Approval Signature
Item no. Inspection Checklist Remarks
MGS Engineer Owner's Representative
1 Permits
Accessibility of Work Site
Power Source and Water Source
Discharge Location
2 Drill Site Set Up:
Approved Well Point Location
a. Signed Lay-out
Equipment Set Up
Construction of Mud Pit
4 Electric Logging:
Procedure Inspection
Test Results
a. Lithology
b. Conductivity
c. Resistivity
Approved Well Design (7 days Duration)
a. Primewater Main Office (MIS Group)
b. Consultant
c. CMU
5 Well Reaming:
Size of Drill Head
a. Total Diameter required for Reaming
Approved Bentonite Chemical
Additional Chemical Used:
a._________________________, Purpose:
b._________________________, Purpose:
a. Checklist for additional Chemicals
Depth of Reaming ____________m
Soil Stabilization and Checking of Plumbness
6 Well Casings:
Diameter of Well Casings:____________
Approved Schedule of Casings
Furnishing & Welding of Blank and Screen Casings
a. Certified Welder (TESDA)
b. Crack Test for Joint Welding
c. Plumbness of Casing and Screens
Installation of Well Casings
Installation of Casing Centralizers
Installation of Gravel Pack Materials
Actual Well Design
7 Well Development:
Backwashing
a. Gravel Packing
1. Size of Gravel/Pebbles
2. Depth
Surging and Jetting
Air Lifting ________hrs
a. Turbidity of Water (Check minimum TDS)
Step Drawdown Pump Test
a. Turbidity of Water (Check minimum TDS)
Continuous Discharge Pump Test _______hrs
a. Specification of Pump and Motors to be used
Disinfection, Chemical used:____________________________
a. Checklist for additional Chemicals
8 Pedestal Construction
Elevation from NGL:_______________
Installation of Gravel Fill Pipe
Cement Grouting
Welding of Plate Cover
Sounding Tube
Attachment:
Requested by: