Katahira & Engineers International Package Chainage: CH 38+620 - CH 39+073 Reply by: Sheet
MG Through PK-A
Comment Management Sheet A Structure: Via-Duct KEI 1
Consortium
Recheck the vertical soil pressure, surcharge Back wall project out from the abutment stem is not considered for soil
1 calculations. Check and confirm the back-wall stem vertical pressure and the effect is revisited and attached under item 02.
extended outward from the abutment stem area is not
considered in the soil pressure surcharge calculations.
Recheck sliding stability and check for the use of Revised sliding stability calculations are attached.
shear key.
2
The footing base shall be rested on firm rock with the Agreed.
.
4 consent of the Engineer.
5 Parapet on wing wall details are not provided. Design of parapet wall on wing walls are submitted by the report no.CEP-
2/PK-A/ST/BR/TYP/001/R00
Check the requirement of the service ducts provided
Service ducts are shown for as the parapet wall section is shown.
6 in the layout.