SONATRACH

NEW LNG TRAIN SKIKDA PROJECT

SKIKDA, ALGERIA
OPERATING MANUAL VOLUME I, SECTION 3-6:
UNIT 15 NITROGEN STRIPPER

DOCUMENT NO: PP-AAA-PP1-110

KBR
JOB NO.: J6404
3 MRC Issued for Implementation 16-Nov-13 LP RM

2 KM Issued for Implementation 20-May-13 MRC RM

1 KM Issued for Implementation 9-Dec-12 MRC SPD

0 JDS Issued for Implementation 23-Nov-10 GRM BA AB

B JDS Issued for Client Approval 23-Sep-10 GRM BA -

A ACG Issued for Client Approval 2-Aug-10 GRM BA -

Rev. By Description Date KBR KBR CLIENT

Chkd App App


NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

TABLE OF CONTENTS
1.0 INTRODUCTION................................................................................................... 3
2.0 SYSTEM DESCRIPTION ...................................................................................... 5
3.0 OPERATIONS....................................................................................................... 6
3.1 Normal Operations............................................................................................................6
3.1.1 Nitrogen Stripper, 15-MD04 ...........................................................................................6
3.1.2 Nitrogen Stripper Reboiler, 15-MC12.............................................................................6
3.1.3 LNG Product Pumps, 15-MJ03/A...................................................................................7
3.2 Typical Operating Parameters ..........................................................................................7
3.3 Temporary Operation........................................................................................................7
4.0 START-UP ............................................................................................................ 8
5.0 SHUTDOWN ......................................................................................................... 9
5.1 Normal Shutdown .............................................................................................................9
5.2 Process Upsets and Production Loss...............................................................................9
6.0 SAFETY/EMERGENCY SHUTDOWN................................................................ 11
6.1 Safety Critical Shutdown Systems..................................................................................11
6.1.1 I-1540 – LNG Product Pump Trip Interlock ..................................................................11
6.1.2 I-1550 – MCHE, 15MC05 Trip Interlock .......................................................................11
6.1.3 I-1570 – Fuel Gas Compressor, 15-MJ04 Trip Interlock..............................................11
6.1.4 I-1594 –MCHE 15-MC05 Area Depressure Interlock...................................................11
6.2 Pressure Safety Valve Summary....................................................................................12
6.3 Fire Protection Equipment ..............................................................................................13
7.0 ATTACHMENTS ................................................................................................. 14
7.1 Attachment I: Equipment List ..........................................................................................15
7.2 Attachment II: Utility Consumption.................................................................................16

Page 2 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

1.0 INTRODUCTION
This operating manual relates to the facilities indicated on Process Flow Diagram
PR-15-PR32-005 and P&ID’s PR-15-SYPI-006, PR-15-SYPI-006A, and PR-15-SYPI-
007.
The LNG stream from the Helium Rich Gas Flash Drum, 15-MD03, flows to the
Nitrogen Stripper, 15-MD04 through the Nitrogen Stripper Reboiler, 15-MC12.
LNG product from the bottom of the stripper is sent to LNG Storage Tank 71-MF01
with LNG Product Pump, 15-MJ03/A.
Nitrogen rich overhead vapor from the stripper goes to the Fuel Gas Compressor, 15-
MJ04, after passing through the LMR/Helium Rich Gas Exchanger 15-MC06.
A liquid stream from the lower levels of stripper is circulated through Nitrogen
Stripper Reboiler, 15-MC12, to further cooldown the LNG feed entering the stripper.

