2 Type YKSL2240-4/1180-1
3 Rated Power kW 2240
4 Rated V. kV 11
5 In-phase rotating speed. r/min 1500
6 Start-up Current A 837.6
7 Rated Current A 139.6
8 Frequency Hz 50
9 Efficiency % 94
10 Power factor 0.89
11 Blocking torque 0.8
12 Blocking current A 6
13 Max. torque 1.8
14 Insulation F
15 Weight kg 14400
2|Page
SAFETY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking with
EE/MRSE.
2. Electrical cable insulation and motor termination to be ensured.
3. Operation of local start / stop push button shall be ensured for perfect operation to
facilitate for stopping of equipment in case of emergency.
Pre-Checks:
PRECHECKS AND ACTION BY FIELD ENGINEER
4|Page
5|Page
OPERATING PROCEDURE -
Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power supply, control power and instrument air supply available. √ √
3 CEP motor and pump bearing temperature is in permissible limit. √ √
4 At least one CCCW, one condensate make up pump is running √ √
5 Suction inlet MOV is opened. √ √
6 Discharge MOV is closed. √ √
START PERMISSIVE :
6|Page
SHUTDOWN SEQUENCE:
7|Page
1. PLANNED SHUTDOWN :
8|Page
continues to rise.
3 When endangering the safety of person and equipment. √ √ √ √
INTERLOCKS : Remarks
4 Condensate pump outlet motorized valve will close when pump stops
ABBREVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer
o MFT: Main Fuel Trip.
9|Page
o RB : Run Back
Important Note: