Date: 4th Oct 2014

SUBJECT: PROCESS DESIGN TRAINING COURSE ON NATURAL GAS PROCESSING PACKAGES/SKIDS

1) Overview of Natural Gas Processing (One Day)


 Production of Natural Gas
 Typical Composition of Raw Natural Gas
 Need for Processing (liquid removal, impurities removal ETC)
 Briefing of Various Processes Involved
 Typical Sales Gas Composition
 Other products with typical composition from gas processing plant

2) Natural Gas Solid Desiccant Dehydration Skid (2 to 2.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
 Advantages of Solid Desiccant Dehydration

3) Natural Gas Liquid Desiccant Dehydration Skid (3 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
 Advantages of Liquid Desiccant Dehydration

4) Gas/Liquid Separation Skids (2 to 2.5 days)


 Types of separation equipment
 Design Guidelines of Two Phase Separator (Gas/Liquid)
 Design Guidelines of Two Phase Separator (Liquid/Liquid)
5) Low Temperature Separator Skid (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering

6) Amine Sweetening Process Skid (H2S & CO2 Removal) (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

7) Mercury Removal Skid (1 to 1.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

8) Nitrogen Removal & Reinjection Skid (1 to 1.5 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

9) NGL Recovery Skid (1.5 to 2 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

10) NGL Fractionation Skid (3 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

11) Treatment Process for NGL Fractionation Products Skid (2 days)


 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
12) Fuel Gas/Natural Gas Conditioning Skid (2 to 2.5 days)
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

13) Sulfur Recovery Package (SRU) (4 days)


 Purpose of SRU
 Technologies Available
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

14) Tail Gas Treatment Package (TGTU) (1.5 to 2 days)


 Purpose of TGTU
 Technologies Available
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification
15) Chemical Injection Skid (typically for one chemical injection) (1.5 to 2 days)
 Purpose of Chemical Injection
 Types of Chemical Injection
 Typical Process Flow Diagram (PFD)
 Typical Piping & Instrument Diagram (PID)
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification

16) Flare Package Skid (2 to 2.5 days)


 Purpose of Flaring
 Types of Flares
 Typical PFD/PID
 Process Description
 Major Equipment List
 Guidelines for Material of Construction of equipment & piping
 Design Guidelines for Sizing of Major Equipments
 Guidelines for Instruments to be used
 Process Aspects for Piping Engineering
 Guidelines for Hazardous Area Classification