INSPECTION DESCRIPTION: Joint Inspection/Checking of rebars prior to form closure of 2nd Lift of A2-A3 STB East Wall
1 Concrete Covering
2 Rebar Splicing
3 Bar Diameter
4 Rebar Alignment
5 Embedded Items
6 Rebar Spacing
7 Starter Rebar
8 Rebar Bending
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of formworks prior to concrete pouring of 2nd Lift of A2-A3 STB East Wall
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of formworks prior to concrete pouring of 2nd Lift of A2-A3 STB East Wall
1 Dowels
2 Survey
3 Rebars
5 Concrete Covering
6 35 MPA
7 30 MPA
8 15 MPA
9 Filler Board
10 Waterproofing
11 Anchor bolts
12 Block-out
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of subgrade preparation for N2 Gas Storage Shed prior to Lean Concrete
5 Others.
Remarks:
CLEARANCE
REPORT No. : MCFPPEP-VPCI-AR-GTC-02138 Rev.
Details: Joint Inspection/Checking of subgrade preparation for N2 Gas Storage Shed prior to Lean Concrete
VPCI
No. Department Remarks
Name Signature Date
1 Electrical
2 Mechanical
3 Architectural
4 Civil
5 HVAC
MASINLOC POWER PLANT EXPANSION
PROJECT2X300 MW (NET) COAL FIRED POWER
PROJECT
FIELD INSPECTION REPORT
Pre-Placement Inspection Report (FDT Checklist)
INSPECTION DESCRIPTION: Joint Inspection/Witness of Conducting Field Density Test at H2 & C02 Gas Storage Shed @ Elev.+5.05
1 Cleaning
2 Marking
3 Elevation
Remarks:
AREA / LOCATION : CH
REF./DOCUMENT:
Details:
4 Laitances
5 Others
Remarks:
REF./DOCUMENT: 3-WD881-EA123-E001_Rev. 0
Details: Joint Inspection/Checking of formworks and cleanliness of column@ Waste Chemical and Lube Oil Storage Shed gridline K1-K2/KA-KD
Elev.+ 5350 prior to grouting
1 Drawing
7 Bolt Tightening
8 Touch-up Paint
9 Grouting
10 Cleanliness
11 Weld Visual
12 Final Painting
13 Bending Test
Inspection Description: Joint Inspection/Checking of water proof membrane 2nd Coat applied at penthouse roof slab prior to Final Coating
@ CHS Building
1 Cleaning
2
Dewatering
3 Waterproofing Application
Remarks:
A Water Proofing
3 No damage or leak
B. Rigid Insulation
C. PE Sheet Application
D Protection Mortar
1 Rebar Installation
Remarks:
Inspection Description: Joint Surface Inspection prior to sealant application @ STG Area Wall and MF6 Wall
1 Cleaning
2 Formworks
3 Location
4 Elevation
5 Dimension
Remarks:
Details: Joint Inspection/Checking of Chemical Drain Pipe Installed for plumbming system @ CCB
A. Preparation of Area:
B. Piping
C. Sand Bedding
D Back Filling
1 Proper elevation
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Installed & Leak Test/Hydro Testing of Potable Water Piping @ CCB 1st-2nd
Floor Grid. (1-2/I-J) & 3rd Floor Grid (1-2/I-J to 1-2/F-J)
B. Piping
Remarks:
INSPECTION DESCRIPTION: JJoint Inspection/Witness of Rectified Plumbing Drainage for Close-Out of NCR (NC-0206) @ STB East side area.
B. Piping
Remarks:
Details:Joint Inspection/Checking of Leak Test for Drainage Pipe Installed at STB Ground Floor Grid 1-3/A-B and 2/B-C.
A. Preparation of Area:
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking for Hydrotesting of Potable Water Piping at CCB Roof Top Grid 1-2/D-J.
A. Preparation of Area
B. Piping Installation
Remarks:
MCFPPEP-VPCI-AR-GTC-01808
Location: CCB Building
1 Conduit size and thickness are in compliance to technical Accept Not Accept
specification.
5 Conduits are complete and have not been damaged. Accept Not Accept
7 Conduits are adequately fixed to support structures and sections Accept Not Accept
are correct.
COMMENTS:
Location:
COMMENTS:
4 Conduits are complete and have not been damaged Accept Not Accept
5 The coupling, end bell and accessories/devices are well fixed, Accept Not Accept
as needed.
7 The threading are those prescribed in technical specification Accept Not Accept
10 The conduit mouths are temporarily closed to avoid the Accept Not Accept
admittance of extraneous objects.
COMMENTS:
MCFPPEP-VPCI-AR-GTC-01756 0-WD700-CE250-00604_F01
Location: CCB Roof Top Grid 1-3/C-I Date: April 14, 2017
2 Verify alignment and leveling of cable tray installed. Accept Not Accept
4 Verify touch up of painting must be done to cut edges. Accept Not Accept
7 Check all bolt and nuts are properly tighthen. Accept Not Accept
8 Check for cable tray free from sharp edges. Accept Not Accept
11 Verify cable tray labelling and cable routing are installed. Accept Not Accept
COMMENTS:
Cable Tag No.: 1.5MM sq x 20C x 2EA, 1.5MMsq x 2P(28) x 2EA Cable(s): 4
Cable Route (cable duct bank size, trench size and cable
2 trays size) are correct and accepted as per drawing. Accept Not Accept
Cables are laid correct cable tag and size (prior to sand
5
bedding, duck bank and tray cover installation). Accept Not Accept
10 Cable entry opening / fire seal are installed properly. Accept Not Accept
11 Cable continuity and insulation test after cable pulling. Accept Not Accept
12 Cable Dress to be observed and proper cable looping. Accept Not Accept
b Rev.
