You are on page 1of 4

SCAFCO Grain LLC

5400 E. Broadway Avenue, PO Box 11215


Spokane, WA 99211-1215, USA
Tel: 509-535-1571 • info@scafcograin.com • www.scafcograin.com
CLIENT DETAILS PROFORMA INVOICE NO. 2306-PHAF1012-00-VS
LIMCOMA QUOTE DATE 2-Jun-23
PHILIPPINES EXPIRATION DATE 17-Jun-23

ELECTRICAL SUPPLY 230/460 VAC - 60 HZ - 3 PH PREPARED BY VIKAS SHRIVASTAVA

Item Qty. Part Description Ttl.Wt.


# # (Pounds)

1.0 2 3968ESZ4 Model 3968ESZ4 Flat Bottom Silos and Access.


Model 3968ESZ4 SCAFCO externally stiffened grain storage silos 39’0”
(11.89 m) diameter, 67’8” (20.62 m) eave height, 78’5” (23.90 m) overall
height complete with one-piece roof panels on rafter roof structure (3,000
lbs peak load), heavy-duty roof cap and 23 ½” x 26" (597 mm x 660 mm)
access door is installed in the second ring. 250 kph wind speed and
Seismic Zone 4 per the 1997 Uniform Building Code. Roof, wall sheets
and stiffeners manufactured from high quality Hot Dipped galvanised
Zinc coated steel.. Peak storage capacity 1,889 MT Corn @750
Kg/m3(includes 6% compaction factor). 2,377 m3.

Steel based on minimum 65,000 psi (448 N/mm2) Tensile Strength and
a minimum of 55,000 psi (379 N/mm2) Yield Strength. SILO HAS
STANDARD 5 YEARS STRUCTURAL WARRANTY

1.1 8 211110-39E Wind ring assemblies for 250 kph wind speed (Included with the silo)
1.2 2 218302 Additional roof clips for high wind areas
1.3 2 LDE068 Exterior ladder with safety cage and two rest Platforms (End to End)
1.4 2 LDI068 Interior ladder package
1.5 2 214798 Galvanized Silo steps
1.6 2 211700-39 Galvanized roof stairs 24” wide x 21’0” long (610 mm x 6.40 m) with non-
skid treads, stair beams & brackets, handrails both sides & access to
inspection hatch at eave
Silo Sealing Package
1.7 270 290177 Grain bin eave seal x 112 1/2” long
1.8 72 290396 Rib Clip Sealing blocks
1.9 2 298049 Spray-on Adhesive for installing rib clip sealing blocks
1.10 68 290021 3/16" X40' (4.76mm X 12 m) Bead sealants for seams
1.11 20 290788 EMSEAL AST Hi-Acrylic silo base sealant 32 mm square x 3.96 m long

1.12 104 52X 1.75" dia, ASTM F1554, Grade 36 anchor bolts (2 per baseplate)– -
By Civil Contractor
Total Net Cost & Weight Ex-Works, U,S.A 112,000

High Level Switches


2.0 2 BM45FH BM45FH Bin Master pressure sensitive level indicator with heavy duty
neoprene diaphragm - external mounted
2.1 2 218258HD Level indicator mount adapter

Total Net Cost & Weight Ex-Works, U,S.A 34

Shipment depends on availability of steel at the time order is placed. Page 1 of 4


SCAFCO Grain LLC
5400 E. Broadway Avenue, PO Box 11215
Spokane, WA 99211-1215, USA
Item Qty. Part Tel: 509-535-1571 • info@scafcograin.com
Description • www.scafcograin.com
Ttl.Wt.
# # (Pounds)

Aeration Systems – 9.2 m3/H/MT (0.143 cfm/bu) Airflow Rate


3.0 2 23-39CY-68 Wide Y pattern flush floor aeration system consisting of plain and
perforated corrugated decking, 15 gauge (1.63 mm)x 4"(100 mm) wide hat
beams, 16 gauge (1.47 mm) X12" (305 mm) high support legs, 12 gauge
(2.59 mm) trench cover plates and fasteners.
3.1 2 231207 Raised centrifugal fan transitions
3.2 2 24L27153LCE SCAFCO All-galvanized centrifugal fans complete with 15 HP (11.25
kW) 3 phase, 230/460V 1,750 RPM, energy efficient TEFC motor without
controls
3.3 3 239015-4 Carton of four, 15” x 15” x 90° (380 mm Square) Gooseneck roof vents
@6 Vents/Silo
Total Net Cost & Weight Ex-Works, U,S.A 3,192

