow drawings, as necessary, to describe existing and new utilities.
37 Preliminary scope of work 2
38
Building services (HVAC)
39 HVAC system design and control phylosophy 3
40 Area classification diagram 2
41 Pressure regime diagram 2
42 HVAC flow diagrams 2
43 Air venting unit preliminary sizing and layout (2D drawing) 2
44 Sanitary piping secifications 2
45 Drainage Philosophy 2
46 Preliminary scope of work 2
47 AHU datasheets 2
48
Electrical
Site survey and report Confirmation of the spare capacity of the existing Electrical Power Generation, Electrical Power Supply (including incoming power line(s), transformer and switchgear capacity).Also the availability of temporary
49 4
utilities for construction purposes
50 Establish the Tie-In points for HT Electrical (main incoming switchgear). Establish where new Emergency Power Generation can be installed.
51 Electrical Load List 2 Part of Equipment List
52 Electrical system design concept Description of electrical system, emergency supply UPS use. To include installation and safety concept.
53 General HV / LV single line diagram 2
54 Preliminary scope of work 2
55
56
Instruments and controls systems
57 Control system user requirements specification 2
58 Automation and control philosophy 2
59 Architecture of control sytem 2
60 IT infrastructure scope and review 3
61 Preliminary scope of work 2
62
Safety Health Environmental
63 Preliminary risk analysis 2
64 Hazardous area drawing 1
65 Fire strategy 1 Detection, Prevention, Alarms & Detectors.
66 Preliminary scope of work 2
67
68
Regulatory
69 cGMP review 1
70 Preliminary impact assessment 1
71

Workshops
72 Kick Meeting 1
73 Options Reduction/Seletion 1
74 Value Engineering 1
Deliverable

# Issues
Priority
Seq #
BASIC ENGINEERING DESIGN DELIVERABLES LIST NOTES

2 2 Project Management
Project Level 2 Schedule in MPP 2
+/-15 % Cost estimate
Basis of Estimate
Project Risk Assessment
Vendor and Sub-Contractor List
Deliverables List for Detailed Design

Process
PIDs Purification P&IDs for each process system
PIDs Synthesis P&IDs for each process system
Utility PIDs/UFDs
Compressed Air Generation
Compressed Air Distribution Initial - to be black boxed
Steam Generation Initial - to be black boxed
Steam and Condensate Distribution
Purified Water Generation Initial - to be black boxed
Purified Water Distribution
Potable Water Distribution
Hot Water Distribution
Chilled Water Distribution
Chilled Water Generation Initial - to be black boxed
Heating Water Generation Initial - to be black boxed
Heating Water Distribution
Liquid and Gaseous Nitrogen Distribution
Drains and Waste Water
Fire Water
Tankage
Environmental Impact Assessment and Permitting Strategy
Preliminary Air Dispersion Modelling
Environmental Emmissions Assessment
Equipment List Priced To include HVAC, electrical and utilities (clean and black) to be in MS
Access db.
Line List
Line Sizing Calculations
Utility Demands ( Purification & Synthesis) - final revision

Equipment
Process and Clean Utility Specifications See provisional equipment list
Equipment Specification: Black utilities See provisional equipment list
Equipment Specification - Tanks See provisional equipment list
Equipment Specification - Pumps and distribution See provisional equipment list

SYNTHESIS
Hazardous Area Classification Layouts and Principles
Process Flow Diagram
P&ID's (max 2 issues) Initial - to be black boxed
HAZOP studies
Mass Balance (if required)
Equipment Specifications - Vessels See provisional equipment list
Equipment Specifications - Reactors See provisional equipment list
Equipment Specifications - Pumps See provisional equipment list
Equipment Specifications - Minor Items (as necessary) See provisional equipment list
Equipment Specifications - Filter Presses See provisional equipment list
Equipment Specifications - Agitators See provisional equipment list
Equipment Specifications - Exchangers See provisional equipment list

PURIFICATION
Hazardous Area Classification Layouts and Principles
Process Flow Diagram
P&ID's (max 2 issues)
HAZOP studies
Mass Balance (if required)
Equipment Specifications - Packages See provisional equipment list
Equipment Specifications - Vessels See provisional equipment list
Equipment Specifications - Reactors See provisional equipment list
Equipment Specifications - Pumps See provisional equipment list
Equipment Specifications - Minor Items (as necessary) See provisional equipment list
Equipment Specifications - Filter Presses See provisional equipment list
Equipment Specifications - Agitators See provisional equipment list
Equipment Specifications - Exchangers See provisional equipment list