INSPECTION DESCRIPTION: Joint Inspection/Checking of Cladding Installation for Expose Mechanical Supply Duct Installed @ CCB Roof Top GL (1-
2/C-I)
GTC GLOBAL VPCI MPPCL
No. Description Remarks
ACCEPT REJECT ACCEPT REJECT ACCEPT REJECT
A. Preparation
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Witness/Checking of expose mechanical supply and return duct (horizontal and riser) installed @ CCB
Roof Top GL. 1-3/C-J
A. Duct Insulation
1 25 mm : Interior
50 mm : Exterior
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Mechanical Duct installed and Air Device Location (HVAC) @ CCB 3rd Floor UPS Room
Grid 2-3/G-H.
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of HVAC-Refrigerant Charging for AC Piping Indoor and Outdoor Unit at WWTB 1st Floor Grid
(5/B-E0 2nd Floor Grid (2-5/C).
B. Brazing of Joints
C LeakageTest
D VacuumTest
1 Evacuate the refrigerant pipings for 2 hours.
Manifold gauge reading is -30 in/hg and maintain
2 for 1 hour.
E Refrigerant Charging
1 As per manufacturer recommendation
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking for Flashing of exposed mechanical duct installed passed-through roof slab prior to cladding at
CCB Roof Top South and North Side.
A. Penetration of Duct
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Site Accept Test (SAT) for HVAC System at CCB 2nd Floor, 3rd Floor and Roof Top.
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Cladding Installation for Expose Mechanical Duct Installed at CCB Roof Top Grid 1-3/C-F.
A. Preparation
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Witness of HVAC Control Panel Installed @ IEB 2nd Floor
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Witness/Checking for Installation of RTU @ CCB Roof GL. (1-3/C-1)
A. INSTALLATION OF RTU
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Witness/Checking for Installation of RTU @ CCB Roof GL. (1-3/C-1)
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Paint Application for Floor, Trenches & Chemical Pit @ WWTB Water Treatment Area prior to Turnover
9 Thinning ratio:
12 Intermediate coat applied and free from runs, sags, drips, dry or
foreign matter. (If 2nd coat is required, record results below)
1st Coat: DFT / WFT: a b c d
2nd Coat: DFT / WFT: a b c d
Top coat applied and free from runs, sags, drips, dry or foreign matter.
13 (If 2nd coat is required, record results below)
Remarks:
REF./DOCUMENT: 3-WD866-EA120-10010_Rev. 4
Details: Joint Inspection/Checking of Surface Preparation for FGD Ground Floor - E1/E2 to EC/EA prior to polycrete and primer application
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Surface Preparation prior to repair of North Wall and South Wall at Intake Building.
6 Others
Remarks:
AREA / LOCATION :
INSPECTION DESCRIPTION:
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Completed Ceiling Frame prior to Closure @ CCB Ground Floor Lobby
2
Materials are not broken, cracked chipped or deformed
3 All penetrations are closed, fire-sealed, etc., as applicable
7
All works are clean, dry and free from dirt and cracks
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Metal Frame and Glass Wool line U2-U3 @ 2nd Floor & Line UE-UD @ Ground Floor CHS Building
7
Insulation are completely installed and fixed as required
Installation of gypsum board according to the fire rating
8
specified
9
Dimensional correctness and tolerances on gypsum board
10
Surface finish of the gypsum board as per applicable level
11 Spacing and fixing of fasteners
12 Frames to door opening
13
Frames to electrical, mechanical, and HVAC systems
14 Visual inspection for defects and damages
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Completed Seal Coat application at FGD Switchgear Room.
Remarks:
INSPECTION DESCRIPTION:
1
Materials are in accordance with relevant specification
2 Plaster mixes are approved
3
Materials are stored in a proper manner to prevent deterioration
4
Plaster accessories are as per approved materials
5 Surface to receive plaster is plumb
6 Clearance for plaster is obtained
7 Plaster thickness and plumb of first layer
8 Plaster thickness and plumb of second layer
9 Plaster thickness and plumb of final layer
10 Cutting of control joints
11 Curing of each layer of plaster
12 Sealant application on control joints
Remarks:
AREA / LOCATION :
INSPECTION DESCRIPTION: Joint Inspection prior to Window Installation @ CCB Staircase-1, Staircase-2, Toilet and Shower Room
Remarks:
Details: Joint Inspection/Checking for the installation of Toilet Partition and Urinal Partition at WWTB Toilet Area.
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking for the installation of Roof Drain at CCB Roof Slab South Side.
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of 2nd Floor Metal Deck Installation of WWTB Area @ gridline J1-J5/JC-JE
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking for Alignment and Level of C.E.P Pit Frame and Grating Cover for Close-Out of NCR (NCR-0055) at
STB Area.
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Pipe Penetrated Wall located on Toliet, Locker Room Area and Third floor of CCB, need
proper sealingt using approved materials prior to installation of ceiling board
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Witness/Checking for Mounting of RTU @ CCB Roof GL. (1-3/C-1)
Remarks:
INSPECTION DESCRIPTION: Joint Inspection/Checking of Damaged Louver located @East Side of WWTB prior to close out of NCR-0438
Remarks:
Ref. No. /DWG. No. : Punch List (Central Control Building 3rd Floor)
INSPECTION DESCRIPTION: int Inspection/Checking of punch list item rectification for the following: Toilet (Male & Female), Shower Room (Male & Female),
Locker Room (Male & Female), Heater Room, Conference Room No. 2 &Library
2 Tiles
3 Ceiling
4 Painting
5 Cleaning
6 Others
Remarks: