JAEQR
Submission Submission of spherical bearing for bridge system
Reference CPCC/CECB/MP/013993 Date 03th July, 2019
CPCC Received
Type/ RB02 Bridge pile cap
Structure
Review Document: RB02 Bridge pile cap bar bending schedule
1). Check the No. of bars in each and Total No. of bars in Bar marks 400, 400a, 401, 401a, 425, 425a, 426, 426a,
427, 450, 450a, 452, 452a, 600, 600-1, 600-2, 600a.
2). Check the total length of bars 450, 450a, 452, 452a, 453, 600, 600-2, 600a.
3). Add the bar mark 452a in section A and correct the bar numbers in section B.
4). Add Details of links have different shape than 452a into the Table
5). Add the details of bar 451 and 953 into the Table.
6). Check the indicated bars with 451 bar mark in the section A.
Hence, provided technical details of Pile cap bar bending schedule (Vehicular Bridge RB02) according to the BS
8666:2000 are insufficient and cannot be approved.