Equipment Requisitions Prepare for issuing for offers for all vessels, pumps and long lead
packaged equipment. Requisitions to be divided into groups: Acid
Resistant Vessels, Carbon Steel Pumps, Stainless Steel Pumps
Preliminary Quotations For +/- 15% cost
Equipment Material Specification For vessels, pumps and speciality items
Civil work/Building/Structure
Room datasheets
Building external elevations
Architectural specifications & typical details
Permitting (drawings and documents only)
Typical' drawings for civil works and building specifications (2D drawing)
Typical' drawings for buildings and building specifications (2D drawing)
Typical' drawings for structures and building specifications (2D drawing)
Scope of work
Permitting - building / environment statement
Scope of Work Description for subcontracts
3D Autocad drawings - Purification (pipe routes / building / equipment)
3D Autocad drawings - Synthesis (pipe routes /building / equipment)
Lab / Office / Warehouse Plan
Personnel, materials and waste flow diagrams - final issue
Preliminary Construction Temporary Facilities Layout
Building External Elevations
Outline Architectural Specifications (external)
Structural Philosophy
Steelwork GA's and elevations (inc platforms, relief panels) as necessary to
support the final estimate
Room List (inc numbers and names)
Room Finishes Schedule
Fire Strategy & Layout
Door Schedule Complete with interlocking philosophy

Piping
Piping material specifications
Line and valve list and MTO.
Insulation and painting specifications
Piping routing (main lines) (3D drawing)
Scope of work
Valve Specifications

Building services (HVAC)


HVAC PID
Equipment datasheets: AHU, Re-heat Coils, Filters
Functional design specification
HVAC Equipment layout (2D drawing)
Air duct routing (main lines) (3D drawing)
Duct List (with sizes, similar to line list) To show all supply and extract diffusers, lights, alarms etc.
Co-ordinated Reflected Ceiling Plan
HVAC AF&ID - System Normal Humidity ISO 8 Synthesis Module
HVAC AF&ID - System Low Humidity ISO 8 Synthesis Module
HVAC AF&ID - System Normal Humidity ISO 8 Purification Module
HVAC AF&ID - System NLow Humidity ISO 8 Purification Module
HVAC AF&ID - Tech Space
Air Extract AF&ID
Scope of Work Description for subcontracts
Area Classification Drawings (plant rooms)
Pressure Regime Drawings
Air System definition
Air Side Schematic Drawings
Specifications and Datasheets AHUs, fans, filter banks, unit heaters, reheat coils, dampers, ducting,
controls, and components
HVAC System Design and Control Specification (inc 8MS)
HVAC Equipment List Included in main equipment list: to include reheat coil list, dampers etc.

Specification for logic of HVAC function


Scope of work for installation and commissioning
Scope of work
Electrical
Trace heating specifications
Grounding network and lighting arrester system specifications
MCC room layout (2D drawing)
Reflected ceiling plan (combined with HVAC and equipment/utility drops)
Electrical cable tray routing (main raceway) (3D drawing)
Scope of work
Scope of Work Description for Electrical subcontracts
Single Line Diagram
Electrical Load List (included as part of Equipment List) Include diversity estimations and peak demands
Initial MCC Room and Panel Layout
Trace Heating Specification & Requirements
Hazardous Area Drawings (also see Process)
Reflected ceiling plan (lighting) - combined with HVAC and Equip / Utility Show all diffusers, lights, sounders, etc.
Drops as necessary for subcontracts
Major Electrical Equipment Specifications
Electrical specification for packaged plant Including VFD specification
Layouts of main cable trays
Specification for low and high voltage systems
Specification for MCC and Distribution Boards Including layout requirements
Specification for field testing of electrical installations
Emergency Shutdown Philosophy

Instrument and Control Systems


IO list
Typical instrument datasheet by family
Initial Functional Design Specification
Scope of Work
Instrument List For Packaged Equipment, HVAC, Clean and Black Utilities
Specification for IT network and Switch Panels
Specification for field testing of instruments and instrument installation
Specification for BMS
Scope of Work Description for quotation requests
Typical loop diagram