Page 3 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

Page 4 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

2.0 SYSTEM DESCRIPTION


LNG product from the Helium Rich Gas Flash Drum, 15-MD03, contains 5.6% mole
of nitrogen. It counterflows through the Nitrogen Stripper Reboiler, 15-MC12, against
the cold stream obtained from the bottom liquids recirculation line of the Nitrogen
Stripper, 15-MD04. LNG product cools down to -153° C from -148°C and enters the
Nitrogen Stripper, 15-MD04
LNG product is flashed from 3.9 barg to 0.3 barg before entering the nitrogen stripper
which helps to remove a considerable amount of nitrogen by the stripper. It also
provides further cooling of the LNG product. The pressure drop in the stripper helps
in removing about 81% of the nitrogen content from the feed and drops the LNG
product temperature to -161°C at 0.3 barg before sending LNG product to the
storage tanks through the LNG Product Pump, 15-MJ03/A. LNG product leaving the
bottom of the stripper contains only 1.2% mole of nitrogen.
Nitrogen rich overhead vapor exits the tops of the Nitrogen Stripper, 15-MD04, at
-164°C, passes through the LMR/Helium Rich Gas Heat Exchanger, 15-MC06 to
warm up to -38°C and flows to the fuel gas system.

Page 5 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

3.0 OPERATIONS
3.1 Normal Operations
3.1.1 Nitrogen Stripper, 15-MD04
The LNG is flashed across 15-LV-1083 from 3.9 barg to 0.3 barg and enters Nitrogen
Stripper, 15-MD04. From the bottom of Nitrogen Stripper, LNG product at -161°C is
sent to the LNG Storage Tank, 71-MF01 through the LNG Product Pump 15-MJ03/A.
The vapour stream leaving the stripper overhead contains 40%mole of nitrogen and
60% mole of methane and enters the LMR/Helium Rich Gas Heat Exchanger, 15-
MC06 at -164°C to cool down the warm MR vapour stream from the HP/MR
Separator 16-MD08. The nitrogen rich overhead stream leaves the exchanger at
-38°C and flows to the Regeneration Gas Trim Cooler, 15-MC11 in the fuel gas
system.
The level in the Nitrogen Stripper, 15-MD04, is controlled by 15-LIC-1349 by
throttling the LNG Product Pumps 15-MJ03/A common discharge valve, 15-LV-1349.
The pressure of the Nitrogen Stripper, 15-MD04, is controlled by adjusting the speed
of Fuel Gas Compressor, 15-MJ04 through 15-PIC-1500. When the fuel gas
compressor is tripped or shutdown, pressure controller 15-PIC-1363 relieves the
excess pressure to the cold flare through 15-PV-1363.
3.1.2 Nitrogen Stripper Reboiler, 15-MC12
Nitrogen Stripper Reboiler is a thermosyphon type reboiler which receives the warm
LNG feed from the bottom of Helium Rich Gas Flash Drum, 15-MD03, at -148°C and
4.4 barg. The cold recirculation line from the bottom of the Nitrogen Stripper, 15-
MD04, enters the reboiler at -163°C to cool down the warm LNG feed to -153°C. Cold
recirculation line flows back to the stripper bottoms at -161°C.
The LNG feed temperature of the Nitrogen Stripper, 15-MD04 is controlled by the 15-
TIC-1342 through the temperature control valve, 15-TV-1342, on the bypass line
around the Nitrogen Stripper Reboiler, 15-MC12.
The setpoint on 15-TIC-1342 controls the amount of reboiling occurring in the
Nitrogen Stripper.
Increasing the setpoint will Decreasing the setpoint will
• bypass more feed flow around the • direct more feed flow through the
exchanger exchanger
• reduce reboiling • increase reboiling
• decrease the overhead fuel gas flow • increase the overhead fuel gas flow
• increase the N2 content in the LNG • decrease the N2 content in the LNG
product. product.
• reduce 15-PDI-1351 • Increase 15-PDI-1351

Excess reboiling will be indicated by an elevated reading on 15-PDI-1351 and can


lead to liquid carryover from the Nitrogen Stripper, 15-MD04, which could damage
downstream exchanger 15-MC06. Maintain a reboiling rate that meets the N2
specification for the LNG product and remains below 15-PDAH-1351. A high high
alarm on 15-PDI-1351 will activate the MCHE trip stopping flow to the Nitrogen
Stripper, 15-MD04.

