Stopping Of One PA fan BRBCL
3) Procedure: -
1. Bypass discharge gate close permissive & auto opening of discharge gate for the
PA fan which is to be stopped
2. Gradually reduce load in CMC to 150 MW with 04 mills in service after
unloading & stopping of 5th mill at around 200 MW.
3. Take machine in manual mode( approx Load 150 MW, Throttle pressure 115
Ksc)
4. Take oil support in one elevation in running 04 mills (Example CD oil guns with
Mills B,C,D,E in service) and gradually unload 4th mill (Example Mill E) by
closing HAD/Opening CAD/unloading & stopping coal feeder) and reduce its
primary air gradually by keeping Hot PA header constant & Keeping watch on
PA fans current/blade pitch/discharge temp.Both the PA fans discharge air
temperature should be equal/ fans should not be getting stalled)
5. After stabilizing unit with 3 mills and oil support in one elevation (Example
Mills B,C,D & Oil support in CD elevation & Load approx 135 MW ) reduce
gradually the Hot PA header set point & thereby actual Hot PA header pressure
to 730 mm of WC and observe flame and furnace pressure.