Health Safety and Environment


Environmental Impact Study
HSE Philosophy
Risk Analysis
Fire systems plan and specification (2D drawing) Provide initial detector and alarm layout
Escape routings
HSE Review and Report
Scope of work
Sustainability Review and Recommendations

Regulatory
Validation Master Plan
Impact Analysis
GMP Review

Workshops
Kick Off
PID review
Value Engineering
Layout Review
Constructability & Maintainability Review
Major Equipment New API Facility India
200T Purfication Line Major Equipment Data for Indian Facility Equipment Location Process
Prelim
Eq. No. Production Equipment Qty Unit Material
Size

02.A.Tra1 Big bag discharge system for Active Carbon 1 Building Purification
02.A.Tran1 Screw conveyor active Carbon 1 Building Purification
02.A.Ta1 Active carbon dissolving vessel 1 400 L ASIS 316L Building Purification
02.A.Omr1 Active carbon dissolving vessel agitator Building Purification
02.A.Ta* Active carbon Hold tank 1 Building Purification
01.B.Ta1 Caustic purification reactor 1 1.5 KL PEH Building Purification
01.B.Omr1 Caustic purification reactor agitator 1 Building Purification
01.B.Pu1 Caustic purification reactor pump Building Purification
01.B.Ta* Caustic (NaOH) Feed tank 1 Building Purification
01.C.EAS1 Filter press 1 100 L PP Building Purification
01.G.Ta2 Feeding tank Pyrosulfit 1 50 L PEH Building Purification
01.C.Fi1 Guard filter 1 Building Purification
01.C.Fi2 Guard filter 2 Building Purification
PP or glass
01.D.Ta1 Activated carbon purification reactor 1 8 KL lined Building Purification
01.D.omr1 Activated carbon purification reactor agitator Building Purification
DV2.Ror.W4 Purified water cooler Building Purification
01.D.Pu1 Activated carbon purification reactor pump Building Purification
01.D.Ta* HydroChloric Acid (HCl) Feed tank 1 Building Purification
01.E.EAS1 Carbon filter press 1 150 L PP Building Purification
PP or glass
01.F.Ta1 Precipitation Reactor 1 8 KL lined Building Purification
01.F.Omr1 Precipitation Reactor Agitator Building Purification
01.F.Omr2 Precipitation Reactor Agitator Building Purification
01.E.Fi1 Guard filter 1 Building Purification
01.E.Fi2 Guard filter 2 Building Purification
01.F.Pu2 CIP recirculation pump Building Purification
01.F.Pu2 Precipitation Reactor pump Building Purification
02.G.Ta1 Precipitation liquid vessel 1 5 KL AISI 316L Building Purification
02..G.Omr1 Precipitation liquid vessel agitator Building Purification
02.G.Ta2 Precipitation liquid vessel 1 5 KL AISI 316L Building Purification
02..G.Omr2 Precipitation liquid vessel agitator Building Purification
02.G.Pu2 Precipitation liquid feed pump Building Purification
02.G.Ta3 Pyrosufite disolution vessel 1 50 L PP Building Purification
02..G.Omr3 Pyrosufite disolution vessel agitator Building Purification
02.G.Pu2 Pyrosufite disolution vessel transfer pump Building Purification
Building Purification
02.H.Cen1 Centrifuge 1 1,5 m2 AISI 316L Building Purification
02H.Ta1 Airlock vessel Building Purification
02.H.PU2 Centrifuge liquid recirculation pump Building Purification
Precipitation Hold tank Building Purification
Centrifuge feed tank Building Purification
01.I.VACT1 Vacuum drier 1 800 L AISI 316L Building Purification
01.I.Omr1 Vacuum drier agitator Building Purification
Vacuum skid Building Purification
Heating cooling skid Building Purification
01.N.TVAC1 Delumper (Cone mill) 1 250 mm AISI 316L Building Purification
Powder transfer System (PTS) discharge & filter
01.N.FI1 housing 1 Building Purification
01.N.Mol1 Cone mill 1 Building Purification
01.N.Ta Powder collection drums -5/batch Building Purification
Utility Equipment (storage tanks each with 2
pumps) Qty Size Unit Material
DT1.Kdl2.Kdl1 Boilers - Steam 2 bar (200 kg/hr) + pumps 2 Building Utilities
Condensate Collection Vessel + pumps 1 Building Utilities
Dearator Vessel + pumps 1 Building Utilities
Chemical Dosing package 1 Building Utilities
Water Softeners 2 Building Utilities
Hot water package Heat exchanger, Vessel and
Pumps 1 Building Utilities
Boiler Blowdown vessel 2 Building Utilities
Boiler Chimney 1 Building Utilities
Cooling Towers 3 Offsites Utilities