Page 6 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

3.1.3 LNG Product Pumps, 15-MJ03/A


The bottoms leave the Nitrogen Stripper, 15-MD04 at -161oC and 0.34 barg and
enter the suction of the LNG Product Pumps, 15-MJ03/A. One pump is in operation
while the other is on standby. The discharge has a flow totalizer 15-FQI-1095 that is
compensated when the temperature reading 15-TI-1296 is measured then the
density is adjusted by 15-AI-1096J. The flow then goes to the LNG Storage Tank 71-
MF01. For more information on the LNG Product Pumps, 15MJ03/A please refer to
LNG Rundown Manual PP-AAA-PP1-111
3.2 Typical Operating Parameters
The following table contains typical operating variables for the Nitrogen Stripper.

Operating Variables for the Nitrogen Stripper

Tag No. Description Typical Value Units

15-LIC-1349 Nitrogen Stripper Level 50 %


Controller
Pressure Controller for the
15-PIC-1500 0.26 barg
Nitrogen Stripper
Nitrogen Stripper overhead
15-PIC-1363 0.3 barg
vapor relief to the Cold Flare
LNG to Nitrogen Stripper
15-TIC-1342 -153 °C
Temperature Controller
Temperature Indicator for
15-TI-1341 -161 °C
Nitrogen Stripper Reflux
Temperature Indicator for
15-TI-1343 -163 °C
Nitrogen Stripper Reflux
Temperature Indicator for the
15-TI-1346 -160 °C
Nitrogen Stripper Tray 11
Temperature Indicator for the
15-TI-1347 -162 °C
Nitrogen Stripper Tray 7
Temperature Indicator for the
15-TI-1348 -164 °C
Nitrogen Stripper Tray 3
Temperature Indicator for
15-TI-1344 -161 °C
Nitrogen Stripper Bottoms to
LNG Product Pump 15-MJ03/A
15-PDI-1351 Differential Pressure Indicator 60 mbar

3.3 Temporary Operation


Not Applicable.

Page 7 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

4.0 START-UP
This section outlines the steps necessary to place the Nitrogen Stripper in service
after a short period of shutdown where the liquid level in the stripper remains at
normal while the system is isolated. For the purpose of this section of the operating
manual, it is assumed that the following conditions exist: electrical power is available,
utilities are in service, Nitrogen Stripper, 15-MD04 and Nitrogen Stripper Reboiler,
15-MC12 are ready for start-up. LNG feed is available, downstream units are ready
to receive the nitrogen rich overhead stream and the LNG product pumps are cooled
down with the stripper and ready to receive LNG products from the stripper. The
Nitrogen Stripper and the reboiler should be brought up to operating conditions
almost in a simultaneous order of starting up Helium Separation System as described
below:
Note: For a startup after longer shutdown, if there is no liquid level and the equipment
is partially warmed up to ambient conditions refer to the Startup Manual for purging
and cooldown steps.

1. Verify that the isolation valves 15-ESDV-1542 and 15-ESDV-1543 are closed.
2. Verify that 15-TV-1342 is in manual and closed.
3. Verify that level control valve 15-LV-1083 is manual and closed.
4. Verify that the nitrogen stripper pressure control valve 15-PV-1363 and
blowdown valve 15-BDV-1410 are on auto.
5. Verify that the nitrogen stripper level control valve 15-LV-1349 is on manual and
closed.
6. Verify that the Helium Rich Gas Flash Drum has liquid level established above
the low level alarm.
7. Open isolation valve 15-ESDV-1542 by using 15-HS-1542 to introduce LNG to
the Nitrogen Stripper Reboiler, 15-MC12.
8. Open 15-LV-1083 to slowly establish level in the stripper to the normal.
9. When the level is established, open isolation valve 15-ESDV-1543 with 15-HS-
1543.
10. Proceed with the LNG product pumps start up steps as described in LNG
Rundown Operating Manual, PP-AAA-PP1-111, Start-up, section 4.0.
11. Place the nitrogen stripper level controller valve 15-LIC-1349 to auto and verify
the helium flash drum level control valve 15-LV-1083 is set to auto.
12. Place the nitrogen stripper LNG feed temperature control valve 15-TV-1342 to
auto.