4.0 2 OPI OPI Temperature Monitoring Systems (FB-CHST6)


MDR70H-MT6 2 x 70 ft MDR2 Temperature Cable with Hanger Suspension, 12 Sensor, 6
ft Spacing and 2-Wire Male Connector
MDR67H-MT6 6 x 67 ft MDR2 Temperature Cable with Hanger Suspension, 11 Sensor, 6
ft Spacing and 2-Wire Male Connector
INT2-20-F 2 x 20 ft 2-Wire Interconnect with a Female Connector
INT2-30-F 6 x 30 ft 2-Wire Interconnect with a Female Connector
INT2-90-M 2 x 95 ft 2-Wire Interconnect with a Male Connector
INT2-GRND 2 x Interconnect with Grounding
INT2-SHRT 2 x Docking Station for Interconnect
CC00-0400-0000 2XC-ENCL., 4in, 1 Out, Term Block
4.1 1 MON1-DM01 Deluxe Digital Monitor - Rv3
4.2 9 214908-08 Temperature cable to rafter brackets

Total Net Cost & Weight Ex-Works, U,S.A 98

NO SWEEP AUGER QUOTED AS SILO TO SIT ON


CONCRETE FOUNDATION HAVING CONICAL BOTTOM.

Total Estimated Weight

115323 lbs.(52300 Kg)

Quote Validity
Prices valid for 15 days

Shipment depends on availability of steel at the time order is placed. Page 2 of 4


SCAFCO Grain LLC
5400 E. Broadway Avenue, PO Box 11215
Spokane, WA 99211-1215, USA
*PLEASE NOTE: This silo is designed Tel: 509-535-1571 • that
to store materials info@scafcograin.com • www.scafcograin.com
discharge in a free flowing, concentric, funnel-flow manner. If the product to be
stored does not meet these requirements, eccentric discharge, bridging and packing can occur which may result in silo structural damage/failure,
injury, or DEATH. Special unloading and/or fluidizing equipment designed specifically for any non-flowable materials are necessary to ensure
consistent flow of the product from the silo. Failure to use proper loading procedures and unloading equipment will void the SCAFCO
structural warranty.
**CAUTIONARY NOTE: The sweep auger listed in this quotation will vary in performance based on grain consistency and condition as well as bin/silo
floor conditions. Capacities listed are optimum based on dry, clean, corn, and ideal conditions. The sweeping process will be complete after one or two
revolutions. For commercial sweep augers it is recommended that the center portion of the sweep be used first and then add on sections in sequence, per
revolution, until the entire sweep has been assembled and the bin unloaded to avoid damage to the auger per the manufactures owner’s manual. After
completion of the sweep process a minimum grain layer of 2”-3” (50 mm – 75 mm) will remain for manual sweeping. Although the sweep auger
components are warranted against defects in material and workmanship for one year, when installed and operated according to manufacturer’s instructions,
SCAFCO does NOT warranty sweep auger performance. If sweep auger is left in silo after clean out, it must be removed from the center well sweep pivot
and laid next to unload system. Left installed in sweep pivot during filling and emptying can result in damage to center well.
**THIS QUOTATION DOES NOT INLCUDE L/C FEES. ALL L/C FEES ARE TO THE ACCOUNT OF THE APPLICANT**
PAYMENT, CREDIT & SHIPPING INFORMATION AND OBLIGATIONS:
1 PAYMENT TERMS: SCAFCO's acceptance of Purchaser's order and commencement of production will begin upon SCAFCO's receipt of a non-
refundable down payment in the amount of 20% of the above total cost (the “Non-Refundable Down Payment”), including freight and insurance, if offered. The
remaining balance shall be due no later than twenty one (21) days prior to container loading at SCAFCO's Spokane, Washington U.S.A. facility. Purchaser will
be in material default of this Contract if it fails to pay the Remaining Balance as required herein. After the remaining balance and applicable fees are paid, the
shipment will be scheduled for the next available loading date.
2 AVAILABILITY: Shipment depends on availability of steel at time order is placed. Available for shipment Ex-Works Spokane, Washington U.S.A.
approximately twelve to fourteen (12-14) weeks after receipt of a non-refundable 20% Down Payment and Purchaser’s written approval of pre-production
design drawings, if requested by SCAFCO. All shipments are subject to availability of suitable truck, rail, ocean and/or air transportation

