STANDARD OPERATING
PROCEDURE
FOR
FA HIGH PRESSURE WATER PUMP
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
List of Contents
• Objective
• Scope
• Responsibility
• Safety PPE’s
• Operating Procedure
• Tripping.
• Abbreviations / Notations
• References
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
• Objective:
• Scope:
1. Each FA HP water pump caters to the need for one unit fly ash wet disposal system.
2. There are Four no. FA HP water pumps, out of which maximum two will be working at a time.
The FA HP water pumps will be operated from the main PLC. One no. pressure indicator is provided to
monitor the pressure locally. For interlocking purpose one pressure switch is also provided at the common
header.
• Responsibility:
• Safety PPE’s
Ensure no permit to work is pending on regarding this system by checking with EE/FE.
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
• Ensure ASH water tank level is more than low level (>=2.5 mtr).
• Ensure pump protections are in service and all parameters indication is healthy.
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
• Operating Procedure
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
• Check discharge press. 7.20 kg/cm2 in discharge pipe line pressure gauge.
• Now observe the vibration and temperature of pump and motor bearing.
• Periodically check ash water tank level and adjust water make up as per requirement.
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
1. MCC Disturbance.
2. Ash water level below 1mtr.
3. Emergency Stop.
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
13. Reference
• EQUIPMENT CLEANING
• PHYSICALLY CHECK BOTTOM ASH HOPPER AFTER OPENING THE MAN HOLE
DOOR AS LIKE FOREIGN MATERIAL AFTER THAT CHECK THE ROTATION OF
CLINKER GRINDER IN FORWARD AND REVERSE DIRECTION.
• FIRST ENSURE SLURRY AND ASH WATER SUMP CLEANING AND THEN FILL
THE SUMP.
Desg.: Operation In- Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
Charge
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR FLY ASH HIGH PRESSURE WATER PUMP. PMPL
• CHECK THE LINE VACUUM AND SHUT OFF VACUUM OF ALL PASSES.