Station 1 
1st Generation 500 MW Unit
Parameter Design Actual
PAPH 27 VIM 1850 (12 sector) ‐
FG I l T
FG Inlet Temperature  368 351
FG out let Temperature 138 105
Air inlet temperature
Air inlet temperature 36 36
Air Out let Temperature 343 258

Air side DP
Air side DP 35 50

Gas Side DP 77 120

SAPH 30.5 VIM 1550 (24 sector) ‐
FG Inlet Temperature  368 367
FG out let Temperature
FG out let Temperature 138 156
Air inlet temperature 30 30
Air Out let Temperature
p 325 334
Air side DP 35 40
Gas Side DP 77 95
Station 1 
1st Generation 500 MW Unit
Design Actual

343 368 325 368 367 334 351 258

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

36 138 30 138 156 30 105 36


PAPH SAPH SAPH PAPH
Station 1 
2nd Generation 500 MW Unit
Generation 500 MW Unit
Parameter Design Actual
PAPH 27.5 VIM 2000 (24 sector)
( )
FG Inlet Temperature  335 346
FG out let Temperature 125 141
Air inlet temperature 35 35
Air Out let Temperature 314 303
Ai Sid
Air Side 38 35
Gas Side 75 78
SAPH 30.0 VIM 2000 (24 sector)
30.0 VIM 2000 (24 sector)
FG Inlet Temperature  335 346
FG out let Temperature 125 141
Air inlet temperature 30 30
Air Out let Temperature 312 304
Air Side
d 39 35
Gas Side 75 79
Station 1 
2nd Generation 500 MW Unit
Design Actual

314 335 312 335 346 304 346 303

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

35 125 30 125 141 30 141 35


PAPH SAPH SAPH PAPH
Station 2 
1stt Generation 500 MW Unit
G i 500 MW U i
Parameter Design Actual
PAPH 25 VAL1300 (12 sector)
25 VAL1300 (12 sector) ‐
FG Inlet Temperature  385 375
FG out let Temperature 141 154
Air inlet temperature 44
Air Out let Temperature 298 267
Air side DP 28 49
Gas Side DP 96 78
SAPH 29 5VAR 2100 (24 sector)
29.5VAR 2100 (24 sector) ‐
FG Inlet Temperature  358 375
FG out let Temperature
p 140 173
Air inlet temperature 31
Air Out let Temperature 327 327
Air side DP 60 70
Gas Side DP 95 125
Station 2 
1st Generation 500 MW Unit
Design Actual

298 385 327 358 375 327 375 267

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

41 141 30 140 173 30 154 41


PAPH SAPH SAPH PAPH
Station 2 
2nd G
Generation 500 MW Unit
ti 500 MW U it
Parameter Design Actual
PAPH 27 5 VIM 2150 (24 sector)
27.5 VIM 2150 (24 sector)
FG Inlet Temperature  362 378
FG out let Temperature 125 135
Air inlet temperature 35 35
Air Out let Temperature 339 332
Air side DP 35 80
Gas Side DP 77 140
SAPH 30 5VIM 2000 (24 sector)
30.5VIM 2000 (24 sector)
FG Inlet Temperature  362 389
FG out let Temperature
p 125 157
Air inlet temperature 30 30
Air Out let Temperature 338 365
Air side DP 38 45
Gas Side DP 77 160
Station 2 
2nd Generation 500 MW Unit
Design Actual

339 362 338 362 389 365 378 332

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

35 125 30 125 157 30 135 35


PAPH SAPH SAPH PAPH
Station 3 
1st Generation 500 MW Unit
Generation 500 MW Unit
Parameter Design Actual
PAPH 27 VIM 1850 12 sector
FG Inlet Temperature  369 375
FG out let Temperature 135 170
Air inlet temperature 35 35
Air Out let Temperature 346 300
Air side DP
Air side DP 35 50
Gas Side DP 77 140
SAPH 30,5 VIM 1550 24 sector
FG Inlet Temperature  369 375
FG out let Temperature 135 170
Air inlet temperature 30 30
Air Out let Temperature 321 299
Air side DP
Air side DP 35 90
Gas Side DP 77 75
Station 3 
1st Generation 500 MW Unit
Design Actual

346 369 321 369 375 299 375 300

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

35 135 30 135 170 30 170 35


PAPH SAPH SAPH PAPH
Station 4 
1st Generation 500 MW Unit
Generation 500 MW Unit
Parameter Design Actual
PAPH 27VIM 1550 (12 sector)
27VIM 1550 (12 sector) ‐
FG Inlet Temperature  358 365
FG out let Temperature 133 159
Air inlet temperature 35 35
Air Out let Temperature 320 313
Ai Sid
Air Side DP 3
35 43
Gas Side DP  70 89
SAPH 30 5 VIM 1750 (24 sector)
30.5 VIM 1750 (24 sector) ‐
FG Inlet Temperature  358 385
FG out let Temperature 133 168
Air inlet temperature 30 30
Air Out let Temperature 320 335
Air Side DP 35 45
Gas Side DP 70 139
Station 4 
1st Generation 500 MW Unit
Design Actual

320 358 320 358 385 335 365 313

Ai
Air FG Ai
Air FG FG Ai
Air FG Ai
Air

35 133 30 133 168 30 159 35


PAPH SAPH SAPH PAPH
APH CRITICAL ISSUES
• Gas distribution at variance from design
G di t ib ti t i f d i
• Higher than design leakage
• Higher than design FG exit temperature
Higher than design FG exit temperature
• Fast deterioration in performance after overhaul
– Increase in seal leakage
g
– Basket chocking
• Non uniform basket erosion
• ALCS t fit
ALCS retrofit
• Basket cleaning methods
• Gap between diaphagram and basket
Gap between diaphagram and basket   
• Basket replacement criterion 
• p
Airpreheater R&M issues
– Foundation  & Support structure 
– Time period
• Thrust on ESP performance
Th ESP f
THANKSS