You are on page 1of 1

North-South Commuter Railway Extension Project

CP N-05 : Building and Civil Engineering Work for Depot Building Including
Related Infrastructure and Track Work Ballast (Contract No : NSCREX-03-N05)
Applicable Standard : N/A

Material Compliance Matrix Standard Reference No: N/A


Standard Revision: N/A

MAR Reference No.: NSCR-PSC-N05-MABDPT-MAR-QA-000017 Manufacturer: Tencate Sub-Project: GRS Integral Bridge

Material Description: Geosynthetics Model: Miragrid Date Prepared: 15 May 2021

DESCRIPTION REQUIREMENTS IN
Item MAR Reference No. TEST Result Specification COMPLIANT Remarks
THE STANDARD

Tensile loading Test, Kn/m 100 75 Yes No

Alkaline Deterioration Test, Kn/m 0.97 0.96 Yes No


NSCR-PSC-N05-MABDPT
1 Tencate - Migragrid
MAR-QA-0000017
Mechanical Damage Test, Kn/m 0.91 0.91 Yes No

Creep Test, Kn/m 0.70 0.55 Yes No

FORM NO. DESCRIPTION DATE


CPN05-POSCO-QA-006 MATERIAL COMPLIANCE MATRIX (MCM) REV.B 01-MAR-21