STANDARD MAINTENANCE
PROCEDURE
FOR
BELT CONVEYOR/FEEDER
List of Contents
1. Definition
2. Work Instructions
3. Quality Check
4. Check before Release of Permit
5. Re-Commissioning Procedure
1.0 Responsibility
2.0 Manpower Required
3.0 Duration
4.0 Other Department to be Intimated
5.0 Details of Hazard Involve
6.0 Safety Precaution Required
7.0 Permit Type
8.0 Permit Approving Authority
9.0 Tools Required
10.0 Materials Required
11.0 Frequency of Maintenance
2. WORK INSTRUCTIONS :
29. All bearings clearance to be measured, labyrinth seal & lock nut to be tightened &
greased by PP.
30. Check bolt tightness of drive unit.
31. Check pulley lagging for distortion.
32. Check deflector pulley bearings condition and grease it. Also check for any shift in
shaft of deflector pulley. Replace deflector pulley bearing if required.
33. Check belt scrapper condition and adjustment/replacement if required.
34. Check skirt rubber condition and adjust/replace as per requirement.
35. Gear box cooling water line and valve to be checked and leakages to be arrested.
36. Check condition of counter weight rope
37. All Pulley brg. Clearance is to be measured & greased. Damaged brg to be replaced
if required.
38. Grease flap gate bearings & operation to be ensured.
39. Check/repair/replace deflector in the chutes.
40. Check take up pulley wire rope and lubricate.
41. Adjust labyrinth seal of pulley P/block.
42. Check guide clamp & replace.
43. Check ZSS, Pull Cord, Sway switch, calibrate/replace if required
44. Fill the check list.
45. Surrender the permit and ask operation depts. to normalize.
46. Check for leakages and attend if any, after taking permit.
47. Remove all T&P and clean the area
48. Cancel the permit (PTW).
3. QUALITY CHECKS:
5.RE-COMMISSIONING PROCEDURE:
Return PTW.
Normalize isolations after release of PTW