Page 8 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

5.0 SHUTDOWN
5.1 Normal Shutdown
The following steps are based on a planned shutdown of the Nitrogen Stripper:
1. Verify that the LNG production is at minimum turndown rate and the upstream
units have already started to precede normal shutdown procedures.
2. Verify that the downstream units are ready for normal shutdown.
3. Verify that 15-PIC-1363 is on auto to maintain the stripper pressure.
4. Verify that temperature control valve 15-TV-1342 is manual and closed.
5. Close the isolation valves 15-ESDV-1542 through handswitch 15-HS-1542 to
stop the LNG feed flow from the Helium Rich Gas Flash Drum, 15-MD03.
6. Place the nitrogen stripper level control valve 15-LV-1349 manual and closed at
the low level of the stripper.
7. Shutdown the LNG product pump, 15-MJ03/A as described in LNG Rundown
Operating Manual, PP-AAA-PP1-111, Shutdown, section 5.0.
8. Close the isolation valve 15-ESDV-1543 through the handswitch 15-HS-1543 to
maintain the low liquid level in the stripper.
9. If the shutdown is only for a short duration, the stripper can be left isolated with
the liquid level above the low alarm so that the subsequent restart can be
shortened.
10. If the shutdown is for prolonged period of time, the stripper contents should be
vented to flare after the liquid inventory is drained and the controllers are put in
manual and closed.
5.2 Process Upsets and Production Loss
Listed events described below may cause temporary process upsets and production
loss but not necessarily shutdown of the system. An emergency requiring a shutdown
of the system should be shutdown as outlined above.
1. Loss of Instrument Air
Loss of instrument air will cause control valves to fail to their safe position.
Consequences of the loss of instrument air for the major control and isolation valves
are given below:
• 15-ESDV-1543, 15-ESDV-1542, 15-PV-1082, 15-XV-1138, and 15-PV-1363 will
fail close.
• 15-BDV-1410, 15-TV-1342, and 15-LV-1083 will fail open.
2. Loss of Electric Power
Loss of electric power will cause the LNG product pump to stop and the stripper to
quickly get on high level. In case of the high level in stripper, the high level alarm 15-
LAHH-1350 initiates MCHE trip and the trip of Fuel Gas Compressor, 15-MJ04
through the interlocks I-1550 and I-1570.
3. Loss of Feed

Page 9 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

Loss of LNG feed to the Nitrogen Stripper will cause the LNG level of the drum to
decrease and the level control valve 15-LV-1349 to close to stop the LNG flow to the
LNG Product Storage Tank.
If the LNG feed to the stripper cannot be re-established in a short time, shutdown of
the system may be required.

