Professional Documents
Culture Documents
09 09 03 08 04 2T16-08 08 07 07
2T20-04 2T20-04 01 2T25-09 750 2T20-03
(L=4000)
2T25-07 2T20-03 5. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH
(L=4500) 1000 (L=4500) 600 ALL RELEVANT STRUCTURAL,ARCHITECTURAL,SERVICE&
SPECIFICATION.
9T8-10-200 16T8-10-125 7T8-10-200 16T8-10-125 16T8-10-125 16T8-10-200 28T8-10-200
CA CB CC CD 5 T 10 - 06 - 150 T
1275 1275 01 01
11 11 Bar Location T - Top (T1 Outer, T2 Inner)
B - Bottom (B1 Outer, B2 Inner)
2T25-15 2T20-16 Bar Spacing
450
2T20-11 2T25-11a 2T25-11a 2T20-12 10
02 (L=3000) (L=3000) NF - Near Face
450
20
11a 11 15 15 12 11a 16 16 Bar Mark FF - Far Face
BF - Both Face
09 09 Bar Diameter
19 09 04 04
14 04 225 Bar Type 'T' or 'R'
19 19 13 18 14 2T16-18 18 13 13 225
2T25-14 02 2T25-19 2T20-13
(L=4000)
2T16-17 2T20-13
(L=4500) (L=4500) SECTION 01-01 Number of Bars
16T8-20-125 05T8-20-200 16T8-20-125 16T8-20-125 18T8-20-200 28T8-20-200 SECTION 02-02
9. NOMINAL COVER
BEAM
BEAM CGB3 (450x225) ALL SIDE = 25mm
2T20-31
2T20-23
2T16-29a 2T16-30 1200 (L=3000)
2T20-21 2T20-22
03 (L=3000) (L=3000) 22 30 31 31 24 23
29a 29a 22 21 30
36 27 28 2T16-36 36 35
2T20-28 2T20-27 2T20-27 2T16-35
28 (L=4500)
2T20-29 03 2T20-29 (L=4500)
2D1B3 CB3
CB CC CD
6000 6000 3610
1500 1500 1500
21 21
1200 29a 29a
2T20-24
2T20-32 2T16-33
31 32 2T20-25 2T20-25
(L=3000) (L=3000)
450
24 23 37
32 33 33
29 29
35 35 225
2T20-27 2T16-35 34 27 34
(L=4500) 2T20-26 2T16-34 2T20-26
(L=4500)
28T8-37-200 28T8-37-200 18T8-37-200 SECTION 03-03
CB3 2D1B3
CA CB
4943 6000 6000 6000
1500 1500 1500
2T20-45 2T20-45a
2T20-38 2T20-39 2T20-46
(L=3000) (L=3000)
04 45 45 39 38 45a 45a 46
(L=3000)
46
30 40 39
52 2T20-52 43 44 52 51 51 50 42 43 50 49
2T20-44 04 2T16-51 2T20-43 2T20-43 2T20-42 2T16-50 2T20-42 2T16-49
(L=4000)
(L=4000) (L=4000) (L=4000)
24T8-53-200 28T8-53-200 29T8-53-200 13T8-37-200
6000 6000 38 38
PROJECT
1500 1500
2T20-40
2T20-47
2T20-40
PROPOSED TECH - CITY PROJECT
(L=3000)
AT WALAHANDUWA
450
46 47 47 53
40 39
GALLE.
52 52 TITLE
44 44 DETAIL OF BEAMS RESTAURANT
49 41 49 42 48 48
2T20-42 2T16-49 2T20-48 2T20-41 600 225 BUILDING C3,C4 BLOCK LOWER GF (CGB1,CGB2,
(L=4000) (L=4500) DGB1,DGB2,CGB3,DGB3,CGB4,2D1B3,2D1B4) SHEET 1/05
28T8-37-200
13T8-37-200
SECTION 04-04 DRAWN M.D.D.C DRAWING NO.
DESIGN
M. P. S. QS / TD / 2021 / 138 - ST 330-01