Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 1 of 7
DRY ASH
PRESSURE
CONVEYING SYSTEM
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 2 of 7
SCOPE: This SOP is applicable for 48no’s Buffer hopper ash transportation.
INTRODUCTION: This System is needed to evacuate fly ash from buffer hopper to fly ash silo
through positive air pressure, this system called as fly (Dry) ash pressure conveying system.
PRE CHECKS:
DRY ASH PRESSURE COVEYING SYSTEM TECHNICAL DATA:-
Make SEPCO. Quantity 24 sets
Blow tank (Air lock 8 no’s/unit Maximum Capacity 240 t/h
vessel)
Air pressure 2.35 kg Blow tank volume 10 m3
Cycle time 225 sec No’s of pipe 2
Auxiliary required for operation:-
Air compressor For instrument air Transport air Air Dryer
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 3 of 7
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 4 of 7
OPERATING PROCEDURE -
Sr. RESPONSIBILITY
Description
No. DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned.
2 Power supply and control power supply of all relevant auxiliary
available.
3 Silo ventilation system is running.
4 At least one fluidizing blower is running.
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 5 of 7
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 6 of 7
INTERLOCKS : Remarks
ABRIVIATIONS / NOTATIONS:-
o SOP: StandardOperating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o EE: Electrical Shift Engineer
Issue No: 1 Issue Date: Revision: 0 Revision Date: File no: Page 7 of 7
DO’s :
1. Ensure Instrument Air Header & Service Air Header Pressure is healthy before starting of the system.
3. Ensure Air Dyer is properly working (i.e. dew point is to be properly monitored).
4. Before starting, ensure that the conveying line is flushed (i.e. free from residual ash).
DONT’s :
4. Don’t run the system in case of any leakage in the conveying line.