Cooling water Distribution pumps 3 large, 2 small 5 Offsites Utilities


Chilled Water - Cooling (2 to 5 degrees) 500kW -
buffer vessel 1 5 KL Building Utilities
Water Chillers 2 Centrifugal, 1 Screw Chiller 3 Building Utilities
Chilled Water Prim. and Sec. Pumps 6 Building Utilities
Chilled Water Expansion Vessel 1 Building Utilities
Chilled Glycol - Cooling (-10 to -15 degrees) 20kW
- buffer vessel 1 2 KL Building Utilities
Glycol Chiller 2 Centrifugal, 1 Screw Chiller 3 Building Utilities
Chilled Glycol Prim. and Sec. Pumps 6 Building Utilities
Chilled Glycol Expansion Vessel Building Utilities
Purified Water System - RO-Water 5 m3/hr. < 20
DV2.Ro.Sys1 μ S 1 10 KL AISI 316L Building Utilities
AC2.Ta* Aircompressors - Compressed Air - 6 bar 2 Building Utilities
ACD2.Ta* Air Dryer 2 Building Utilities
ACR2.Ta* Air Receiver Vessel 1 Building Utilities
ACF2.Ta* Air Filters (2 process, 2 Black Utility use) 4 Building Utilities
Process ventilation (alkaline scrubber) 2000
Nm/hr 1 2 KL Tankfarm Utilities
Final Handling ventilation 1 Tankfarm Utilities
Liquid Nitrogen vessel - 15 bar 1 3 KL AISI 316L Tankfarm Utilities
Potable water storage tanks 2 30 KL AISI 316L Tankfarm Utilities
Fire Water storage tanks 2 60 KL FibreGlass Tankfarm Utilities
Sodium hydroxide 50 % Storage Tank 1 20 KL AISI 316L Tankfarm Pur/Syn?
NaOH2.Y1.Ta1 Sodium hydroxide 27,7 % Storage Tank 2 20 KL AISI 316L Tankfarm Pur/Syn?
Sodium hydroxide Dilution Tank 1 30 KL AISI 316L Tankfarm Pur/Syn?
HCL2.X1.Ta1 Hydrochloric acid (HCL) Storage tank 2 20 KL PEH Tankfarm Pur/Syn?
IPA1.A.Ta1 IPA (Isopropyl alcohol 90-10) Storage Tank 2 10 KL AISI 316L Tankfarm Purification
IPA waste storage tank 1 30 KL AISI 316L Tankfarm Purification
Transformers 2 Building Utilities
Automatic Transfer System 1 Building Utilities
Cos Phi correction system 1 Building Utilities
UPS system 1 Building Utilities
MCC panels 1 Building Utilities
High Voltage switchgear 1 Building Utilities

Low Voltage Switchgear - Electricity 400 V 600 A 2 Building Utilities


Emergency Power generator 400 V 600A. >
24kvA 2 Offsites Utilities
PEH /
new Waste water vessel (part of Neutralisation system) 2 20 KL Fibreglass Offsites Utilities
new Neutralisation tanks 2 PP Offsites Utilities
IPA1.B.Ta1 IPA waste vessel 1 10 KL AISI 316L Tankfarm Purification
Relief catch tank 1 Tankfarm Utilities
Process Vacuum System 2 Building Utilities
Piping, Pumps, valves etc. QS
Major Equipment New API Facility India
200T Utility Major Equipment Data for Indian Facility Equipment Location Process
Utility Equipment (storage tanks each with 2 Qty Size Unit Material
pumps)
DT1.Kdl2.Kdl1 Boilers - Steam 2 bar (200 kg/hr) + pumps 2 Building Utilities
Condensate Collection Vessel + pumps 1 Building Utilities
Dearator Vessel + pumps 1 Building Utilities
Chemical Dosing package 1 Building Utilities
Water Softeners 2 Building Utilities
Hot water package Heat exchanger, Vessel and 1 Building Utilities
Pumps
Boiler Blowdown vessel 2 Building Utilities
Boiler Chimney 1 Building Utilities
Cooling Towers 3 Offsites Utilities
Cooling water Distribution pumps 3 large, 2 small 5 Offsites Utilities

