Date / Time Prepared by(Sub-con) : GTC Global, Inc. Authorized Environmental Person(VPCI) : Authorized Safety Person(VPCI) :
☞ Using Heavy Equipment / Tools : Welding Machine, Grinder, Gas Cutting, Generator
Provide appropriate
resting shelter and
drinking station intended
to the workers involved
with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Barricade and signage Safety briefing and use double eye
should be put in place to vigilant monitoring protection (safety
Eye injury warn the public goggles with face shield) YES
during the grinding
cutting works
Use fire blanket to Remove all flammable
contain the spark during and combustible
materials on working
the hot work activity
area
Standby fire extinguisher
Fire hazard YES
and fire watchman on
working area
Inspect the working area
prior to start the work
Ensure certified
electrician should
terminate all electrical
connections
Barricade and signage Only certified personnel Use welding mask during
should be put in place to should work on this welding works
warn the public particular activity
Eye injury YES
Safety briefing regarding
work safely before
commencing the job
Safety briefing to all
personnel prior to start
the work
Accident due to horse play YES
Assign personnel to
continuous monitoring
on working area
Barricade and signage Ensure the area is free Wear proper personal
should be put in place to from any obstruction protective equipment
prior to start the work
warn the public such as, hand gloves,
long sleeve, safety shoes,
Accident due to slip / tripping hazard All materials should be YES
hard hat including safety
properly segregated
goggles
Maintain good
housekeeping on
working area
In case of bad weather
condition / heavy rains,
work should be stop
Accident due to bad weather condition YES
immediately.
Always update / monitor
the weather condition
Standby first aider on
working area for possible
emergency
Provide appropriate
resting shelter and
drinking station intended
Accident due to heat stroke / heat to the workers involved YES
stress with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Tools and Spine board, First aid kit, Spill kit Exact location of AREA 2 CCB STG STB
Equipment needed Emergency First Aid GTC SHELTER