STANDARD OPERATING PROCEDURE

PPGCL Super Thermal Power Plant


3 X 660 MW.
FIELD SOP FOR BA HIGH PRESSURE WATER PUMP. PMPL

Revision No.: 01
Document No.: PMPL/SOP/02 Effective Date: Page 1 OF 7
Revision Date:

BA HIGH PRESSURE WATER


PUMP
3. Description of the system
1. Each BA HP water pump caters to the need for bottom ash disposal system.
2. There are three BA HP water pumps out of which maximum two will be working at a time. The BA
HP water pumps will be operated from the main PLC. One no. pressure indicator is provided to
monitor the pressure locally. For interlocking purpose one pressure switch is also provided at the
common header.
7. Equipments technical Details
APPLICATION BA HP PRESSURE WATER SUPPLY
QUANTITY 03 Nos (2W+1S).
Type Horizontal
Capacity 616 M3/Hrs.
TDH 140 M
No. OF Stage Single
Motor rating 3.3KV/375KW/1489RPM/81Amps

8. Pre check and Action By Field Engineer


 Ensure no PTW is pending for BA HP pump.
 Ensure ASH water tank level is more than low level (>=2.5 mtr).
 Pump breaker/panel is in service, Remote end are reset position.
 Ensure pump protections are in service and all parameters indication is healthy.
 Self sealing water hose line is connected properly.

9. Operating Procedure

 Open pump suction valve 100%.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR BA HIGH PRESSURE WATER PUMP. PMPL

Revision No.: 01
Document No.: PMPL/SOP/02 Effective Date: Page 2 OF 7
Revision Date:

 Open discharge valve in crack position (i.e.5 to 10%).


 Open recirculation valve.

 Release local push button switch.


 Start pump from SCADA.
 Open discharge valve gradually.
 Check discharge pressure 14 kg/cm2 in discharge pipe line gauge.
 Adjust the recirculation valve according to the discharge pressure requirement.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR BA HIGH PRESSURE WATER PUMP. PMPL

Revision No.: 01
Document No.: PMPL/SOP/02 Effective Date: Page 3 OF 7
Revision Date:

 Now observe the vibration and temperature of pump and motor bearing.
 Periodically check ash water tank level and adjust water make up as per requirement.
 For any abnormalities record in logbook and inform shift in charge/operation in charge.

10. Shut Down Procedure

 Close the discharge valve up to (80 to 90%).


 Then stop the BA-HP water pump.
 Then after complete close the discharge valve.

11. TRIPPING CONDITION:

1. MCC Disturbance
2. Ash water level below 1 mtr.
3. Winding temperature more than 100 Deg C.
4. Vibration more than 4.5 mm/s.
14 . POINTS TO BE CHECKED BY OPERATOR IN EVERY SHIFT
 EQUIPMENT CLEANING
 PHYSICALLY VIBRATION CHECKING
 PHYSICALLY TEMPRATURE CHECKING
 OIL LEVEL AND GREASE CHECKING
15. CHECKING OF SYSTEM AFTER SHUT DOWN

 PHYSICALLY CHECK BOTTOM ASH HOPPER AFTER OPENING THE MAN


HOLE DOOR AS LIKE FOREIGN MATERIAL AFTER THAT CHECK THE
ROTATION OF CLINKER GRINDER IN FORWARD AND REVERSE DIRECTION.
 CHECK THE OIL LEVEL FREENESS.
 PHYSICALLY ALL VALVE CHECKING MANUALLY OPERATION THROUGH
PLC AS WELL
 FIRST ENSURE SLURRY AND ASH WATER SUMP CLEANING AND THEN FILL
THE SUMP.

 CHECK THE SEAL PRESSURE OF ALL DOME VALVE PHYSICALLY.

 CHECK THE LINE VACUUM AND SHUT OFF VACUUM OF ALL PASSES.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD OPERATING PROCEDURE
PPGCL Super Thermal Power Plant
3 X 660 MW.
FIELD SOP FOR BA HIGH PRESSURE WATER PUMP. PMPL

Revision No.: 01
Document No.: PMPL/SOP/02 Effective Date: Page 4 OF 7
Revision Date:

 CHECK FLUIDIZING BLOWER AIR OF INDIVIDUAL HOPPER.

 CHECK THE PURZING OF BUFFER HOPPER AND SILO BAG FILTER.

 IF ANY PROBLEM OBSERVED IN EQUIPMENT THEN INFORM TO SHIFT IN


CHARGE/ OPERATION IN CHARGE IMMEDIATLY.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:

Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head