Professional Documents
Culture Documents
1100
1100
1100
1100
988
988
988
988
750 750
750
750 750
750 750
ALL RELEVANT STRUCTURAL,ARCHITECTURAL,SERVICE&
2200
2200
2200
2200
1500
1500
1500
1500
SPECIFICATION.
2200
2200
2200
2200
G1 H1
750
1100
1100
1100
1100
1212
1212
1212
1212
750 750 6. CONCRETE GRADE - C30.
F7,C2 F7,C2
3000 2500
3000
1138 1362 2200 2500 1500
1500 F5,C1 F5,C1 1750 1750
875 875 F6,C5 1129 621 7. COVER TO ALL REINFORCEMENT
737 763 1488 1262 F3,C1 F4,C1 F4,C1 1262 1488 F3,C1 F4,C1 F6,C4
2500 1100 1100 1363 1137 1362 1138
1375
1375
2750
1250
1250
1250
1250
1212
1212
2750 BELOW GROUND - 50mm
837
837
750
750
COLUMN - 25mm
2200
2200
2500
2750
2500
2500
2750
2500
1500
1500
1750
1750
G2 750 H2 BEAM - 25mm
750
SLAB - 20mm
913
913
988
988
1250
1250
1250
1250
1375
1375
2500 1100 1100
C8
750 750
F7,C2
9000
3000
3000
9000
1138 1362 2200 2200 2500 2500 1500 1750
F5,C1 F5,C1
1488 1262 F3,C1 F4,C1 1269 1481 F3,C1 F6,C5 1142 608
2500 F4,C1 1100 1100 1363 1137 1362 1138
1375
1375
1250
1250
1250
1250
1212
1212
2750 2750
874
2200
2200
2500
2750
2500
2500
2750
1750
G3 H3
2500
876
988
988
1250
1250
1250
1250
1375
1375
2500
1138 1362 F4,C1
2200 1100 1100
F4,C1 2200 2200
3000
3000
1500
1499
1083 1117
1375
1372
1375
1377
1138
1105
1100
1060
874
791 709
2200
2200
3000
2200
2750
3000
2750
2750
2750
1750
2200
1500
G4 H4
876
1062
1095
1100
1140
1373
1375
1378
1375
1499
1500
492 1008 F7,C4 F5,C4
F1,C3 F3,C3 F3,C3 F1,C3
3024
1100 1100
3005
10
°
2200 2200 2200 2200 2200 2200 2200 2200 2200 2200
1100 1100 1100 1100 1100 1100 1750
2774
2776
1100 1100 1100 1100 F5,C5 1100 1100 F5,C5 1100 1100 1100 1100 F5,C5 1100 1100 F5,C5 1100 1100
1500 F5,C5 F5,C5 F5,C5 F5,C5 F5,C5 F5,C5 1142 608 F6,C5
F7,C5 900 600
1137
1135
1137
1137
1136
1136
1136
1136
1136
1136
915
712 788
2200
2200
2200
2200
2200
2200
2200
2200
2200
2200
1750
1500
835
1063
1063
1063
1065
1064
1064
1064
1064
1064
1064
LAYOUT OF FOUNDATIONS & COLUMNS RESTAURANT BUILDING C7,C8
(FOOTING TO GROUND FLOOR)
LEGEND
COLUMN TYPE COLUMN SIZE
C1 400x225
C2 225x225
C3,C4 300x300
C5 ∅300
SCHEDULE OF FOOTINGS
DETAIL OF COLUMN REINFORCEMENT
TYPE LENGTH WIDTH THICKNESS REINFORCEMENT
L W T1 T2 RF1 RF2 T1 & T2 (TOP NET)
10 10
10 10 F1 3000 3000 550 650 T16-150 T16-150 T10-200 B/W
F2 2900 2900 550 650 T16-150 T16-150 T10-200 B/W
UPPER GROUND TO
03 03 04 04
01 01a 01 02 02 F3 2750 2750 500 600 T16-150 T16-150 T10-200 B/W
300
300
225
225
01 01a 01 02 02 03 03 04 04
F5 2200 2200 425 425 T12-125 T12-125 -
F6 1750 1750 400 400 T12-125 T12-125 -
400 225 300 300
F7 1500 1500 350 350 T12-150 T12-150 -
F8 1250 1250 300 300 T12-150 T12-150 -
MAIN BARS 04 T20 - 01 - VERTICAL BARS 04 T20 - 02 - VERTICAL BARS 04 T25 - 03 - VERTICAL BARS 04 T20 - 04 - VERTICAL BARS
02 T16 - 01a - VERTICAL BARS
E.G.L.
LINKS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS
D
10 10 RF1
10 10
RF2
UPPER GROUND FLOOR
10
LOWER GROUND TO
T2
03 03 04 04
T1
01 01a 01 02 02
05
1:3:6 SCREED
300
300
Ø300 05
225
225
CONC.
05 WxL
50
05 WELL COMPACTED
01 01a 01 02 02 03 03 04 04 SOIL FILL
05 05
MAIN BARS 04 T20 - 01 - VERTICAL BARS 04 T20 - 02 - VERTICAL BARS 04 T25 - 03 - VERTICAL BARS 04 T20 - 04 - VERTICAL BARS 06 T20 - 05 - VERTICAL BARS
02 T16 - 01a - VERTICAL BARS
SOIL
LINKS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS
E.G.L. DATE REVISION REV.
DESIGN & BUILD CONTRACTOR
REFER COLUMN DETAIL
RF1
FOR COLUMN R/F.
10 10
10 10 RF1 600
D
LOWER GROUND FLOOR
T2
05
FOOTING TO
T1
X X Email : maga@maga.lk
300
300
RF2
05
225
225
Ø300
L
05
05 PROJECT
ROCK ANCHORS
600
01 01a 01 02 02 03 03 04 04
05 05 T20 @ 600C/C BROTH WAYS
T20 @ 600C/C PROPOSED TECH - CITY PROJECT
400 225 300 300
WxL AT WALAHANDUWA
GALLE.
TYPICAL ROCK ANCHOR DETAIL ROCK ANCHORS
MAIN BARS 04 T20 - 01 - VERTICAL BARS 04 T20 - 02 - VERTICAL BARS
04 T25 - 03 - VERTICAL BARS 04 T20 - 04 - VERTICAL BARS 06 T20 - 05 - VERTICAL BARS TITLE
02 T16 - 01a - VERTICAL BARS W NOTE:- FOUNDATION & COLUMN LAYOUT
LINKS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS
1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS 1 - SET T8-10-150 - STIRRUPS PLAN IF BED ROCK IS ENCOUNTERED IN ANY FOUNDATION LOCATION, (FOOTING TO GROUND FLOOR)
THE CONDITION OF ROCK SHOULD BE INFORMED TO STRUCTURAL
(TYPICAL COLUMN FOOTING) ENGINEER.FOUNDATION SIZES AND ROCK ANCHORS WILL BE RESTAURANT BUILDING - C7,C8 BLOCK
DETERMINED ACCORDING TO THE ROCK CONDITION
TYPE OF C1 DRAWN M.D.D.C DRAWING NO.
C2 C3 C4 C5 AND THE COLUMN REACTION.
M. S. P.
COLUMN DESIGN QS / TD / 2021 / 138 - ST 400
L.G.S.J.E DATE SCALE REVISION
CHECKED
21.08.2021 1:125