Chilled Water - Cooling (2 to 5 degrees) 500kW - 1 5 KL Building Utilities


buffer vessel
Water Chillers 2 Centrifugal, 1 Screw Chiller 3 Building Utilities
Chilled Water Prim. and Sec. Pumps 6 Building Utilities
Chilled Water Expansion Vessel 1 Building Utilities
Chilled Glycol - Cooling (-10 to -15 degrees) 1 2 KL Building Utilities
20kW - buffer vessel
Glycol Chiller 2 Centrifugal, 1 Screw Chiller 3 Building Utilities
Chilled Glycol Prim. and Sec. Pumps 6 Building Utilities
Chilled Glycol Expansion Vessel Building Utilities
DV2.Ro.Sys1 Purified Water System - RO-Water 5 m3/hr. < 20 1 10 KL AISI 316L Building Utilities
μS
AC1.Ta* Aircompressors - Compressed Air - 6 bar 2 Building Utilities
ACD1.Ta* Air Dryer 2 Building Utilities
ACR1.Ta* Air Receiver Vessel 1 Building Utilities
ACF1.Ta* Air Filters (2 process, 2 Black Utility use) 4 Building Utilities
Process ventilation (alkaline scrubber) 2000 1 2 KL Tankfarm Utilities
Nm/hr
Final Handling ventilation 1 Tankfarm Utilities
Liquid Nitrogen vessel - 15 bar 1 3 KL AISI 316L Tankfarm Utilities
Potable water storage tanks 2 30 KL AISI 316L Tankfarm Utilities
Fire Water storage tanks 2 60 KL FibreGlass Tankfarm Utilities
Sodium hydroxide 50 % Storage Tank 1 20 KL AISI 316L Tankfarm Pur/Syn?
NaOH2.Y1.Ta1 Sodium hydroxide 27,7 % Storage Tank 2 20 KL AISI 316L Tankfarm Pur/Syn?
Sodium hydroxide Dilution Tank 1 30 KL AISI 316L Tankfarm Pur/Syn?
HCL2.X1.Ta1 Hydrochloric acid (HCL) Storage tank 2 20 KL PEH Tankfarm Pur/Syn?
IPA1.A.Ta1 IPA (Isopropyl alcohol 90-10) Storage Tank 2 10 KL AISI 316L Tankfarm Purification
IPAW.A.Ta* IPA waste storage tank 1 30 KL AISI 316L Tankfarm Purification
Transformers 2 Building Utilities
Automatic Transfer System 1 Building Utilities
Cos Phi correction system 1 Building Utilities
UPS system 1 Building Utilities
MCC panels 1 Building Utilities
High Voltage switchgear 1 Building Utilities
Low Voltage Switchgear - Electricity 400V 600A 2 Building Utilities