Page 10 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

6.0 SAFETY/EMERGENCY SHUTDOWN


6.1 Safety Critical Shutdown Systems
6.1.1 I-1540 – LNG Product Pump Trip Interlock
LNG Product Pump Trip Interlock I-1540 will trip the pump 15-MJ03/A on a low level
alarm, 15-LALL-1350, of the Nitrogen Stripper, 15-MD04, or high high pump seal gas
pressure (15-PAHH-4023/4033) or manual initiator 15-HZ-1550.
LNG Product Pump Trip Interlock I-1540 will also close 15 ESDV 1543 on a low level
alarm, 15-LALL-1350, of the Nitrogen Stripper, 15-MD04, or manual initiator 15-HZ-
1550.
6.1.2 I-1550 – MCHE, 15MC05 Trip Interlock
High pressure differential alarm 15-PDAHH-1351 on Nitrogen Stripper, 15-MD04 will
activate I-1550.
MCHE 15-MC05 Trip Interlock I-1550 will trip the Main Cryogenic Heat Exchanger,
the MR Liquid Expander,16-MJ06 and LNG Expander,15-MJ02. On activation of the
MCHE trip, the liquefaction unit main process vessels and heat exchangers, including
Nitrogen Stripper, 15-MD04 and its reboiler 15-MC12, are isolated from the mixed
refrigerant and Propane compressor circuits.
6.1.3 I-1570 – Fuel Gas Compressor, 15-MJ04 Trip Interlock
Fuel Gas Compressor, 15-MJ04 Trip Interlock I-1570 will trip the Fuel Gas
Compressor, 15-MJ04, on high level alarm, 15-LAHH-1350 of the Nitrogen Stripper,
15-MD04.
6.1.4 I-1594 –MCHE 15-MC05 Area Depressure Interlock
MCHE, 15-MC05, Area Depressure Interlock I-1594 will trip overheads of the
Nitrogen Stripper, 15-MD04 to the cold flare through the area depressurization valve
15-BDV-1410 by forcing it to fail open position.

Page 11 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

6.2 Pressure Safety Valve Summary


The Nitrogen Stripper System Pressure Relief Valve Summary contains a listing of all
the pressure relief valves associated with this system.

Nitrogen Stripper System Pressure Relief Valve Summary

Set Pressure
Valve Number Description/Location
(barg)

15-PRV-1228A/D Nitrogen Stripper, 15-MD04/Relief to Cold Flare 6.50


Header

15-PRV-1228B Nitrogen Stripper, 15-MD04/Relief to Cold Flare 6.66


Header

15-PRV-1228C Nitrogen Stripper, 15-MD04/Relief to Cold Flare 6.82


Header

Page 12 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

6.3 Fire Protection Equipment


The Nitrogen Stripper Fire Protection Equipment Summary is included in below listing
of Liquefaction Unit Fire Protection Equipment

Nitrogen Stripper System Fire Protection Equipment Summary

Description Quantity

Liquefaction Area

63-SP-005 Fire Blanket 1

63-SP-008 Fire Water Monitor (Grade) 3

63-SP-010 Live Hose Reel 2

63-SP-011 Hydrant Cabinet 4-Way 2

63-SP-024 Firewater Monitor Mounted on Four Way Hydrant 3

63-SP-050 Fire Water Monitor (Elevated) 2

Page 13 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

7.0 ATTACHMENTS
The following attachments are included in this section of the Operating Manual:
7.1 Attachment I: Equipment List
7.2 Attachment II: Utility Consumption

Page 14 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

7.1 Attachment I: Equipment List


The following is a list of equipment associated with the Nitrogen Stripper System.

Nitrogen Stripper System Equipment List

Design Design
Equipment
Description Pressure Temp
No.
(barg) (ºC)

15-MD04 Nitrogen Stripper 6.5barg/


75/-165
FV

15-MC12 Nitrogen Stripper Reboiler 10.3/FV 65/-170

Nitrogen Stripper Reboiler- Reboiler


6.5/FV 65/-170
Recirculation

15-MJ03/A LNG Product Pumps suction pot 16.9 65/-161

LNG Product Pumps Rated Capacity


1524.5m3/h

Page 15 of 16 KBR
NEW LNG TRAIN SKIKDA PROJECT DOCUMENT NO.
SKIKDA, ALGERIA PP-AAA-PP1-110
OPERATING MANUAL VOLUME I, SECTION 3-6: REVISION 3
NITROGEN STRIPPER 16 November 2013

7.2 Attachment II: Utility Consumption


Following are the electric motors associated with the Nitrogen Stripper System and
their expected consumption.

Nitrogen Stripper System Electrical Load List

Available
Equipment No. Description Load
(kW)

15-MJ03/3A LNG Product Pump 373

Page 16 of 16 KBR