3. Operating Procedure:
Start the bag filter purging.
Start the blower and heater; ensure heater temperature ok.
Start the vacuum pumps take the shut off and line vacuum.
Start the silo purging and vent fan.
Start the TAC and charge the silo conveying lines from D-pumps to Silo in Auto timer mode.
If shut off, line vacuum ok, start the vacuum conveying from ESP to buffer hopper in Auto timer
mode.
Check the all the dome valves and switch valves operating properly.
Check the ESP hoppers, buffer hopper, D-pumps properly emptying after start.
For any abnormalities record logbook and inform shift incharge.
Important Settings:
Besides above timer settings, major pressure switch settings shall be as follows:
1. All switch valve seal pr. Switches: 5.5 Bar rising.
Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (PPGCL): Approved by (PPGCL):
Signature: Signature: Signature: Signature:
Line Vacuum transmitter set point for smooth operation of vacuum system.
chocked
5 SP-5 Line pressure high high Above 3.0 bar Line chocked
9. Shutdown procedure
After completion of ESP dry ash De-ashing select all passes in manual mode.
Close the entire hoppers dome valve.
Close all the passes of the switch valve except one row.
Flushing all passes ash evacuation line from switch valve to buffer hopper.
After flushing completed, open vacuum breaker valve at first ash evacuation line
then vacuum line.
Stop the vacuum pump.
Close seal water valve of vacuum pump.
After completion of flushing of the system from buffer hopper D-pump to silo, then
stop the PTAC.
Stop fluidizing blower and heater.
4. POINTS TO BE CHECKED BY OPERATOR IN EVERY SHIFT
EQUIPMENT CLEANING
PHYSICALLY VIBRATION CHECKING
PHYSICALLY TEMPRATURE CHECKING
OIL LEVEL AND GREASE CHECKING
1. CHECKING OF SYSTEM AFTER SHUT DOWN
PHYSICALLY CHECK BOTTOM ASH HOPPER AFTER OPENING THE MAN HOLE
DOOR AS LIKE FOREIGN MATERIAL AFTER THAT CHECK THE ROTATION OF
CLINKER GRINDER IN FORWARD AND REVERSE DIRECTION.
CHECK THE OIL LEVEL FREENESS.
PHYSICALLY ALL VALVE CHECKING MANUALLY OPERATION THROUGH PLC
AS WELL.
FIRST ENSURE SLURRY AND ASH WATER SUMP CLEANING AND THEN FILL
THE SUMP.
CHECK THE SEAL PRESSURE OF ALL DOME VALVE PHYSICALLY.
CHECK THE LINE VACUUM AND SHUT OFF VACUUM OF ALL PASSES.
CHECK FLUIDIZING BLOWER AIR OF INDIVIDUAL HOPPER.
CHECK THE PURZING OF BUFFER HOPPER AND SILO BAG FILTER.
IF ANY PROBLEM OBSERVED IN EQUIPMENT THEN INFORM TO SHIFT IN
CHARGE/ OPERATION IN CHARGE IMMEDIATLY.