Emergency Power generator 400 V 600A. > 2 Offsites Utilities


24kvA
new Waste water vessel (part of Neutralisation 2 20 KL PEH / Offsites Utilities
system) Fibreglass
new Neutralisation tanks 2 PP Offsites Utilities
IPA1.B.Ta1 IPA waste vessel 1 10 KL AISI 316L Tankfarm Purification
Relief catch tank 1 Tankfarm Utilities
Process Vacuum System 2 Building Utilities
Piping, Pumps, valves etc. QS
Major Equipment New API Facility India
200T Synthesis Line Major Equipment Data for Indian Facility Equipment Location
Eq. No. Production Equipment Qty Size Unit Material Building
Anil1.Ror.Ta1 Anilin Hold tank 1 AISI 316L Building
S2.A3.Ta1 Anilin Measuring vessel 1 Building
Building
Anil1.Ror.Pu2 Annilin Hold tank pump 1 Building
Anil1.Ror.W1 Anilin Heater 1 Building
Anil1.Ror.Pu4 Anilin Heater hot water circulation pump 1 Building
S2.A4.Ta1 Hydrochloric Acid Measuring vessel 1 Building
Building
S2.A5.Ta1 Purified water Measuring vessel 1 Building
S2.C.Ta1 Diazonium / intermediate Reactor 1 250 L PEH Building
S2.C.Omr1 Agitator for intermediate reactor Building
S2.D.Ta1 Coupling Reactor 1 4,5 KL AISI 316L Building
S2.D.Omr1 Coupling Reactor agitator 1 Building
Building
S2.D.Pu1 Coupling Reactor pump 1 Building
Building
S2.B.Ta2 PW measuring vessel for Sodium Nitrite 1 Building
S2.B.Ta1 Sodium Nitrite Hold tank 1 Building
Building
S2.B.Pu1 Sodium Nitrite Hold tank pump 1 Building
Building
Building
S2.C2.Ta1 Sodium Nitrite (Na Nit) Measuring Vessel 1 Building
S2.D1.Ta1 Caustic (Na OH) Dosing vessel 1 1 KL AISI 316L Building
S2.D1.Pu1 Caustic dosing pump 1 Building
S2.D1.Pu2 Caustic dosing pump 1 Building
S2.E.Ta1 Reduction Reactor 1 6 KL AISI 316L Building
S2.E.Omr1 Reduction Reactor agitator 1 Building
S2.E.Pu1 Reduction Reactor pump 1 Building
S2.E.W2 Reduction reactor bottoms pre cooler 1 Building
S2.E.W3 Reduction reactor bottoms after cooler 1 Building
S2.E.W1 Reduction reactor Anilin vapours pre cooler 1 Building
S2.G.W1 Reduction reactor Anilin vapours after cooler 1 Building
S2.G.Ta1 Anilin Distillate holding tank 1 2 KL AISI 316L Building
S2.G.Pu1 Anilin Distillate holding tank transfer pump Building
Building
S2.G.SCR1 Scrubber system 1 Building
S2.G.Pu3 Scrubber wash liquid pump 1 Building
S2.G.Pu4 Scrubber drain pump 1 Building
S2.G.Ta Scrubber Drain ISO tank 2 Building
Building
S1.E.Tra1 Dithionite Powder transfer system 1 Building
S2.E.Tvac1 Dithionite Powder system receiver 1 Building
S2.E.W1 Loadcells / weighscale powder transfer system 1 Building
Building
S2.R.Ta* Precipitation Hold tank 1 8 KL PP Building
S2.R.Omr* Precipitation Hold tank agitator Building
S2.R.Pu* Precipitation Hold tank pump Building
Building
S2.R.Ta* Centrifuge Feed Tank vessel 1 1 KL PP Building
S2.R.Omr* Centrifuge Feed tank agitator Building
S2.R.Pu* Centrifuge Feed tank pump Building
S2.X.Cen1 Centrifuge 1 1,5 M2 AISI 316L Building
S2.X. Lined SS drums (mobile) 20? Building
S2.X.Ta1 Centrifuge Filtrate vessel Building
S2.X.Pu1 Filtrate transfer pump Building
Utility Equipment (storage tanks with 2 pumps
each)
HCL2.X1.Ta1 Hydrochloric acid 30 % Storage tank 2 20 KL PEH Tankfarm
H2SO4.A1.Ta1 Sulphuric acid (H2SO4) 50% Storage tank 2 20 KL PEH Tankfarm
Sodium Nitride Storage tank 1 Tankfarm
Anil1.A.Ta1 Aniline storage tank 2 20 KL AISI 316L Tankfarm
Aniline heater Tankfarm
Ace1.A.Ta1 Acetone storage tank 1 20 KL AISI 316L Tankfarm
Waste handling equipment

Afl7.B.Ta1 Strong Waste Vessel (Aniline waste with some water) 1 20 KL PEH Tankfarm
Weak Waste Vessel (Water + traces Aniline) 1 Tankfarm
Afl7.A.Ta1 Solvent Waste Vessel (Recovered Aniline tank) 1 10 KL AISI 316L Tankfarm
RV2.A.Ta1 Break Tank (part of Purfied Water system) 1 Building

RV2.A.TA* Purfied Water Hold Tank (part of Purified water system 1 Building
Af16.A.Ta1 Sulfuric waste 1 20 KL PEH Tankfarm
Process
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis
Synthesis

Synthesis
Synthesis
Synthesis
Synthesis

Synthesis
Synthesis