TRN ENERGY PVT LIMITED
2X300 MW POWER PLANT
CHECK LIST FOR PUMP
DATE PREVENTIVE EQUIPMENT NO.- PTW NO.
MAINTENANCE CHECK
LIST
1. PMONTHLY PREVENTIVE MAINTENANCE OF PUMP SYSTEM
Time:
EQUIPME
SL. NO. JOB DESCRIPTION
NT
1
CLEANING OF THE MACHINE
2 CLEANING OF SUCTION STAINER
3 CLEANING OF PUMP CASING
4 CLEANING OF SUMP PIT
TIGHTNESS OF PIPE FLANGE
5
BOLTS
6 CHECK CONDITION OF NRV
CHECK TIGHTNESS OF CASING
7 BOLTS
PUMP 8 CHECK LOW LEVEL SENSOR
SYSTEM INDICATOR
9 CHECK PUMPS CONDITION
CHECK TIGHTNESS OF NUT
10 BOLTS OF PUMP & MOTOR
11 GREASING TO BE DONE IN ALL
POINTS
CHECK & CLEAN DISCHARGE
12 PIPE
RETURN PERMIT & TAKE TRAIL
13 RUN
Remarks-
MELCO INDIA PVT. LTD. TRNEPL
SIGNATURE SIGNATURE
NAME NAME