3 ELECTRONIC PAYMENT INSTRUCTIONS:


WIRING INSTRUCTIONS:
CIBC Bank USA, 120 S LaSalle, Chicago, IL 60603, ABA: 071006486, Swift code: PVTBUS44
For further credit to: SCAFCO Grain LLC (Collection Account), Account No. 2557541
ACH INSTRUCTIONS:
CIBC Bank USA, 120 S LaSalle, Chicago, IL 60603, ABA: 071006486,
For further credit to: SCAFCO Grain LLC (Collection Account), Account No. 2557541
4 The quoted freight prices are for the convenience of Purchaser, based on rates and fees in effect as of the date of this quotation. Actual freight charges invoiced
to Purchaser will be based on the rates and fees in effect at time of shipment.
5 The number of containers/vans/flatbeds and quoted price is based on the estimated weight of the equipment and legal transportation weight limits. Charges
invoiced to Purchaser will be based on the actual quantity of containers required.
6 CPT and CIP Incoterms 2010 do not cover any port or handling charges outside of the country of export. These extra costs are not included in this quotation,
but instead shall be to the account of Purchaser and/or Purchaser's consignee.
7 Demurrage, standby and/or detention charges imposed by the freight forwarder, trucking companies, and/or ocean carrier and incurred outside the U.S.A. shall
be borne by Purchaser and/or Purchaser's consignee; SCAFCO assumes no responsibility for payment of such demurrage, standby and/or detention charges. For
will call orders, SCAFCO assumes no responsibility for payment of such demurrage, standby and/or detention charges.
8 Title shall pass from SCAFCO to Purchaser upon: (i) delivery of the goods to SCAFCO‘s contracted carrier; and (ii) SCAFCO's release of commercial shipping
documents.
ADDITIONAL INFORMATION AND OBLIGATIONS:
A This quotation expires, is withdrawn, and shall terminate if it is not accepted and counter-signed within 30 Days from the Date stated above.

B All costs of independent inspection services, required or requested, shall be borne by the Purchaser. All prices are quoted in U.S. Dollars.
C Unless specifically listed and included in this Quotation, on-site technical silo erection assistance services are not provided. Prices for optional on-site technical
silo erection assistance services are available upon request.

D All technical documents provided for this quote are to be considered typical and are to be used as reference only, are subject to change, and are NOT intended to
be used for construction instructions or specifications. Final “For Construction” documents will be issued following engineering design of the ordered material
package.

Shipment depends on availability of steel at the time order is placed. Page 3 of 4


SCAFCO Grain LLC
5400 E. Broadway Avenue, PO Box 11215
Spokane, WA 99211-1215, USA
Tel:review
E TERMS & CONDITIONS: Please 509-535-1571 • info@scafcograin.com
SCAFCO’s complete Terms and Conditions•of www.scafcograin.com
Sale at: http://scafcograin.com/language/en/corporate/Termsofsale,
which are incorporated herein by reference as if fully set forth herein. To the extent that any conflict exists between a provision in this Quotation and the Terms
& Conditions, the provision found in this Quotation shall govern.

F This Quotation and Terms & Conditions shall embody the entire agreement between Purchaser and SCAFCO regarding the sale/purchase of goods contemplated
herein. This Quotation shall supersede and may not be modified by documents issued by SCAFCO’s field personnel, including but not limited to account
representatives, branch managers, and the like, as they do not have authority to sign documents modifying this Contract. Use by SCAFCO of a Purchase Order,
or similar document, number provided by Purchaser to facilitate administration, billing, and payment shall not be deemed acceptance of terms and conditions
appearing therein that are in addition to, or conflict with those contained herein. No modification of this Agreement by Purchaser shall have any effect unless
such modification is agreed to and accepted by an authorized officer or agent of SCAFCO, in writing.

SCAFCO reserves the right to correct this quotation for errors or omissions.

Purchaser’s signature below is an expression of its acceptance of this Quotation, creating a


binding agreement (the “Contract”) between Purchaser and SCAFCO Grain Systems
SCAFCO GRAIN SYSTEMS CO,
Company (“SCAFCO”).

Authorized Signature (Buyer):


Vikas Shrivastava
Title: Vikas Shrivastava - International Sales Director

Date: Proforma Invoice No: 2306-PHAF1012-00-VS

Shipment depends on availability of steel at the time order is placed. Page 4 of 4

You might also like